Team Klickitat

Team Klickitat. Team Members Maldeep Kang Chris Scott Rose Harber Michael Burton Faculty Advisor Dr. Peter Osterberg Industry Representative Zubin Bagai , BPA & IEEE Client Sam and Emmi Leach. Persistence of Vision Globe. Agenda. Introduction to the Team Project Overview

coty
Download Presentation

Team Klickitat

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team Klickitat Team Members Maldeep Kang Chris Scott Rose Harber Michael Burton Faculty Advisor Dr. Peter Osterberg Industry Representative ZubinBagai, BPA & IEEE Client Sam and Emmi Leach Persistence of Vision Globe

  2. Agenda Introduction to the Team Project Overview Motor (Direct vs. Indirect Drive) Milestones Final MOSIS Chip layout Accomplishments Issues/Concerns Conclusion

  3. Team Klickitat • Michael Burton • Microcontroller Lead • Parts Supply Logistics • Maldeep Kang • MOSIS Design • Web Development Lead • Chris Scott • Motor, Base & Spinning Platter • Spring Team Lead • Rose Harber • Fall Team Lead • LED Ring and Debug

  4. Project Background • Persistence of Vision Globe • Stroboscopic Effect • Sense  Process  Display • Inspired by LED Cube • Wanted to create aesthetically pleasing apparatus

  5. Design Overview Form Factor Direct Drive System Indirect Drive System

  6. Design Overview Block Diagram

  7. Design Overview Circuitry Platter

  8. Fall Semester Milestones

  9. MOSIS Chip Layout

  10. MOSIS Chip B2 Logic Layout

  11. Issues/Concerns Motor functionality Apparatus Troubleshooting Microcontroller Programming Material choice for LED ring Construction of new base design and apparatus

  12. Accomplishments All parts ordered or sourced Motor ordered MOSIS chip design finished MOSIS chip sent in for fabrication Design Document Finished and approved Final Budget Finished and approved

  13. Conclusion • Experimentation will lead to correct functionality. • Project is on Schedule • Next: • Check functionality of ordered motor (Holiday Break Goal) • Construct LED ring prototypes and begin apparatus construction • Finish the GUI Interface (Holiday Break Goal) • Begin macro model construction

  14. Hall Sensor Demonstration Form Factor Direct Drive System Indirect Drive System

  15. Questions • Rose Harber (Fall Semester Team Lead / LED Ring) • harber14@up.edu • Chris Scott (Motor / Spring Semester Team Lead) • scott14@up.edu • Maldeep Kang (Website Developer/ MOSIS) • kang14@up.edu • Michael Burton (MOSIS Support / Microcontroller) • burton15@up.edu