Overview • Lifetime Model • LM Tests • New Schedule • Open Points • Conclusion Chopper
Lifetime Model • LM manufacture started Nov 2000 at MPIA, drawings from Zeiss • Assembly planned for Mar/Apr 2001 at Zeiss • Design frozen Chopper
Chopper Overview pigtail with I/F connector drive unit with 3 coils • Fully manufactured at MPIA mechanical workshop (A. Böhm and co-workers) I/F point mirror housing temperature sensor position sensor unit flexible pivot Chopper
Rotor drive magnets • Al 6061 • 12g, 3.23x10-7kgm2 sensor magnet integrated lightweight mirror balancing masses Chopper
Flexural Pivots • CuBe, double-stage • 12° • 5Nmm/rad Chopper
New Schedule Chopper
Work to do • Consider FPU structural analysis (KT) with respect to vibration loads for the chopper • Implementation of “PACSblack color” for the chopper • First test on LM spare cover • Qualification for QM, FM, FS (MPE) • Formal agreement with MPE for proposed QM/FM test procedures (#axes, temperature level) Chopper
internal external Conclusion • Features of promising MPIA prototype nearly fully adopted in Chopper design of Zeiss Specs to be achieved • Optimized choice of materials, dimensions, linkage to be verified in LM and QM tests industrial QA guarantees outcome of a space qualified system • Interface to warm electronics nearly specified minor effort to fix cable routing and launch lock details • Start of cold lifetime tests in June 2001 • QM to be delivered in October 2001 Chopper
LM Tests MPIA Chopper