Inventory Management, Just-in-Time, and Backflush Costing

Inventory Management, Just-in-Time, and Backflush Costing. Chapter 20. Learning Objective 1. Identify five categories of costs associated with goods for sale. Costs Associated with Goods for Sale. 1. Purchasing costs include transportation costs. 2. Ordering costs include receiving and

corazon
Download Presentation

Inventory Management, Just-in-Time, and Backflush Costing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Inventory Management,Just-in-Time, andBackflush Costing Chapter 20

  2. Learning Objective 1 Identify five categories of costs associated with goods for sale.

  3. Costs Associated withGoods for Sale 1. Purchasing costsinclude transportation costs. 2. Ordering costs include receiving and inspecting the items in the orders. 3. Carrying costs include the opportunity cost of the investment tied up in inventory and the costs associated with storage.

  4. Costs Associated withGoods for Sale 4. Stockout costs occur when an organization runs out of a particular item for which there is a customer demand. 5. Quality costsof a product or service is its lack of conformance with a prespecified standard.

  5. Learning Objective 2 Balance ordering costs with carrying costs using the economic-order-quantity (EOQ) decision model.

  6. Economic-Order-QuantityDecision Model Assumptions 1. The same quantity is ordered at each reorder point. 2. Demand, ordering costs, carrying costs, and purchase-order lead time are known with certainty. 3. Purchasing costs per unit are unaffected by the quantity ordered i.e. no discounts

  7. Economic-Order-QuantityDecision Model Assumptions 4. No stockouts occur. 5. Quality costs are considered only to the extent that these costs affect ordering costs or carrying costs.

  8. Economic-Order-QuantityDecision Model Assumptions The EOQ minimizes the relevant ordering costs and carrying costs. Video store sells packages of blank video tapes. Video purchases packages of video tapes from Oaks, Inc., at $15/package.

  9. Economic-Order-QuantityDecision Model Assumptions Annual demand is 12,844 packages, at the rate of 247 packages per week. Video requires a 15% annual return on investment. The purchase-order lead time is two weeks. What is the economic-order-quantity?

  10. Economic-Order-QuantityDecision Model Assumptions Relevant ordering cost per purchase order: $209 Relevant carrying costs per package per year: Required annual ROI (15% × $15) $2.25 Relevant other costs 3.25 Total $5.50

  11. Economic-Order-Quantity Decision Model Example EOQ = D = Demand in units for a specified time period P = Relevant ordering costs per purchase order C = Relevant carrying costs of one unit in stock for the time period used for D

  12. Economic-Order-Quantity Decision Model Example EOQ = = 988 packages

  13. Economic-Order-Quantity Decision Model Example What are the relevant total costs (RTC)? RTC = Annual relevant ordering costs + Annual relevant carrying costs RTC = D Q × P + Q 2 × C DP Q + QC 2 or Q can be any order quantity, not just the EOQ.

  14. Economic-Order-Quantity Decision Model Example When Q = 988 units, RTC = (12,844 × $209 ÷ 988) + (988 × $5.50 ÷ 2) = $5,434 total relevant costs How many deliveries should occur each time period? D EOQ = 12,844 988 = 13 deliveries

  15. Economic-Order-Quantity Decision Model Example 10,000 8,000 Annual relevant total costs Relevant Total Costs (Dollars) 6,000 5,434 Annual relevant ordering costs 4,000 Annual relevant carrying costs 2,000 600 988 EOQ 1,200 1,800 2,400 Order Quantity (Units) 20 - 15

  16. Reorder Point Reorder point = Number of units sold per unit of time × Purchase-order lead time EOQ = 988 packages Number of units sold/week = 247 Purchase-order lead time = 2 weeks Reorder point = 247 × 2 = 494 packages

  17. Reorder Point 988 Reorder Point Reorder Point 494 Weeks 1 2 3 4 5 6 7 8 Lead Time 2 weeks Lead Time 2 weeks This exhibit assumes that demand and purchase-order lead time are certain: Demand = 247 tape packages/week Purchase-order lead time = 2 weeks 20 - 17

  18. Safety Stock Example Safety stock is inventory held at all times regardless of the quantity of inventory ordered using the EOQ model. Video’s expected demand is 247 packages per week. Management feels that a maximum demand of 350 packages per week may occur.

  19. Safety Stock Example How much safety stock should be carried? 350 Maximum demand – 247 Expected demand = 103 Excess demand per week 103 packages × 2 weeks lead time = 206 packages of safety stock.

  20. Considerations in ObtainingEstimates of Relevant Costs What are the relevant incremental costs of carrying inventory? – only those costs of the purchasing company that change with the quantity of inventory held

  21. Cost of Prediction Error Predicting relevant costs requires care and is difficult. Assume that Video’s relevant ordering cost is $97.84 instead of the $209 prediction used. What is the cost of this prediction error?

