An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal for a Beam Interlock System for Linac4, Transfer and Measurement Lines as well asPSB with Linac4 B. Mikulec, B. Puccio, J-L. Sanchez

  2. Outline • Constraints influencing interlock design • Proposed hybrid interlock principle • Hardware interlock system: BIS • BIS for Linac4 • BIS for PSB • Software interlock system: SIS • External conditions • Linac4 EC • PSB EC • Synchronisation of BIS action • Summary and open points Linac4 BCC - Interlocks

  3. Beam Interlock System – Design Constraints (1) • Main constraints: • Multiple ‘interlock zones’ due to several destinations, distinction in ‘operational modes’ not practicable • Destinations for Linac4: L4DUMP, LBE, LBS, PSB • PSB destinations: BDUMP, ISOGPS, ISOHRS, PS •  Should consider PSB and Linac4 interlock systems in parallel! (PSB is a Linac4 destination; analysis of injection permit is required) • PSB is (timing) master of Linac4 • Maximise proton delivery to the experiments via ‘External Conditions’; the user (+beam destination) is calculated for the current cycle depending on some necessary conditions; this analysis yields the decision if the ‘normal’ or ‘spare’ cycle should be executed (or currently ‘tailclipper’ if both not possible); maintain this flexibility Linac4 BCC - Interlocks

  4. Interlock Zones • Linac4 interlock zones • PSB interlock zones Linac4 BCC - Interlocks

  5. Beam Interlock System – Design Constraints (2) • Source should continue pulsing with constant timings to provide stable beam current (requested also for Linac4 RF feed-forward loop) • Beam stopper movement too slow for cycle-to-cycle changes and bending magnet rise- and fall-times toolongfor fast reaction to pulsed equipment failures • Linac2 dump currently only used for (pre-programmed) ZERO cycles • To be maintained with Linac4 - ZERO cycles should have Linac4 dump destination (to be discussed if feasible that pre-chopper maintains its voltage and chopper does not pulse to increase chopper lifetime) Linac4 BCC - Interlocks

  6. Beam Interlock System – Design Principle • Three main ingredients (hybrid system): • Hardware interlock system (BIS): reliable, fast • For fast reaction times (to avoid sending the beam pulse shortly before its creation or to dump part of the pulse if conditions change) • If considered useful to avoid machine activation • Software interlock system (SIS): flexible • For slow-changing parameters • If some more complex logic needs to be adopted • External conditions (EC): for proton optimisation • Consider user requests and zone/beam inhibits • Method also useful for ring-specific interlocks and beam intercepting devices requiring shorter Linac4 pulses Remark: A clear distinction between 1-3 is not always possible; open for discussion... Linac4 BCC - Interlocks

  7. Hardware Interlock System (BIS) • Based on Beam Interlock Controller (BIC) modules already used in LHC and SPS and user interface boards (CIBU): see presentation B. Puccio • We propose to use a tree architecture for the Linac4 BIS • Slave BICs: AND operation of the max. 15 inputs (14+1) • Input 0: SIS, inputs 1-7 non maskable, inputs 8-14 maskable • Master BICs: AND and OR operations possible • Inputs: either outputs from Slave BICs or additional USER_PERMIT inputs Linac4 BCC - Interlocks

  8. Linac4/PSB BIS Layout • 3 Master BICs: ‘Source RF’, ‘Choppers’, ‘PSB Ejection’ • Names describe action of the Master BIC Optional BIC Remark: No separate BIC, output from Slave BIC ‘PSB OK (2)’ Linac4 BCC - Interlocks

  9. Reminder: Source Timing • Approximate timing diagram • Interlock action possible on source RF and pre-chopper timings Linac4 BCC - Interlocks

  10. Linac4 BIS (1) • Master BIC ‘Source RF’ (no slave BIC connected) • Action: switch off the source RF voltage (~10 μs reaction time) • Redundant action: pulse pre-chopper (use timing signals NX.STOP(START)-PCHOP); ~2 μs rise-time to assure correct chopper action (for Master BIC ‘Choppers’ – see next slides) Linac4 BCC - Interlocks

