An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APF: Cycle plan and buildChapters 15 & 16 CSSE 372 28.October.2008

  2. Outline • Cycle plan • Cycle build

  3. Cycle plan overview

  4. Cycle plan • Develop low-level WBS • Micromanaging • Estimate task duration • Estimate resource requirements • Sequence tasks Image from www.motivatedphotos.com/?id=807&src=rt1 .

  5. PDQ, cntd • Version scope activity gives the mid-level WBS: • And the req-gathering activity can be detailed:

  6. PDQ, cntd • And, for the first cycle, 2-weeks long, the detailed WBS would look like this:

  7. Cycle build overview

  8. Micro-level plan Post-it Notes!

  9. Monitoring • Scope bank • Issues log • Prioritized scope matrix • Team meetings • Status reports

  10. PDQ, cntd • How did this plan go? • The requirements-gathering swim lane slipped!

  11. What to do in crisis • Finish the current cycle • Cancel the current cycle and move to the next Cycle Plan Phase • Cancel the project

  12. Questions?