1 / 44

KYUNG IN CONSTRUCTION (L.L.C)

KYUNG IN CONSTRUCTION (L.L.C). May. 2006. INDEX. A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Factory B. Construction 1. Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea

corbin
Download Presentation

KYUNG IN CONSTRUCTION (L.L.C)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KYUNG IN CONSTRUCTION (L.L.C) May. 2006

  2. INDEX A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Factory B. Construction 1. Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea C. Production of Piling Machine 1. Drilling Rigs 2. DTH Hammers 3. Auger & Casing Drivers 4. Accessories : Screws & Hammers

  3. A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Accomplishment in Middle East 6. Factory

  4. 1. Greeting From Manufacturing To Construction Since establishing KYUNGIN PRECISION in 1989, we’ve supplied various equipments needed at a construction site, manufactured with accumulated techniques through continuous researches and developments at a 4,300m2-sized factory located in Ulsan. We promise to do always our best for customer’s satisfaction with abundant experiences and professionalism sincerely. We need your encouragements and supports hereafter and also hope your continuous prosperity.

  5. 2. Introduction

  6. 3. Organization Managing Director Construction Division Manufacturing Division Piling Team Sales Factory Administration

  7. 4. Current Available Equipment in Middle East

  8. 5. Accomplishment in Middle East (Dubai)

  9. 5. Accomplishment in Middle East (Bahrain)

  10. 6. Factory

  11. B. Construction Site 1. Full Casing Method 1-1. Merits of Full Casing Method 1-2. Procedure of Full Casing Method 1-3. Our Strength in Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea

  12. 1-1. Merits of Full Casing Method (1) ☞ in comparison with Bentonite Method • Excellent Quality of Pillars: Ensuring Vertically Straightness Even Surface

  13. 1-1. Merits of Full Casing Method (2) ② Quick Performance: High Productivity & Cost Saving

  14. 1-1. Merits of Full Casing Method (3) ③ Environmentally Friendly: Keeping Job-Site Clean owing to No Waste Low level of Noise Pollution

  15. 1-2. Procedure of Full Casing Method (1) ①Preparation ② Drilling ③Completion of Drilling

  16. 1-2. Procedure of Full Casing Method (2) ④ Re-bar Cage Installment ⑤ Concrete Placement ⑥ Casing Removal

  17. 1-3. Our Strength in Full Casing Method • We achieved a great success in Full Casing Method in Middle East for the first time. 2. Due to our Success in Full Casing Method in Jebel Ali Plant, Dubai City hall has picked up Full Casing Method as a Recommendable Boring Method for the piling construction in Dubai. 3. International Patent applied for ‘Boring Method for Sand Layer and Auger Machine’ for the first time in the World. * Tile of Invention : “AUGER BORING MACHINE HAVING VIBRATOR AND BORING METHOD USING THE SAME” * Applied Number : PCT/KR2006/001391

  18. 2. Procedure of Pile Cutting (1) ① Excavation for Pile Cutting ② Pile Cutter Setting ③ Placing Pile into Pile Cutter

  19. 2. Procedure of Pile Cutting (2) ④ Cutting Pile and Moving Debris ⑤ Clean Pile Head

  20. 3. Procedure of Load Test (1) ① Excavation for Load Test ② Pile head Cutting and Leveling ③ Setting of Cylinder Hydraulic Jack

  21. 3. Procedure of Load Test (2) ④ Lying of Test Beam ⑤ Loading Concrete Blocks ⑥Gage Setting

  22. 4-1. Job Site in Dubai : Jebel Ali Power Plant (1) • Jebel Ali Power Station & Desalination ‘L’-Phase Ⅱ

  23. 4-2. Job Site in Dubai : Jebel Ali Power Plant (2) • Jebel Ali Power Station & Desalination ‘L’-Phase Ⅱ

  24. 4-2. Job Site in Bahrain • Bahrain MEENA TOWER PROJECT

  25. 4-2. Job-Site in Korea : DTH Hammer Rock Piling • KTX (Korea Train Express) Construction Site ① ② ③ ④ ⑤ ☞ Our DTH Hammer Machine is used for all railroad tracks in Korea Such as KTX tracks, Kyungbu line Honam line and so on.

  26. 4-2. Job-Site in Korea : Rock-Bed Piling

  27. 4-2. Job-Site in Korea : Ø1000 Piling

  28. 4-2. Job-Site in Korea : Soil Piling

  29. C. Production of Piling Machine 1. Drilling Rigs 2. DTH Hammer 3. Auger & Casing Drivers 4. Accessories : Screws & Hammers

  30. 1-1. Drilling Rig : KID800 • K-150DP Note; 1. ① & ② Hole : drilled with One Full Casing at one time. 2. ③ Hole : another casing of 15M is jointed by welding with the first casing. 3. KID800 is compatible for Ø600 & Ø800 hole by using Casing Coupling. 4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E. ② ③ ① Depth +15M Ø800*27M Ø600*29.5M • KCA-890 Ø600+27M 27M 29.5M 42M

  31. 1-2. Drilling Rig: KID1200 • K-240DP Note; 1. ① & ② Hole : drilled with One Full Casing at one time. 2. ③ Hole : another casing of 15M is jointed by welding with the first casing. 3. KID1200 is compatible for Ø800 & Ø1200 hole by change Casing Coupling. 4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E. ② ③ ① Depth +15M Ø1200*27M Ø800*29.5M • KCA-1200 Ø800+27M 27M 29.5M 42M

  32. * Structure of Drilling Rig Ø Ø Ø * Note : The specification is subject to be changed for improvement without prior notice.

  33. 1-5. Pictures of Pile Drivers (1) KID800 KID1200

  34. 1-5. Pictures of Pile Drivers (2) KID1200-L36 JSP Machine

  35. 2. DTH Hammer (1) • from Ø400 to Ø1200

  36. 2. DTH Hammer (2) • from Ø400 to Ø1200

  37. 3. Auger & Casing Drivers Multi Shaft Augers Earth Augers Hydraulic Auger Casing Drivers Doughnut Auger

  38. 3-1. Auger Driver K-Series (1)

  39. 3-1. Auger Driver K-Series (2)

  40. 3-2. Casing Driver KCA-Series (1)

  41. 3-2. Casing Driver Series (2)

  42. 4-1. Screw & Bits

  43. 4-2. Hammers Set & Bits

  44. Contact Us • Website : www.kyungin21.com • E-mail : piling@kyung21.com • Tel: • Mobile : +971-50-8033848 • Fax : • Address :

More Related