An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KRISHNAPATTINAM UMPP OPTION 1 TN UMPP D/C QUAD MOOSE 765 KV HVDC B2B

  2. KRISHNAPATTINAM UMPP OPTION 2 TN UMPP D/C QUAD MOOSE 765 KV HVDC B2B

  3. COMMENTS ON KRISHNAPATTINAM AND TN UMPP EVACUATION PLAN • THE FOLLOWING 400 KV LINES WOULD BE STRESSED • CUDDAPAH-KOLAR-SOMANAHALLI • KOLAR - MELKOTTAIYUR • HOSUR-SALEM • RAICHUR EVACUATION BOTTLENECK IN CASE OF 765 KV LINE TRIPPING • NUNNA-KHAMMAM-N’SAGAR • SRISAILAM-KURNOOL • NUNNA-NELLORE D/C EVACUATION WITH VEMAGIRI • HIGH VOLTAGES ARE ALSO A CAUSE OF CONCERN AND ADEQUATE REACTIVE ELEMENTS MAY HAVE TO BE PROVIDED

  4. UMPP EVACUATION BASE CASE TALCHER-KOLAR NIL 2500 MW EXPORT TO WR ON 765 KV RAICHUR-SHOLAPUR

  5. KRISHNAPATTINAM UMPP • CREATE ONE MORE 400 KV STATION NEAR CHENNAI FOR FULL FLEDGED RING MAIN • 400 KV STATION AT DB PURA NEAR BANGALORE AS NELAMANGALA IS TOO CONGESTED NAGARJUNA& ONGC PLANT SRLDC OPTION-A TN UMPP D/C QUAD MOOSE 765 KV RING CONSISTING OF NELLORE, MELKOTTAIYUR, ARASUR, HIRIYUR AND RAICHUR 765 KV HVDC B2B