IWADP- RKVY Project A Zero tolerance income doubling project

IWADP- RKVY Project A Zero tolerance income doubling project. Talukas- Kaprada, Dharampur, Nizar, Ucchal, Dediapada & Sagbara For the years 2009-13. IWADP- RKVY. Integrated Wadi & Agriculture Diversification Project under RKVY Objective

colby
Download Presentation

IWADP- RKVY Project A Zero tolerance income doubling project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IWADP- RKVY ProjectA Zero tolerance income doubling project Talukas- Kaprada, Dharampur, Nizar, Ucchal, Dediapada & Sagbara For the years 2009-13

  2. IWADP- RKVY • Integrated Wadi & Agriculture Diversification Project under RKVY • Objective • To double the real income (inflation sustainable) of participating farmers in terms of yield & returns • Rs. 348 crore, 4 years project supported by RKVY, TDD, NREGS & GTDC

  3. 3-Sigma Zero Tolerance Project • Over 99.7% accuracy in following activities desired • Input delivery to participants • To be achieved through • Transparent selection of NGOs • Heavy reliance on open tendering for procurement and synchronization of inputs • Reliance on RDD BPL list • Saturation approach • Putting details of participants on project website • Farmers’ entry level contribution • Lowered subsidy under project • Input delivery from Taluka level notified godowns • GPS/ cartosat based monitoring • Continuous evaluation & putting findings on website • Strict action against defaulters

  4. Project components

  5. Applicable instructions • NGO Management Manual of DSAG • DSAG 6 Frameworks • MIS promotion with GGRC • DSAG instructions on group wells • DSAG & RDD instructions for NREGS convergence • DSAG instructions on symbols

  6. DSAG Frameworks • Focus on women participants • Husband can be landholder • Project’s contact with women only • Need for at least 50% women extension staff • Training & exposure visits of women participants only • Ethics • Ethical conduct with project functionaries • Complete transparency, all critical information to be placed on public domain • Above board procurement • No gifts, political pressure, extra-ordinary treatment to visiting project functionaries

  7. Expectations from partner NGOs • Timely deployment of project staff • Dedicated project staff without even temporary diversion • Sincere efforts to meet time line • Timely submission of Monthly Progress Reports • Proper training & management of farmers • Highly professional conduct • Meeting the service level parameters of project • Achieving project outcomes

  8. User groups • Key contact points for implementers • 600 UG to be formed • Possible functions • Savings & credit • Ownership & Operation & Maintenance of project assets • Collecting user fees • Raising loans for farmers’ contribution • Directly taking up promotion of vermicompost, pilot crops • IEC contact point • Information dissemination • Assistance in accessing other beneficiary oriented programmes- pensions, i. g. schemes, NRM activities, nutritional plants in govt. schools • Promotion of kitchen gardens • Organized marketing of produce • Handling of post harvest systems

  9. Withdrawal & termination • Farmers • 15% admissible in year-1, including termination • Termination can be for indifference, non-compliance, non-contribution of annual participation fee and diversion of inputs • 15% & 8% replantation of horticultural plants after Y-1 & Y-2 admissible • 30% & 15% non-compliance of farmers with training instructions admissible after Y-1 & Y-2 • Notice & hearing at NGO level • NGO - 20% non-compliance in field staff performance admissible • Discontinuation due to major breach of conditions, violation of frameworks, serious non-compliance of instructions, deviations from Service Level Agreements • Notice & hearing before termination

  10. Q-1 Activities • Signing of agreement with DSAG • Project & NGO’s role, applicable frameworks, funding & staff details, fate of project assets during & after the project, minimum service levels, expected outcomes & 3 sigma expectations, good governance requirements, transparency & consent on disclosures • Bank account and fund release formalities • NGO data base on Project web site • Induction of project staff • Arranging Basic Training-1

  11. Q-1 Activities • Identification of village • Conducting PRA with potential participants • Starting dialogue with PRI representatives • Project components & financial terms • NREGS linkage Conducting village, field & beneficiary survey • Present status of on-farm sector in the village • Agro assets available • Gross produce & market linkages • Sources of credit & Indebtness • General socio-economic condition • Cropping intensity • Farm mechanization • Irrigation availability • Cattle wealth & related issues

  12. Q-1 Activities • Farmers’ selection • Even non-ST BPL can join • Preference to PTG & widows • FRA land to be compulsorily included, crop change permitted for FRA land • Collecting “joining contribution” from farmers • Obtaining undertaking • Getting NREGS card • Training & exposure visits of farmers • Carrying out remote sensing study for potential new water bodies • Developing & implementing NREGS project for CD, wells & soil & moisture conservation activities • Raising farmer’s contribution & developing loan proposal from GTDC