  11. Linac4 BIS (3) • Master BIC ‘Choppers’ • Action: pulse pre-chopper (use timing signals NX.STOP(START)-PCHOP); ~2 μs rise-time • Redundant action: pulse chopper; a few ns rise-time • Disable start timing of PSB RF • Evaluate destinations optional input for PS injection permit Linac4 BCC - Interlocks

  12. Linac4 BIS (4) • Slave BIC ‘Linac4 and Linac4 Transfer Lines OK’ • Input for Master BIC ‘Choppers’ • L4 Magnet Current Status: AQN of main bendings surveyed with FGCs depending on destination (OR of digital output signals if AQN outside window ~1 ms before beam pulse) • Precision to be defined! (need for example 0.5% precision for LT.BHZ20 to avoid >10% losses in the distributor) • EC only if all rings affected (e.g. user requests; see later) only up to L4T.MBH.0210 Remark: inputs marked in grey have evaluation of destination in their front-end application! Linac4 BCC - Interlocks

  13. Linac4 BIS (PSB Injection Permit) (1) • Slave BIC ‘PSB OK (1)’ • Input for Slave BIC ‘PSB OK (2)’ • Check pulsing equipment ~1 ms – 250 μs before beam production; checks during injection can also be envisaged (distributor, septum?) Linac4 BCC - Interlocks

  14. Linac4 BIS (PSB Injection Permit) (2) • Slave BIC ‘PSB OK (2)’ • Input for Master BIC ‘Choppers’ • Channels 1 and 2 could be combined; BLMs always active • For the extraction elements simply provision of error status Linac4 BCC - Interlocks

  15. For Completeness: PSB BIS • Master BIC ‘PSB Ejection’ • Action: disable PSB extraction kickers • Remark: rise-time of magnets too slow to take different action Linac4 BCC - Interlocks

  16. Linac4 SIS • Reaction time of SIS usually >1 cycle • SIS can evaluate different conditions, e.g. destination • Action depending on Master BIC affiliation • List not exhaustive! • WIC (Warm magnet Interlock Controllers; PLC-based) information to be transmitted to SIS Linac4 BCC - Interlocks

  17. PSB Injection SIS • Output connected to Slave BIC ‘PSB OK’ • Action defined by Master BIC ‘Choppers’ (pre-chopper, chopper and PSB RF) • List not exhaustive! • WIC information to be transmitted to SIS Linac4 BCC - Interlocks

  18. Linac4 EC • Linac4 EC not to be confused with PSB EC for proton optimisation; here the aim is to reduce the Linac4 pulse length • Proposed action: advance NX.START-PCHOP to remove last 3/4th of the pulse and pulse at the same time the chopper • BI provides EC signal when equipment is MOVING and IN • Add equipment that cannot stand full pulse (wire scanners etc.?) Linac4 BCC - Interlocks

  19. PSB EC • Action of ring-specific EC: pulse chopper to remove beam fraction for corresponding ring(s) and switch off PSB RF for that ring • Action for destination-specific EC: try to execute ‘spare’ user; if not possible, EC signal is sent to input of slave BIC ‘Linac4 and Linac4 transfer OK’ leading to a combined pre-chopper/chopper/PSB RF inhibit Linac4 BCC - Interlocks

  20. Synchronisation Needs of BIS for Linac4 • For H- source action (switch off source RF): • Received beam permit only to be considered within window starting ~1 ms before beam pulse until its end • For pre-chopper action: • If beam permit FALSE before NX.STOP-PCHOP continue pulsing • If beam permit changes to FALSE after this timing: issue timing NX.START-PCHOP • For chopper action: • Act corresponding to beam permit, but only during the 400 μs window of the beam passage Linac4 BCC - Interlocks

  21. Synchronisation Needs of BIS for PSB • For PSB RF: • Check beam permit just before injection into the PSB (~200 μs before) and don’t issue the timing for the start of the PSB RF (for all or only individual rings) • For PSB extraction kickers: • Check beam permit at a defined moment just before charging of the extraction kickers (~10 ms before extraction) Linac4 BCC - Interlocks

  22. Conclusions • Hybrid beam interlock concept based on BIS, SIS and EC. • Timings, synchronisation and tolerances need to be defined in detail • EDMS document L4-CIB-ES-0001 (1016233 v.0.2) will be submitted including remarks after today’s meeting Important remark: The beam interlock system does not include personnel safety systems! Linac4 BCC - Interlocks