  22. Cost of Prediction Error Step 1: Compute the monetary outcome from the best action that could have been taken, given the actual amount of the cost input. EOQ = EOQ = = 676 packages

  23. Cost of Prediction Error The annual relevant total costs when EOQ is 676 packages is: RTC = DP Q + QC 2 RTC = (12,844 × $97.84 ÷ 676) + (676 × $5.50 ÷ 2) = $3,718 total relevant costs

  24. Cost of Prediction Error Step 2: Compute the monetary outcome from the best action based on the incorrect amount of the predicted cost input. EOQ = = 988 packages

  25. Cost of Prediction Error What are the annual relevant costs using this order quantity when D = 12,844 units, P = $97.84, and C = $5.50? RTC = (12,844 × $97.84 ÷ 988) + (988 × $5.50 ÷ 2) = $ 3,989 total relevant costs

  26. Cost of Prediction Error Step 3: Compute the differencebetween the monetary outcomes from Steps 1 & 2. Step 1 $3,718 Step 2 3,989 Difference $ (271) The cost of prediction error is $271.

  27. Learning Objective 3 Identify and reduce conflicts that can arise between EOQ decision model and models used for performance evaluation.

  28. Evaluating Managers andGoal-Congruence Issues The opportunity cost of investment tied up in inventory is a key input in the EOQ decision model. Some companies now include opportunity costs as well as actual costs when evaluating managers.

  29. Just-In-Time Purchasing Just-in-time (JIT) purchasing is the purchase of goods or materials such that a delivery immediately precedes demand or use. Companies moving toward JIT purchasing argue that the cost of carrying inventories (parameter C in the EOQ model) has been dramatically underestimated in the past.

  30. JIT Purchasing and EOQModel Parameters The cost of placing a purchase order (parameter P in the EOQ model) is also being re-evaluated. Three factors are causing sizable reduction in the cost of placing a purchase order (P). 1. Companies increasingly are establishing long-run purchasing arrangements.

  31. JIT Purchasing and EOQModel Parameters 2. Companies are using electronic links, such as the Internet, to place purchase orders. 3. Companies are increasing the use of purchase order cards (similar to consumer credit cards like Visa and Master Card).

  32. Learning Objective 4 Use a supply-chain approach to inventory management.

  33. Supply-Chain Analysis Supply-chain analysis describes the flow of goods, services, and information from cradle to grave, regardless of whether those activities occur in the same organization or other organizations.

  34. Learning Objective 5 Differentiate materials requirements planning (MRP) systems from just-in-time (JIT) systems for manufacturing.

  35. Materials RequirementPlanning (MRP) Materials requirements planning (MRP) systems take a “push-through” approach that manufactures finished goods for inventory on the basis of demand forecasts. MRP predetermines the necessary outputs at each stage of production.

  36. Materials RequirementPlanning (MRP) Management accountants play key roles in an MRP system, including... – maintaining accurate and timely information pertaining to materials, work in process, and finished goods, and... – providing estimates of the setup costs for each production run, the downtime costs, and carrying costs of inventory.

  37. Learning Objective 6 Identify the features of a just-in-time production system.

  38. Just-In-Time Production Systems Just-in-time (JIT) production systems take a “demand pull” approach in which goods are only manufactured to satisfy customer orders.

  39. Major Features of a JIT System 1. Organizing production in manufacturing cells 2. Hiring and retaining multi-skilled workers 3. Emphasizing total quality management 4. Reducing manufacturing lead time and setup time 5. Building strong supplier relationships

  40. Major Features of a JIT System What information may management accountants use? Personal observation by production line workers and managers Financial performance measures, such as inventory turnover ratios Nonfinancial performance measures of time, inventory, and quality.

  41. Learning Objective 7 Use backflush costing.

  42. Backflush Costing Backflush costing describes a costing system that delays recording some or all of the journal entries relating to the cycle from purchase of direct materials to the sale of finished goods.

  43. Backflush Costing Where journal entries for one or more stages in the cycle are omitted, the journal entries for a subsequent stage use normal or standard costs to work backward to flush out the costs in the cycle for which journal entries were not made.

  44. Learning Objective 8 Describe different ways backflush costing can simplify traditional job-costing systems.

  45. Trigger Points The term trigger point refers to a stage in a cycle going from purchase of direct materials to sale of finished goods at which journal entries are made in the accounting system.

  46. Trigger Points Stage A: Purchase of direct materials Stage B: Production resulting in work in process Stage C: Completion of good units of product Stage D: Sale of finished goods

  47. Trigger Points Assume trigger points A, C, and D. This company would have two inventory accounts: Type 1. Combined materials and materials in work in process inventory 2. Finished goods Account Title 1. Inventory: Raw and In-process Control 2. Finished Goods Control

  48. Trigger Points What is the journal entry when trigger point A occurs? Inventory: Raw and In-process Control XX Accounts Payable Control XX To record direct material purchased during the period

  49. Trigger Points What is the journal entry to record conversion costs? Conversion Costs Control XX Various accounts XX To record the incurrence of conversion costs during the accounting period Underallocated or overallocated conversion costs are written off to cost of goods sold.

  50. Trigger Points What is the journal entry when trigger point C occurs? Finished Goods Control XX Inventory: Raw and In-Process Control XX Conversion Costs Allocated XX To record the cost of goods completed during the accounting period