VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007. Looking US, Feb. 2007 - BEND #1. GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY. Looking DS at supercritical flume-good hydro data.

cole-rose
Download Presentation

Looking US, Feb. 2007 - BEND #1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHEDGOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007

  2. Looking US, Feb. 2007 - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY

  3. Looking DS at supercritical flume-good hydro data GOODWIN CREEK – FLOOD APR 6, 2005

  4. THE PLAN Actually Derrick’s cheat sheet PIX BY DANNY KLIMETZ

  5. LET’S GET IT STARTED

  6. 1 of 7 trucks stuck GOODWIN CREEK – CONSTRUCTION - FEB 2007 –DANNY KLIMETZ

  7. CUT Typical post-project cross-section CUT FILL LPSTP

  8. Looking DS, digging floodplain bench & placing soil along toe of right bank GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

  9. Sloping upper bank - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

  10. Dave Derrick teaching some of the 44 workshop participants GOODWIN CREEK–CONSTRUCTION-FEB 27, 2007–DANNY KLIMETZ

  11. The cutting, toting, & planting crew, I mean the workshop participants GOODWIN CREEK–CONSTRUCTION-FEB 27, 2007–DANNY KLIMETZ

  12. Positioning & planting RPM trees & shrubs - BEND #1 GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ

  13. Or slap a Sycamore with the trackhoe & release a thousand seeds GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

  14. Rolling and spreading hay mulch - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN

  15. BEFORE & AFTERS OVER TIMEBEND #1

  16. Looking US, Feb 2007 - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY

  17. Looking US – Construction Complete - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY

  18. Looking US @ Bend #1 – 2.5 months later GOODWIN CREEK – 2.5 MONTHS – May 18, 2007 – DAVE BIEDENHARN

  19. 2.4 YEARS AFTER PROJECT COMPLETIONPhotos by Derrick JULY 3, 2009BEND # 1

  20. 2.4 YEARS LATER-Looking US @ Bend #1 – Rooted stock & pole plantings growing exceptionally well! 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

  21. 2.4 YEARS LATER-Looking US @ Bend #1 Rocked Riffle & vegged bank 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

  22. 2.4 YEARS LATER-Looking DS @ upper end of Bend #1. THIS IS WHAT WATER SEES!!!! 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

  23. Soil was soft enough in places Live Stakes could be pushed in - BEND #1 GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ

  24. 2.4 YEARS LATER-Upper bank Sycamore Live Stakes are growing well. Several are 6 to 12 ft tall. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

  25. 2.4 YEARS LATER-Sycamore Live Stakes growing well on upper third of bank (10-12 ft above base flow water surface elevation). Sycamore Live Stakes are 6-10 ft tall with robust growth. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

  26. Looking downstream, what a difference 2 years after the project was completed makes !! July 2009 Early 1997