Magellan technical updates, PasadenaApril 2006 – September 2006
Instrument Development • Meetings with instrument teams catch interface problems • Telescope • Guiders • Computing • Logistics • Observatory learns about design, construction, and maintenance requirements
Instrument Development • PISCO (Parallel Imager for Southern Cosmology Obsv’ns) • Chris Stubbs, Tony Stark, Will High • In design • PFS (Planet Finding Spectrograph) • Paul Butler, Steve Shectman, Jeff Crane • Halfway thorough construction
Instrument Development • MagE (Magellan Echellette) • Scott Burles, Ian Thompson, Steve Shectman • Early construction • FIRE (Folded port Infrared Echellette) • Rob Simcoe, Adam Burgasser • PDR soon
Instrument Development • FourStar (4K IR imager) • Eric Persson, David Murphy, JHU/IDG • CDR soon • Mosaic2 (second CCD dewar for IMACS) • Alan Dressler, Ian Thompson, Pat McCarthy, Alan Uomoto • CCDs ordered; construction starting soon
Instrument Development • WFC (Wide Field Corrector for f/5) • Andy Szentgyorgyi • Construction almost finished
Instrument deployments • MMTF (Maryland-Magellan Tunable Filter) • Sylvain Veilleux, Ben Weiner, Alan Dressler, OCIW engineering • Successful installation and testing • Further engineering this semester • http://www.astro.umd.edu/~bjw/mmtf/
Instrument deployments • POETS (Portable Occultation Eclipse and Transit System) • Jim Elliot, Alycia Weinberger, Mercedes López-Morales, David Osip • Successful speckle tests LLL mode (Weinberger) • Successful photometric transit observations (López-Morales )
F/5 secondary mirror • Mirror is being integrated onto the polishing cell at SOML • Approximate finish date is mid-2007 • Expect 2007B engineering on Clay (baffles, testing)
Guider upgrades • Charlie Hull, Jose Soto • New lead screws for finer position control • Modifications to improve reliability • New motion actuator designs • Better cable routing and strain relief • Testing this year
Bibliography • 186 refereed publications total