90 likes | 107 Views
Ground water is an essential and vital component of our life support system. The ground water resources are being utilized for drinking, irrigation and industrial purposes.<br>https://bit.ly/2WRZLZv
E N D
Procedure for Central Ground Water Authority (CGWA) NOC for Ground Water Withdrawal for Mining Projects Introduction Ground water is an essential and vital component of our life support system. The ground water resources are being utilized for drinking, irrigation and industrial purposes. There is growing concern on deterioration of ground water quality due to geogenic and anthropogenic activities. The quality of ground water has undergone a change to an extent that the use of such water could be hazardous. Increase in overall salinity of the ground water and/or presence of high concentrations of fluoride, nitrate, iron, arsenic, total hardness and few toxic metal ions have been noticed in large areas in several states of Hi there
India. Ground water contains wide varieties of dissolved inorganic chemical constituents in various concentrations as a result of chemical and biochemical interactions between water and the geological materials through which it flows and to a lesser extent because of contribution from the atmosphere and surface water bodies. Procedure to CGWA Registration Our Expert team will draft & file the application with the CGWA Department & will follows-up with CGWA Department. For more information contact our customer care on 8448 444 985 or info@corpseed.com. APPLY NOW Aquifers Ground water is the water that seeps through rocks and soil and is stored below the ground. The rocks in which ground water is stored are called aquifers. Aquifers are typically made up of gravel, sand, sandstone or limestone. Water moves through these rocks because they have large connected spaces that make them permeable. The area where water fills the aquifer is called the saturated zone. The depth from the surface at which ground water is found is called the water table. The water table can be as shallow as a foot below the ground or it can be a few hundred meters deep. Heavy rains can cause the water table to rise and conversely, continuous extraction of ground water can cause the level to fall. Central Ground Water Authority (CGWA) made guidelines for monitoring of ground water, In order to provide broad guidelines to state governments to frame their own laws relating to sustainable water usage. All users drawing/ proposing to draw ground water need No Objection Certificate (NOC) from Central Ground Water Authority (CGWA). http://cgwb.gov.in/ NOC for Ground Water Withdrawal for Mining Projects
All mining projects need clearance from Central Ground Water Authority. Clearance for abstraction of ground water may be granted subject to the following conditions. Application for No- Objection Certificate to Central Ground Water Authority (CGWA). The water available from de-watering operations is to be put to gainful use such as water supply, irrigation, dust suppression, mining process etc. The applicant is required to establish a ground water monitoring network and installation of digital water level recorders with quality probe and telemetry in an area within 5 km radius of the industrial cluster. The server will be maintained by the Supplier of the instrument and access will be provided to CGWA. The applicants shall undertake rain water harvesting/ artificial recharge to ground water. In cases where the mining project is located in Coastal Regulation Zone (CRZ) area, the relevant provisions of CRZ Act shall be applicable, in addition to the conditions stipulated by CGWA. NOC shall be valid for a period of 2 years from the date of issuance. The applicant shall apply for renewal of NOC at least 90 days prior to expiry of its validity. For more details, Please visit https://www.corpseed.com/ Other Conditions:- Sale and supply of raw/unprocessed/untreated ground water by unauthorized agencies for commercial use is not permitted application for NOC shall be entertained without referral letters from the statutory authority The referral letter shall contain verification on the quantum of water for the industry/project with detailed break up of ground water consumption, recycle & reuse of the waste water, so that the wastage of the precious resource can be avoided. In case this is not given by the referral authority, applicant should obtain a letter from the Industries Department/ Project Sanctioning Authority/ local municipal authority in urban areas on the same lines.
