1 / 10

NCGS: Positioning NC today and for the future!

NCGS: Positioning NC today and for the future!. North Carolina Geodetic Survey Maintenance of a CORS/RTN infrastructure. CORS installation components. Planning NGS guidelines Hardware Monumentation Software Communication Installation Documentation Submittal to NGS.

craigervin
Download Presentation

NCGS: Positioning NC today and for the future!

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NCGS: Positioning NC today and for the future! North Carolina Geodetic Survey Maintenance of a CORS/RTN infrastructure

  2. CORS installation components • Planning • NGS guidelines • Hardware • Monumentation • Software • Communication • Installation • Documentation • Submittal to NGS Guidelines for New and Existing Continuously Operating Reference Stations (CORS) www.ngs.noaa.gov/PUBS_LIB/CORS_guidelines.pdf National Geodetic Survey National Ocean Survey, NOAA Silver Spring, MD 20910 January 2013

  3. CORS receiver maintenance • GNSS receiver • Uninterruptible Power Supply (UPS) • Battery maintenance (keep maintenance log) • Receiver location • Protect cable connections • Select a location that is away from the main traffic area of the room • Near power source • Secure cables • Document firmware updates • Inform NGS if site is a National CORS • Surge protection • Properly grounded • Display contact information

  4. CORS antenna maintenance • GNSS antenna • Keep antenna surface clean • Confirm orientation of antenna • Monitor condition of radome (if installed) • Lighting protection • Grounded properly • Cable connections protected from rain/snow • Antenna cable • Connections (sealed properly) • Check for sun damage • Routing

  5. CORS hardware maintenance • Hardware maintenance • Monumentation/mounting • Damage from elements • Indications of tampering with mounting device

  6. Site maintenance • Any new obstructions • Buildings • Towers • Fences • Any new signal transmitters • Stability • Any construction activity near CORS • Update photos (submit to NGS if the site is a National CORS)

  7. Monumentation maintenance • Ground monumentation • Check for: • Damage • Parking or traffic patterns • Indication of new construction near site

  8. Monumentation (building mount) • Building mount • Any damage to fasteners • Any damage from rain/snow • Evidence of tampering • Tools required for maintenance • Lift truck • Ladder

  9. CORS administration • IT security • Latency • Bandwidth • Transmission medium • Router and switch performance • Firewall • Wireless network voice/data traffic • Servers • Age • Capacity • Maintenance up to date

  10. Questions? Gary W. Thompson, PLS • Office: 919-733-3836 • Direct: 919-948-7844 • Email: gary.thompson@ncdps.gov

More Related