  13. Q-1 Activities • UG formation & nurturing • Training & monthly meetings • 2-3 activities • Taking up few beneficiary oriented schemes as entry point activities • Pensions • Tools & seed assistance • Training programmes for youth • Admission of girls in GRS • Chiranjivi & RSBY • Micro-finance • Vermicompost pits • Identifying designated godowns

  14. Q-1 Activities • Putting into place project management & monitoring system • Procurement of laptops, camera, GPS equipment, forms & registers • Timely submission of various reports • Getting the fields in a state of readiness • Cropping plan and income estimation • Land leveling- NREGS • Soil testing- seed vendor/ NGO • Pits- NREGS • Contour khet talavadis- private/ public land, NREGS • Taking up micro-finance component

  15. Project website • Project document & related instructions • Various forms & formats • Beneficiary list & details of inputs provided • NGO selection process & NGO data sheet • Progress reports, expenditure & evaluation reports • Baseline report • Field pictures • Project staff details • IEC & training material • List of CD & wells • Addresses of User Groups & sarpanches of project villages • Annual reports of partner NGOs

  16. List of procurements started • Seed & sapling and marketing of produce • IT based microfinance • Farm mechanization • Research & evaluation agencies • IEC agency • Project implementation manual • Construction of godowns

  17. Suggestions invited • Y-0 training requirement of workers & farmers • Roles expected from Agriculture polytechnics & Krishi Vikas Kendras • Forms & registers at various levels • Financial accounting system • Contents of survey & monitoring forms • Y-0 IEC material for workers & farmers • Which aspects require clearer elaborations & guidelines • Contents of project management manual

  18. Project implementation structure • DSAG will • House State Project Management Unit • Select partner NGOs & finalize their terms • Issue broad guidelines & decide modifications in project • Converge funds & deal with funding agencies • Finalise large tenders • Monitor project • Develop state level IEC material • Manage project website • Develop project implementation manual

  19. Project implementation structure • Project Administrators • House District Project Cell • Day to day management of project & NGOs • Recommend fund release • District level coordination with line departments & convergence • Obtain Technical Sanctions for civil structures • Day to day monitoring of project • Quality control • Ensure compliance with project guidelines, esp. 3-sigma requirements • Monthly review meeting, trouble shooting & feedback to SPMU • Can consider implementing part of the project directly

  20. Project implementation structure • NGO • House Project Implementation Unit • Interface with farmers & other vendors • Taluka level implementation of project, including vendor management • Process Documentation • Fund Management and reporting

  21. Monitoring system • Key to project success • Beneficiary & inputs details on website • Baseline data on every farmer & project village • NGO level • Project supervisors’ visits, verifications & reports • Meeting action plan deadlines • Monitoring actual yields/ returns to farmers • Monthly review & planning meetings with field workers & supervisors • Submission of field workers’ diaries & field photos to PA • Submission of MPR • GPS data of farmers’ fields • Project Administrator level • Analysis of MPR and take the required action on it • Monthly review meetings with NGOs • Regular field visits by District Project Cell staff & video monitoring

  22. Monitoring system • DSAG • Uploading farmers’ details & photo-documentation on website • Concurrent monitoring & evaluation mechanism • Analysis of field reports • Independent random verifications by SPMU & external personnel • Quarterly review meetings with DPC & PIU • Annual review & supervision workshop • Mounting annual supervision missions

  23. Key dates for Q-1

  24. How will a project village look after 2 years? • Every potential family covered • Full water harvesting potential achieved • Income doubling started • Farm mechanization, micro-finance, irrigation, Micro Irrigation facilities available • Financial inclusion for every family • Known in the market for a particular crop • UG viable & sustainable (both financially & managerially) • Positive “externalities” • PRI aware about the project • Impact on HDI • Some diversification to secondary & tertiary sectors

  25. List of Shortlisted NGOs

  26. Yet to be done • Funding pattern of individual components • Taluka-wise targets • Staffing- cost, numbers, qualifications, role, performance targets • NGOs & talukas assigned to them • Monitoring forms • Accounting system • NGO performance parameters for Y-0 • Workers’ training requirement for Y-0 • Farmers’ training requirements for Y-0 • Village selection- which villages to be selected • Immediate IEC material • Undertakings & cash contribution from farmers • Documentation & reporting requirements • Tap drinking water supply & linkage with CD • Baseline survey • Findings of past evaluations