1 / 3

K12 TECHNICAL RUN

Lau Gatignon, EATM 11 December 2012. K12 TECHNICAL RUN. K12 OPERATION. Last profiles at end of run (highest intensities). After final tuning. E.g. profile at Big Fiscs :. 30±0.1 mm 20±0.1 mm. 30 mm (X) 20 mm (Y). CEDAR, L ~ 6 m.

cosmo
Download Presentation

K12 TECHNICAL RUN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lau Gatignon, EATM 11 December 2012 K12 TECHNICAL RUN

  2. K12 OPERATION Last profiles at end of run (highest intensities)

  3. After final tuning E.g. profile at Big Fiscs: 30±0.1 mm 20±0.1 mm 30 mm (X) 20 mm (Y) CEDAR, L ~ 6 m K12 status and LS1 plans

More Related