An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CollidersLinkingInitiative to Medical applications and BeyondCLIMB M. Aicheler 24.10.2012

  2. Proposal for a CLIC ITN K. Österberg, Department of Physics, University of Helsinki & Helsinki Institute of Physics kenneth.osterberg@helsinki.fi EU/FP7 Marie Curie Initial Training Network (ITN) call: FP7-PEOPLE-2013-ITN application deadline: 22.11.2012 This proposaliscreated in collaboration with: bgator

  3. General RF technology (RF) A CLIC-focused multi-site-ITN on Normal Conducting (NC) accelerator technology CLIC CLIMB MedicalAccelerators (MA) CLIC focused: • High gradient research: simulation & experiment • RF design & testing • Test stand development General RF technology: • ultra high precision machining & assembly • coatings for Vacuum technology • Tuneable permanent magnets • Wake field monitors • X-band in free electron lasers Medical Accelerator technology • RF design with X-Band experience • Development and testing of MA prototype structures • klystron development 5 MW @ 12 GHz

  4. Presentstatus of the scientific and technical program 2 industriallevel 1 partners (underconsideration…) 1st draft of B.2 part isready!

  5. Summary: • Number of ESRs: 13 • Number of level 1 Partners: 10 (2 industrial) • Number of level 2 Partners: approx. 5 (2 industrial) • Number of involved countries (lvl1): 7 • Number of CERN hostingESRs: 3 Mypersonal goal: Create an outstandingcomplementary training plan