ANASAGAR. Water Purification System The Lake water purification system by Aeration & floating fountains (4 Nos) were installed and is functioning since 23.01.2009. 10 more floating fountains have been installed in 2013 for beautification and aeration of Anasagar Lake.
E N D
Water Purification System The Lake water purification system by Aeration & floating fountains (4 Nos) were installed and is functioning since 23.01.2009. 10 more floating fountains have been installed in 2013 for beautification and aeration of Anasagar Lake.
Bio-Remediation • Bio-remediation of drains terminating into Anasagar lake has been taken up since Feb-2013 for treatment of waste water flowing through drains before entering in to the lake. At present work is under Progress In 7 drains are as under : • Nagphani(near Mahaveer colony) • Ramnagar(near R.K marble) • Ramnagar • Kazi ka nallah • Shantipura • Apsara Mension • Choursiawas Drain
Bio-Remediation RAM NAGAR II (NEAR R.K. MARBLE) CHAURASIAWAS DRAIN SHANTIPURA DRAIN KAZI KA NALLAH
Jetty Platform & Walkway The work of Jetty Platform near Chaupati and walkway along the hillock below the circuit house with lighting has been completed.
Fixing of Steel Grill-Jali to check entry of Floating impurities into the Lake is being done . Grill at Shantipura Drain Jali at Anasagar Lake
Fixing of Steel Grill-Jali Grill at Ram Nagar II Drain Grill at Chauarsiawas Drain
Different IEC has been taken up to create public awareness & participation which includes showcase of Jhanki of Anasagar lake on republic day function. Distribution of pamphlets and cards for awareness of lake conservation
WORKS PERFORMED UNDER NLCP- ANASAGAR LAKE • The sanctioned desilting work of the lake in 2,15,000 cum has been completed, The work of Desilting in 20000 cum on Anted Nallah, Chaurasiyawas Nallah, Kazi ka Nallah & Bandi Nadi has been completed. • Pucca works for construction work of a pilot channel with cement concrete bed in about 308 m length in Anted Nallah has been completed behind the Press club on the Gaurav Path.
The fencing and Afforestation in 206 Ha & construction of check dam 31 nos have been completed by the forest Dept. • Water Quality Monitoring by testing of sample monthly is being done regularly in lake and drains.