1 / 11

JRA1 – JRA2 Interface

JRA1 – JRA2 Interface. Tobias Haas DESY 4 January 2006. JRA 1 Status. Brainstorming 3/4 Nov. @ DESY Coarse outline of the project First WBS Results documented: http://www-zeus.desy.de/~haas/eudet-jra1/ DAQ workshop 14/15 Dec. @ CERN

collin
Download Presentation

JRA1 – JRA2 Interface

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006

  2. JRA 1 Status • Brainstorming 3/4 Nov. @ DESY • Coarse outline of the project • First WBS • Results documented: • http://www-zeus.desy.de/~haas/eudet-jra1/ • DAQ workshop 14/15 Dec. @ CERN • Detailed WBS with milestones and deliverables up to middle 2007 EUDET JRA2 Brainstorming, 4 January 2005

  3. Organizational Progress • JRA1 Tasks and leaders: • Magnet → Katsumasa Ikematsu (DESY) • Telescope Sensors → Woijciech Dulinski (Strasbourg) • Telescope Integration → Ingrid Gregor (DESY) • DAQ → Daniel Haas (Genève) • Validation → David Cussans (Bristol) • Next Dates: • Meeting: 3 February (1 week before EUDET Kickoff) • MAPS Tutorial: 14 – 17 March, Strasbourg • Review 1: 4 April, CERN • Review 2: January 2007 • Review 3: July 2007 EUDET JRA2 Brainstorming, 4 January 2005

  4. Brainstorming Results 1 • Telescope layout and configuration: • A transverse size of ca 2 cm will be provided at least in one direction. The second direction can be smaller. • The longitudinal layout will be configurable and should provide at least two configurations: a very compact one (ca. 20cm) and a two-arm one with space for a larger DUT in the middle. The mounting will be such that at least one plane can be brought very close to the DUT in the compact configuration • Precision positioning for a pixel DUT will be built • Telescope chip • A CMOS Maps will be used for the telescope. • The telescope chip will have a discriminator and ADC on board • Frame R/O time will be of the order of 1 ms EUDET JRA2 Brainstorming, 4 January 2005

  5. Brainstorming Results 2 • Cooling • The temperature of the DUT must be able to be kept constant. What temperatures are needed is still open • DAQ • Telescope and DUT DAQ will be kept separate. The interface is via trigger, busy and event number. (TLU provided) • The telescope F/E will do digitization and sparsification for the demonstrator. • R/O should be over a standard interface such as USB-2 • Demonstrator (available middle 2007) • The demonstrator should be a fully usable system • It will use the MIMO* 3 chip with the MIMOSA 5 as a fall back solution EUDET JRA2 Brainstorming, 4 January 2005

  6. Compact: for pixels DUT 5mm Magnet Two-arm: TPC etc… In a magnet: DUT Magnet Planned layout 6 Telescope planes usable in different configurations: EUDET JRA2 Brainstorming, 4 January 2005

  7. What should Demonstrator demonstrate? • Show the principle: • Sensors • Demonstrate the precision • Compromise on size and DAQ integration • Mechanics/Integration • Demonstrate overall setup/flexibility • Could be one out of two arms • DAQ • Fully functional • Compromise on the rate (~10Hz) • DUT • Should be fully functional for Pixel devices • Compromise for other users (TPC) EUDET JRA2 Brainstorming, 4 January 2005

  8. Magnet • Superconducting solenoid from KEK: • B ≤ 1.2 T • 85 cm bore • 246 cm long • To be operational @ DESY by end 2006 • Limitations: • Stray field  interlock • He cost  length of operation EUDET JRA2 Brainstorming, 4 January 2005

  9. DESY Test beam area Testbeam 24 EUDET JRA2 Brainstorming, 4 January 2005

  10. Magnet @ DESY • Place magnet in one of the two EAs in beam 24 • Slight preference for B • Area A available for parallel non-B expt. • Cryo and controls outside EA which is interlocked Stray Field EUDET JRA2 Brainstorming, 4 January 2005

  11. Open Questions • What do you expect of us? • How much lateral movement? • Beam or DUT? • Do you need the telescope? • In front, behind or both? • What information from the telescope? • Move magnet to other beams? • Information exchange • Contact person on either side? EUDET JRA2 Brainstorming, 4 January 2005

More Related