CCHBC Poland Demand Side Response. Grid : Yesterday. SMARTGrid : Tomorrow. Energy Price is Fluctuating. Energy Price. Needs for Energy. Grid Balancing. Needs for Energy in Poland. PRODUCTION. DEMAND. Needs for Energy – Realistic Scenario. Mature blocks closeout, up to 4,4 GW power.
E N D
Needs for Energy in Poland PRODUCTION DEMAND
Needs for Energy – Realistic Scenario Mature blocks closeout, up to 4,4 GW power PRODUCTION DEMAND
DSR idea Demand Side Response (DSR): temporary reduction of energy consumption, implemented on demand, realized according to schedule agreed by Energy Consumer and Supplier Technology Supplier / VEMS Operator = VemsEcoFound DSR Integrator = WSEInfoEngine / Sparkhouse
How Demand Response Events Works? Notify Respond Restore
How it will work MW / STAND BY / MWh PSE / OSD INDUSTRY VEMS SYSTEM / DSR ENABLER AGGREGATOR: SPARKHOUSE/ INFOENGINE BUSINESS PUBLIC INSTITUTIONS HOSPITALS ENERGY WHOLESALE MARKET SHOPPING MALLS
DSR issafe AUTOMATIC OR MANUAL
How Demand Response Events Works? Aggregator operating energy management system Automated power reduction aggregation in all managed entities through VEMS
VEMS management Operational platform for power reduction management in distributed entities = VEMS Enabler DSR
DSR Potential in Poland Power demand in peak times relates to approx. 1% of the whole year period (50-70 hours) Need for DSR may reach from 500 MW to 4000 MW Current costs of extraordinary power supply for peaks reach 600-800 mln PLN
VEMS: Core Energy Management System Virtual Energy Management System (VEMS) VEMS allows power use reduction during peak energy demand periods.
Step 1: Energy Efficiency Rationalization of ventilation, heat and cooling management Reduction up to 30%
Step 2: Energy Consumption Profile Optimization Roster unit profile optimization for dealing unit Profiting from daily profile changes (price x quantity) Energy measurement management Daily profile changes technical handling
Step 3: DSR System Operating Profiting from: DSR and daily profile changes DSR deals Power reduction technical handling
Energy = Costs? income costs
DSR Program Participation New income source Media costs reduction No investment costs for Partner (*) (*) Possible exception in case of necessary measurement infrastructure adjustement or repair
Case: Energy Savings VEMS ON
Welcome to DSR in Poland https://www.facebook.com/Virtual2Power