An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FERC Orders and NOPRS2010 Kenneth Wilson WECC Staff Reliability Subcommittee Meeting January 13-14, 2011

  2. Overview FERC Orders BAL-002-WECC-1 (Contingency Reserves) Docket No. RM09-15-000; Order No. 740 FERC NOPRS IRO-006-WECC-1 (Qualified Transfer Path Unscheduled Flow Relief Regional Reliability Standard) Docket No. RM09-19-000 TOP-007-WECC-1 (System Operating Limits) FERC Docket No. RM09-14-000 FAC-501-WECC-1 (Transmission Maintenance) FERC Docket No. RM09-9-000 PRC-004-WECC-1 (Protection System and Remedial Action Scheme Misoperation FERC) Docket No. RM09-9-000 VAR-002-WECC-1 (Automatic Voltage Regulators) FERC Docket No. RM09-9-000 VAR-501-WECC-1 (Power System Stabilizer) FERC Docket No. RM09-9-000

  3. FERC Orders October 21, 2010

  4. BAL-002-WECC-1 • FERC Remanded the Standard • Main Reason: Removal of the 60 Minute Reserve Restoration Period to adopt NERC 90 Minute Reserve Restoration Period

  5. BAL-002-WECC-1 • Justification Why? • Extension of reserve restoration period not justified • Potential increase risk to Western Interconnection Reliability • There have been six instances when a second major contingency occurred during the extended time period during the last 15 years • Significant number of transmission paths in the Western Interconnection are voltage or frequency stability-limited • Reliance on paths that are stability-limited to deliver reserves (Stability-limited paths have no emergency ratings like thermally-limited paths.)

  6. BAL-002-WECC-1 • FERC agreed with the contingency reserve concept of the greater of • The most severe single contingency, or • Sum of 3% of BA load and 3% of BA net generation • Clarity added to the contingency reserve standard by removing the term “load responsibility” and including renewable energy • Allowed Firm Load as Contingency Reserves but only under EOP-002-2.1

  7. BAL-002-WECC-1 • FERC Directed • Submit modification to allow demand-side management that is technically capable of providing service as a resource for contingency reserves • Use Operating Reserve – Spinning and Operating Reserve – Supplemental rather than Spinning Reserve and non-spinning reserve • NERC is ordered to solve confusion between definitions for Spinning Reserve and Operating Reserve Spinning and Non-Spinning Reserves and Operating Reserves-Supplemental

  8. Where are we Headed with BAL-002-WECC-1? • Formed Project WECC-0083 to incorporate FERC directives in the Order • WECC Board directed submission of a revised BAL-002-WECC standard by June Board meeting

  9. FERC NOPRS

  10. FERC Issued NOPRs Approving • IRO-006-WECC-1 (Qualified Transfer Path Unscheduled Flow Relief Regional Reliability Standard) Docket No. RM09-19-000 issued October 21, 2010 • TOP-007-WECC-1 (System Operating Limits) FERC Docket No. RM09-14-000 issued December 16, 2010 • FAC-501-WECC-1 (Transmission Maintenance) FERC Docket No. RM09-9-000 issued December 17, 2010 • PRC-004-WECC-1 (Protection System and Remedial Action Scheme Misoperation) FERC Docket No. RM09-9-000 • VAR-002-WECC-1 (Automatic Voltage Regulators) FERC Docket No. RM09-9-000 • VAR-501-WECC-1 (Power System Stabilizer) FERC Docket No. RM09-9-000

  11. IRO-006-WECC-1– Qualified Transfer Path Unscheduled Flow Relief • Commission seeks comments if it should direct WECC to: • Require steps 1 through 3 of the Unscheduled Flow Mitigation Plan (UFMP) in IRO-006-WECC-1 or TOP-007-WECC-1 (i.e. use of phase-angle regulators, series capacitors, and back-to-back DC lines to mitigate unscheduled flow) • Include references to the UFMP in the standard • Provide more information on the webSAS tool to prevent conflicts with NERC’s IRO-006-4 • Questions possible automatic approval of curtailments without reliability coordinator (RC) review • Revise UFMP to incorporate all the WECC rules and procedures or incorporate UFMP into IRO-006-WECC-1 • Questions role of Reliability Coordinator – Can RC issue a curtailment Request?

  12. TOP-007-WECC-1– System Operating Limits • Commission is requesting industry comment to address the following concerns: • Whether the standard would allow transmission operators to operate the system a single contingency away from cascading for up to 30 minutes • The change in time allowed to respond to a stability limited system operating limit from 20 to 30 minutes • The substitution of system operating limit for operating transfer capability. (Is confusion caused with Path Rating Catalog using OTC and standard using SOL?) • Replacement of the WECC Transfer Path Table with an internet link, which may permit changes to the table without Commission approval. • Change Violation Risk Factors to align with NERC Procedures • Should the SOL requirement apply to only elements on the paths or to all elements outside the path.

  13. FAC-501-WECC-1 – Transmission Maintenance • Commission is requesting industry comment to address the following concerns: • The WECC Transfer Path Table could be changed without review and approval of the ERO and the Commission • The substitution of system operating limit for operating transfer capability. • Is using OTC more appropriate than using SOL? • Will using SOL require more Transmission Owners to have transmission maintenance and inspection plans? • Would the owner of a major path be responsible for maintaining and inspecting transmission facilities owned by others? • Replacement of the WECC Transfer Path Table with an internet link, which may permit changes to the table without Commission approval.

  14. PRC-004-WECC-1 Protection System and Remedial Action Scheme Misoperation • Commission is requesting industry comment to address the following concerns: • The WECC Transfer Path and RAS Tables could be changed without review and approval of the ERO and the Commission • Questions whether the proposed terms Functionally Equivalent Protection System and Functionally Equivalent RAS are more inclusive than corresponding terms in NERC Glossary • Questions whether the proposed terms Security-Based Misoperations and Dependability-Based Misoperations are necessary

  15. VAR-002-WECC-1 – Automatic Voltage Regulators • Commission is requesting industry comment to address the following concerns: • Replace the blanket 2% exemption with a list of specific exemptions • More narrowly tailor the exemption for synchronous generators and condensers that operate less than 5% of the hours in a quarter • Questions the need to extend the AVR replacement period from 15 to 24 months for all generators if extension is only needed for nuclear units • Impact of removing the requirement that all generators with automatic voltage control equipment be operated in automatic voltage control mode set to respond to voltage deviations

  16. VAR-501-WECC-1 – Power System Stabilizer • Commission is requesting industry comment to address the following concerns: • Replace the blanket 2% exemption with a list of specific exemptions • More narrowly tailor the exemption for synchronous generators and condensers that operate less than 5% of the hours in a quarter • Questions the need to extend the PSS replacement period from 15 to 24 months for all generators if extension is only needed for nuclear units • Direct ERO to develop a continent-wide reliability standard that if a PSS is installed, the PSS must be properly tuned

  17. Questions?