110 likes | 492 Views
Krossanes oil terminal. Maximum allowed ship’s length over all 25.000 GRT 200 m. (lenght of ship) 9,5 m draft Available water 80 m3 per hour Available electricity 2 x 250 amph Available key, Length, depth, max draft, strength of key in mt/m2 2 keys, both 80 m., Depth 10 m
E N D
Krossanes oil terminal • Maximum allowed ship’s length over all • 25.000 GRT • 200 m. (lenght of ship) • 9,5 m draft • Available water • 80 m3 per hour • Available electricity • 2 x 250 amph • Available key, Length, depth, max draft, strength of key in mt/m2 • 2 keys, both 80 m., • Depth 10 m • Max draft 9,5 m • 5 mt/m2 • Port of Akureyri is a Ice free port all year. • Available storage are. • 2,5 ha on the pier • 5 ha in the neighbourghood ( 800 m from the pier)
Krossanes oil terminal • Available hotel rooms • 825 rooms with 1950 beds in hotels • Distance from next hospital • 3,5 km. • Population on the are • 25.000 • Technical skills in the area • Verkfræðingar 70 • Iðnaðarmenn • Málmiðnaðarmenn 360 manns • Vélstjórar og vélaverðir 210 manns • Trésmiðir 450 • Rafvirkjar 180 • Total 1200
Dysnes site: approved industrial area on the local Master Planonly 16 km out of Akureyri. Um 60 ha *
Dysnes, future area, 2014-1015? • Master plan and local plan • Will be ready 2013 Maximum allowed ship’s length over all • Length No limit • Draft No limit • Available water • 300 m3 per hour, eaven more. • Available electricity • No limit • Port of Akureyri is a ice free port all year long.
Dysnes, 2013-???? Landfilling,Future are Service area Draft 25+ m Landfilling Area for oil industry Draft 22 m. . Service are Draft 14 m. Service are Landfilling Area for Import and export Draft 12 m