BL13 — XALOC Guifré Cuní Jordi Juanhuix on behalf of the XALOC team Kappa Group Meeting - September 2009
Kappa Group Meeting - September 2009 BL13 Current Status BL13-XALOC – Status Lead hutches: installed Undulator: Sep 2010 Monochromator and mirrors: installed Remaining optics End 2009 OH Personal safety system: installed Electrical power, fluids and cable trays: installed End station elements: Beginning 2010 Beamline commissioning: End 2010 EH
Kappa Group Meeting - September 2009 BL13-XALOC – Status End Station Detector Status: Deadline CFT 15 Sep in-house commercial mixed Diffractometer Status: DDR approved Delivery: Jan 2010 Beam conditioning el’s Status: Designing Detector table Status: Manufacturing Delivery: Jan 2010 Diffractometer table Status: Manufacturing Delivery: Jan 2010 Sample changer Status: DDR Delivery: Jan 2010
Kappa Group Meeting - September 2009 BL13-XALOC – Control arquitecture STAC ? mxCuBE Framework 4 ISPyB Laboratory Information Management System ESRF/spine eHTPX mxCuBE GUI Experiment Management EDNA On Line data Analysis ESRF Edna project ALBA ESRF Control objects ALBA implementation Control objects ESRF implementation Pool and Macroserver Spec Device Servers Device Servers
Kappa Group Meeting - September 2009 BL13-XALOC – Status of BL Control • Optics: Standard TAU widgetsMacros (monitoring, alignment, etc) • EndStation: • Special Device Servers • Automatic Sample Changer (CATS-Irelec-FIP) • Diffractometer MD2M (Maatel-Bruker-EMBL) ?? • Spec Macros • Monitoring, alignment, data collection, etc • Implement Macros in our MacroServer • mxCuBE (Bliss Framework 4) • Adapt and extend to our experiment requirements in collaboration with the ESRF