450 likes | 697 Views
KYUNG IN CONSTRUCTION (L.L.C). May. 2006. INDEX. A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Factory B. Construction 1. Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea
E N D
KYUNG IN CONSTRUCTION (L.L.C) May. 2006
INDEX A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Factory B. Construction 1. Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea C. Production of Piling Machine 1. Drilling Rigs 2. DTH Hammers 3. Auger & Casing Drivers 4. Accessories : Screws & Hammers
A. About Us 1. Greeting 2. Introduction 3. Organization 4. Current Available Equipment in Dubai 5. Accomplishment in Middle East 6. Factory
1. Greeting From Manufacturing To Construction Since establishing KYUNGIN PRECISION in 1989, we’ve supplied various equipments needed at a construction site, manufactured with accumulated techniques through continuous researches and developments at a 4,300m2-sized factory located in Ulsan. We promise to do always our best for customer’s satisfaction with abundant experiences and professionalism sincerely. We need your encouragements and supports hereafter and also hope your continuous prosperity.
3. Organization Managing Director Construction Division Manufacturing Division Piling Team Sales Factory Administration
B. Construction Site 1. Full Casing Method 1-1. Merits of Full Casing Method 1-2. Procedure of Full Casing Method 1-3. Our Strength in Full Casing Method 2. Pile Cutting 3. Load Test 4. Job Site in Dubai & Korea
1-1. Merits of Full Casing Method (1) ☞ in comparison with Bentonite Method • Excellent Quality of Pillars: Ensuring Vertically Straightness Even Surface
1-1. Merits of Full Casing Method (2) ② Quick Performance: High Productivity & Cost Saving
1-1. Merits of Full Casing Method (3) ③ Environmentally Friendly: Keeping Job-Site Clean owing to No Waste Low level of Noise Pollution
1-2. Procedure of Full Casing Method (1) ①Preparation ② Drilling ③Completion of Drilling
1-2. Procedure of Full Casing Method (2) ④ Re-bar Cage Installment ⑤ Concrete Placement ⑥ Casing Removal
1-3. Our Strength in Full Casing Method • We achieved a great success in Full Casing Method in Middle East for the first time. 2. Due to our Success in Full Casing Method in Jebel Ali Plant, Dubai City hall has picked up Full Casing Method as a Recommendable Boring Method for the piling construction in Dubai. 3. International Patent applied for ‘Boring Method for Sand Layer and Auger Machine’ for the first time in the World. * Tile of Invention : “AUGER BORING MACHINE HAVING VIBRATOR AND BORING METHOD USING THE SAME” * Applied Number : PCT/KR2006/001391
2. Procedure of Pile Cutting (1) ① Excavation for Pile Cutting ② Pile Cutter Setting ③ Placing Pile into Pile Cutter
2. Procedure of Pile Cutting (2) ④ Cutting Pile and Moving Debris ⑤ Clean Pile Head
3. Procedure of Load Test (1) ① Excavation for Load Test ② Pile head Cutting and Leveling ③ Setting of Cylinder Hydraulic Jack
3. Procedure of Load Test (2) ④ Lying of Test Beam ⑤ Loading Concrete Blocks ⑥Gage Setting
4-1. Job Site in Dubai : Jebel Ali Power Plant (1) • Jebel Ali Power Station & Desalination ‘L’-Phase Ⅱ
4-2. Job Site in Dubai : Jebel Ali Power Plant (2) • Jebel Ali Power Station & Desalination ‘L’-Phase Ⅱ
4-2. Job Site in Bahrain • Bahrain MEENA TOWER PROJECT
4-2. Job-Site in Korea : DTH Hammer Rock Piling • KTX (Korea Train Express) Construction Site ① ② ③ ④ ⑤ ☞ Our DTH Hammer Machine is used for all railroad tracks in Korea Such as KTX tracks, Kyungbu line Honam line and so on.
C. Production of Piling Machine 1. Drilling Rigs 2. DTH Hammer 3. Auger & Casing Drivers 4. Accessories : Screws & Hammers
1-1. Drilling Rig : KID800 • K-150DP Note; 1. ① & ② Hole : drilled with One Full Casing at one time. 2. ③ Hole : another casing of 15M is jointed by welding with the first casing. 3. KID800 is compatible for Ø600 & Ø800 hole by using Casing Coupling. 4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E. ② ③ ① Depth +15M Ø800*27M Ø600*29.5M • KCA-890 Ø600+27M 27M 29.5M 42M
1-2. Drilling Rig: KID1200 • K-240DP Note; 1. ① & ② Hole : drilled with One Full Casing at one time. 2. ③ Hole : another casing of 15M is jointed by welding with the first casing. 3. KID1200 is compatible for Ø800 & Ø1200 hole by change Casing Coupling. 4. Drilling Depth is estimated according to the soil condition of Jebel Ali Power Station in U.A.E. ② ③ ① Depth +15M Ø1200*27M Ø800*29.5M • KCA-1200 Ø800+27M 27M 29.5M 42M
* Structure of Drilling Rig Ø Ø Ø * Note : The specification is subject to be changed for improvement without prior notice.
1-5. Pictures of Pile Drivers (1) KID800 KID1200
1-5. Pictures of Pile Drivers (2) KID1200-L36 JSP Machine
2. DTH Hammer (1) • from Ø400 to Ø1200
2. DTH Hammer (2) • from Ø400 to Ø1200
3. Auger & Casing Drivers Multi Shaft Augers Earth Augers Hydraulic Auger Casing Drivers Doughnut Auger
Contact Us • Website : www.kyungin21.com • E-mail : piling@kyung21.com • Tel: • Mobile : +971-50-8033848 • Fax : • Address :