1 / 16

AIT Status: Algorithm Development to Algorithm Implementation Support Presented by Walter Wolf

AIT Status: Algorithm Development to Algorithm Implementation Support Presented by Walter Wolf AWG Integration Team Lead NOAA/NESDIS/STAR. AIT East Members. Walter Wolf – Government Lead Shanna Sampson – Project Lead Xingpin Liu – QA Lead & Monitoring Tools

conan
Download Presentation

AIT Status: Algorithm Development to Algorithm Implementation Support Presented by Walter Wolf

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AIT Status: Algorithm Development to Algorithm Implementation SupportPresented byWalter Wolf AWG Integration Team Lead NOAA/NESDIS/STAR

  2. AIT East Members • Walter Wolf – Government Lead • Shanna Sampson – Project Lead • Xingpin Liu – QA Lead & Monitoring Tools • Wayne MacKenzie – GSP/Harris/AWG Liason • Larisa Koval – Documentation • Yunhui Zhao – CM • Aiwu Li – Algorithm Integration • Tianxu Yu – Algorithm Integration • Rickey Rollins – Algorithm Integration • Veena Jose – Algorithm Integration • Zhaohui Zhang – Algorithm Integration • Meizhu Fan – Data testing & AIADD Document • Kristina Sprietzer – Framework Support • Hua Xie – Sounding Integration • Wendy Zhang – Imagery Integration • Haibing Sun – Physical Collocations

  3. AIT Midwest Members • Ray Garcia – AIT Midwest Lead • William Straka – Algorithm Integration • Graeme Martin – Algorithm Integration • Eva Schiffer – Glance Development • Bob Holz – Physical Collocation Lead • Fred Nagle – Navigation Expert • Greg Quinn – Physical Collocation Support

  4. Outline • Milestones • Accomplishments over the Past Year • Option 2 Product Status • Baseline Algorithm Status • Summary

  5. Milestones for Baseline Products – Scheduled Deliveries Complete • Deliveries and Milestones • Draft ATBD – September 2008 • 80% ATBD and Algorithm Package – September 2009 • 100% ATBD and Algorithm Package – September 2010 • REMOVED – Maintenance Delivery of ATBD and Algorithm Package – September 2012

  6. Milestones for Option 2 Products • Deliveries and Milestones • Draft ATBD – September 2008 • 80% ATBD and Algorithm Package – September 2010 • 100% ATBD and Algorithm Package – September 2011 • Visibility, Rainfall Potential, and Probability of Rainfall • 100% ATBD and Algorithm Package – September 2012

  7. Preparing for 2010 Delivery Conducted 13 Baseline Algorithm Readiness Review Conducted 10 Option 2 Test Readiness Reviews Reviewed 44 ATBDs Wrote the AIADD

  8. Accomplishments • Delivered ATBDs, Fire Algorithm Test data and Ice Concentration/Cover Test Data on October 1, 2010 • 24 Baseline ATBDs • 20 Option 2 ATBDs • Delivered test data set for 100% baseline algorithms and 80% Option 2 algorithms on December 1, 2010 • Cleanup up all the checksum issues by Dec 22

  9. Option 2 Products:Current Status Completed the 10 week data runs for the Option 2 algorithms – products have been available Received version 4 Option 2 deliveries Completed Option 2 algorithm Code Unit Test Reviews

  10. Option 2 Products:Next Steps Version 5 deliveries Integration into the framework and test the outputs Conduct ARRs and Visibility TRR September 30 Delivery

  11. Technical Interchange Meetings (TIM) with Harris and GSP • Harris/AER is currently implementing the AWG algorithms from the ATBDs • Harris/AER develop an algorithm design document from which the software is developed • Harris/AER ask questions of the AWG for algorithm clarification • AWG answers the questions • Fast turnaround is generally required • AWG has already answered over 1000 questions • This is an iterative process

  12. Baseline TestData Set Redelivery Through the process of answering the Harris/AER questions, occasional bugs are found in the software When bugs are fixed, the test data are regenerated and redelivered So far, Cloud, AAA, Soundings, and Imagery baseline algorithm base test data set have been redelivered

  13. Baseline Algorithm Validation The baseline algorithm product teams are continuing to validate their algorithms Routine Cal/Val Tools are being developed ATBDs for the routine Cal/Val Tools will be delivered in September 2012

  14. Summary • Option 2 product ARRs will be completed by September 1, 2011 • 100% Option 2 ATBDs & Algorithm Packages will be delivered on September 30, 2010 • 80% ATBD and Algorithm Package for Visibility will be delivered on September 30, 2011 • 100% Option 2 ATBDs & Algorithm Packages for Rainfall Potential, Probability of Rainfall, and Visibility will be delivered on September 30, 2012 • 100% Routine Cal/Val Tool ATBDs for the Baseline Algorithms will be delivered on September 20, 2012

  15. AIT & Product Team Meetings – Tuesday • 1:10 – 1:45 pm Hydrology Team • 1:45 – 2:30 pm Radiation Budget Team • Break • 3:00 – 3:30 pm AAA Team • 3:30 – 4:00 pm Cloud Team • 4:00 – 5:00 pm Land Team

  16. AIT & Product Team Meetings – Wednesday • 8:30 – 9:15 am Sounding Team • 9:15 – 9:45 am Imagery Team • 9:45 – 10:15 am Lightning • 10:45 – 11:30 am Ocean Dynamic Team • 11:30 – 11:59 am SST Team • Lunch • 2:10 – 2:40 pm Winds Team • 2:45 – 3:40 pm Cryosphere Team • 4:10 – 5:00 pm Aviation Team • 5:00 – 5:15 pm Physical Collocation Team • 5:15 – 5:45 pm Proxy Team

More Related