1 / 17

Turbomachinery Flow Visualization P08453

Allen Luccitti (ME). Turbomachinery Flow Visualization P08453. Mission Statement. Product Description Test stand consisting of a centrifugal pump, closed loop flow system with control through a LABVIEW GUI. Optically clear pump housing Interchangeable parts Key Business Goals

Download Presentation

Turbomachinery Flow Visualization P08453

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Allen Luccitti (ME) Turbomachinery Flow Visualization P08453

  2. Mission Statement • Product Description • Test stand consisting of a centrifugal pump, closed loop flow system with control through a LABVIEW GUI. • Optically clear pump housing • Interchangeable parts • Key Business Goals • Demonstrate fluid flow in Turbomachinery • Demonstrate design principles of Turbomachinery • Teach fundamentals of Fluid Mechanics to engineering students • Basis for research projects for graduate students

  3. Mission Statement • Primary Market • RIT undergraduate and graduate engineering students • RIT engineering faculty • Secondary Market • Dresser Rand Corporation • Assumptions and Constraints • Overall foot print of test stand • Available space • Fabrication of specialty parts • Stakeholders • RIT engineering students • RIT engineering faculty • Dresser Rand Corporation

  4. Staffing Requirements • ME 1 Allen Luccitti • Over see day to day activities of design team • Provide support in necessary areas • Integration of systems • ME 2 • Material selection for pump housing • Design of pump housing and components • Test stand design • ME 3 • Design and develop closed loop fluid flow path and storage • Test stand design

  5. Staffing Requirements • ME 4 • Work with EE on sensor selection and data acquisition concepts • Determine sensor placement in system • Test stand design • EE 1 • Sensor selection • Design power system for sensors, data acquisition, and pump • EE 2 • Develop LABVIEW GUI to run test stand • Develop algorithms for data acquisition • Provide support to EE 1 as needed

  6. Intellectual Property Considerations • Dresser Rand Corporation • Any information provided in support may need to be classified as Private • Pump • Design modifications of pump housing and pump • Public Information • All relevant information not marked as privet shall be made available to stakeholders

  7. Preliminary Work Breakdown Structure Week 1 • ME 1 Allen Luccitti • Introduce project • Lead team in initial benchmarking • Literature search of existing test stands • Assign tasks for following weeks • ME 2 • Participate in benchmarking of pump • Research materials for pump housing

  8. Preliminary Work Breakdown Structure Week 1 • ME 3 • Participate in benchmarking • Research pump flow theory • ME4 • Participate in benchmarking • Research available sensors • EE1 • Participate in benchmarking • Research available sensors and DAQ hardware • EE 2 • Participate in benchmarking • Work on LABVIEW tutorials

  9. Preliminary Work Breakdown Structure Week 2 • ME 1 Allen Luccitti • Lead team in brain storming of alternative solutions • ME 2 • Generate alternative solutions to pump housing • ME3 • Research flow analysis models • ME 4 • Comparison of available sensors • Work with EE 1 on hardware selection • EE 1 • Data acquisition hardware comparison • EE 2 • LABVIEW tutorial training

  10. Preliminary Work Breakdown Structure Week 3 • ME 1 Allen Luccitti • Lead Team in concept development • Pump selection • ME 2 • Material selection for pump housing • Develop concepts for pump modifications • ME 3 • Generate ideas for flow system design • ME 4 • Sensor selection • Generate Ideas for sensor integration • EE 1 • Data acquisition hardware selection • EE 2 • Work on LABVIEW training

  11. Team Values and Norms • Values • Members will be on time to all meetings • Each member is expected to act in a professional manner • Work is expected to be thorough and accurate • Each team member should be dedicated to the success of the project

  12. Grading and Assessment Scheme • Grading will be based on several factors • Peer evaluations • Quality of work • Commitment to the project

  13. Required Resources • Dedicated work area for benchmarking • Machine Shop • Computer labs with solid modeling software • LABVIEW tutorial

  14. Customer Needs • Pump • Transparent pump housing • Can be run on available power supplied in class room • Interchangeable parts • Test Stand • Small footprint • Transportable • Aesthetically pleasing • Easily Maintained • Flow Loop • Variable resistance • Pressure monitoring • Control with LABVIEW

  15. Risks and Issues • Safety • Moving parts • Grounding of stand • Safe materials • Time • CNC of specialty parts • Lead times on other parts • Experience of team members

  16. Outstanding Items • Establishing target specifications • Refine three week work breakdown structure • Resource allocation • Remaining stakeholder interviews

More Related