SAP R/3 Business Blueprint

SAP R/3 Business Blueprint. Chapter 6 ”Production Logistics”. Production Logistics (P.L.). Is the SAP solution for a modern production planning and control system It provides quick deliverability It is flexible

cleta
Download Presentation

SAP R/3 Business Blueprint

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAP R/3Business Blueprint Chapter 6 ”Production Logistics”

  2. Production Logistics (P.L.) • Is the SAP solution for a modern production planning and control system • It provides quick deliverability • It is flexible • Offers high level of performance for the planning and control of the total material flow

  3. MRP II • MRP II is a internationally recognised planning concept • Shortcomings with MRP II: • Planning is treated separate from managing actual production activities • The approach does not provide support for other current initiatives • P.L., along with its links to R/3, is an implementation that effectively overcomes these two shortcomings

  4. Production Logistics Organisa- tional Units Supply Chain Scenarios Production Business Objects Business Process

  5. Production by Lot Size • A make-to-order strategy that allows a company to produce several customer requirements in one lot • The strategy is to be responsive to customer demands while keeping stock and production runs to a minimum • Production work orders controls the requirements and what to produce • => noncustomer order-specific production

  6. Production by Lot Size II • Scenario flow: • Sales and operation planning • Demand management • Material requirements planning • Creation, release, and execution of the production work order

  7. Repetitive Manufacturing • Refers to production of identical or similar products on high-volume production lines • Production schedules are used to manage production (instead of production work orders) • The schedules gives which products to manufacture and in which sequence

  8. Repetitive Manufacturing II • Scenario flow: • Sales and operation planning • Demand management • Customer demands and long term production plans • Creation, release, and execution of the master schedule

  9. Make-to-Order Production • Strategy for individually managing the production associated with specific customer sales orders • Production and procurement costs are tracked to individual sales orders • This results in detailed reporting and analysis of the planned and actual costs for each order • Same scenario flow as Prod. by Lot Size

  10. Process Manufacturing • The SAP R/3 scenarios for process manufacturing manage the planning, execution, and control activities for process-oriented manufacturing • The Reference model contains different scenarios, including: • Continuous production • Manufacturing in a continuous process over time • Discontinuous production • Manufacturing in stages • Regulated production • Requires that the process orders meet rigorous quality standards and legal requirements

  11. Process Manufacturing II • Scenario flow: • Sales and Operation Planning • Demand Management • Generation of long-term production plans and master schedule • Computation of material flow • Production is managed by the production order • Material is received from or issued to production and the process order is completed and closed out.

  12. Project-Related “Engineer To Order” • The engineer-to-order manufacturers require a system that synthesises the best from • Production Management • Project Management • The project-related, engineer to order scenario, describes a process for managing the production of complex items

  13. Project-Related “Engineer To Order” II • Scenario flow: • Establish a project structure to quote a customer job • Detail cost plans are developed and integrated into a budget • The project is the released for processing

  14. Quality Management for Goods Receipt from Production • This scenario integrates the goods receipt transaction into an enterprise wide quality system • It can be used in any environment to support quality improvement programs

  15. Quality Management for Goods Receipt from Production II • Scenario flow: • Goods receiving function • R/3 uses data from that function to generate the Quality Management order • The Q.M. order is used to control the inspection process and record results • When all results are recorded, the Q.M. order is closed and inventory lot is moved into stock-keeping area or next step in production