The Costal Regulation Zone Area(CRZA) rules and regulation shall be applicable wherever in vogue No permission would be required for withdrawal of ground water from any area if withdrawal is done through non-energized means. Mandatory clause on rain water harvesting may be relaxed in case of water logged/shallow water level (< 5 m bgl during post monsoon or as per state policy) areas. Abstraction structure should be located inside the premises of project property. The piezometer is to be installed/constructed at the minimum of 50 m distance from the pumping well through which ground water is being withdrawn. The diameter of the piezometer should be about 4” to 6’ The depth of the piezometer should be same as in case of the pumping well from which ground water is being abstracted. If, more than one piezometer are installed the second piezometer should monitor the shallow ground water regime. It will facilitate shallow as well as deeper ground water aquifer monitoring. The measuring frequency should be monthly and accuracy of measurement should be up to cm. The reported measurement should be given in meter upto two decimal. For measurement of water level, sounder or Automatic Water Level Recorder (AWLR) with telemetry system should be used for accuracy. The measurement of water level in piezometer should be taken, only after the pumping from the surrounding tubewells has been stopped for about four to six hours. All the details regarding coordinates, reduced level (with respect to mean level), depth, zone tapped and assembly lowered should be provided for bringing the piezometer into the National Hydrograph Monitoring System of Central Ground Water Board, and for its validation. The ground water quality has to be monitored twice in a year during pre-monsoon (May/June) and post-monsoon (October/November) periods. Quality may be got analyzed from NABL accredited lab. Besides, one sample (1 lt capacity bottle) of ground water collected during pre-monsoon after proper
packing may be sent to the concerned Regional Director, Central Ground Water Board, for chemical analysis. A permanent display board should be installed at Piezometer/ Tubewell site providing the location, piezometer/ tubewell number, depth and zone tapped of piezometer/tubewell for standard referencing and identification The following conditions laid down in the Hon’ble Supreme Court’s Order dated August 6, 2010 The owner of the land/ premises, before taking any steps for constructing bore well/ tube well must inform in writing to the concerned authorities in the area, i.e., District Collector/ District Magistrate/ Sarpanch of the Gram Panchayat/ any other Statutory Authority/ concerned officers of the Department of Ground Water/ Public Health/ Municipal Corporation, as the case may be , about the construction of bore well/ tube well. Registration of all the drilling agencies, namely, Government/ Semi Government, Private etc. should be mandatory with the district administration/ Statutory Authority wherever applicable. Erection of signboard at the time of construction near the well includes Complete address of the drilling agency at the time of construction/ rehabilitation of well and Complete address of the user agency/ owner of the well. Erection of barbed wire fencing or any other suitable barrier around the well during construction. Construction of cement/ concrete platform measuring 0.50x0.50x0.60 meter (0.30 meter above ground level and 0.30 meter below ground level) around the well casing. Capping of well assembly by welding steel plate or by providing a strong cap to be fixed to the casing pipe with bolts & nuts On completion of the drilling operations at a particular location, the ground conditions are to be restored as before the start of drilling. For more details, click http://cgwb.gov.in/aboutcgwa.html Documents required for NOC
Details of Applicant (Adhaar Card/Pan Card/Board Authorization) Referral letter from statutory bodies viz. Ministry of Environment, Forests & Climate Change (MoEF&CC) or State Pollution Control Board (SPCB) or State Level Expert Appraisal Committee (SEAC) or State Level Environment impact Assessment Authority (SLEIAA) Geotagged mine lease map Document showing ownership/ lease of land. Mining plan approved by referral Govt. agency/ Department. Comprehensive report on ground water conditions in both core and buffer zone of the area including impact assessment of mining and dewatering. For any query related to Water Boring/Tube Well NOC click on https://www.corpseed.com/service/central-ground-water-board-noc-for-water-boring Have Legal Questions? Get help from an experienced legal adviser. Schedule your consultation at a time that works for you and it’s absolutely FREE. Name Email Mobile Number. Request Callback Connect With Us Latest Services
Business Monthly Business Yearly Conversion of Private limited company to Section 8 BUREAU OF INDIAN STANDARDS (BIS) REGISTRATION Producer Company Registration Business Plan Siddha Manufacturing license Certification Patent & Trademark Ayush Ayurveda Recent Blogs Zomato Partner Registration | Zomato Registration | How to Register Restaurant in Zomato | Documents Required | Commission Fee Zomato Partner Registration | Zomato Registration | How to Register Restaurant in Zomato | Documents Required | Commission Fee Zomato Partner Registration | Zomato Registration | How to Register Restaurant in Zomato | Documents Required | Commission Fee Zomato Partner Registration | Zomato Registration | How to Register Restaurant in Zomato | Documents Required | Commission Fee Zomato Partner Registration | Zomato Registration | How to Register Restaurant in Zomato | Documents Required | Commission Fee Center Government Reduces ESI Contribution Rate to 4% - June 2019 Update | Corpseed HOW TO GET HEALTH TRADE LICENSE? How to obtain Eating House License? Online Vendor Registration Process for Swiggy FSSAI allows small organic growers to sell produce without certification till 2020 - Corpseed Legal Guide Download legal guide on how to successfully start and manage business in India & achieve 100% compliance. Enter Email Id... Enter Mobile Number Download
Related Services Proprietorship Firm 3000 APPLY NOW READ MORE Proprietorship is the easiest business entity under which an individual can run a business. Sole proprietorship is referred to an individual who owns the business and is generally responsible for its debts. Get helpful tips and info from our newsletter! Type Your Email Here... Submit Go to Knowledge Centre info@corpseed.com +91-8448 444 985 F-39, Sector 6, Noida, Uttar Pradesh. ABOUT COMPANY Knowledge Centre Become A Partner Contact Us About Us Join our team
COMPANY POLICIES Privacy policy Terms and conditions Refund policy Law Updates SiteMap POPULAR SERVICES GST Registration Proprietorship Firm Trademark Registration FSSAI Basic Registration Private Limited Company Use of Corpseed services is subject to our Terms of Service and Privacy Policy.