2009 WSDOT/ACEC Structures Team Status Report

2009 WSDOT/ACEC Structures Team Status Report. Geoff Swett - WSDOT Jim Schettler – Jacobs Engineering June 1, 2011. Geoff Swett – SE Co-Chair - Bridge Design Office Eric Schultz – PE Bridge Design Office Jesse Beaver – PE HQ - Bridge Construction Scott Sargent – PE Bridge Design Office

crevan
Download Presentation

2009 WSDOT/ACEC Structures Team Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2009 WSDOT/ACEC Structures Team Status Report Geoff Swett - WSDOT Jim Schettler – Jacobs Engineering June 1, 2011

  2. Geoff Swett – SE Co-Chair - Bridge Design Office Eric Schultz – PEBridge Design Office Jesse Beaver – PEHQ - Bridge Construction Scott Sargent – PEBridge Design Office Jeri Bernstein - PE Washington State Ferries No WSDOT members rotated off the team Jim Schettler - SECo-Chair - Jacobs Engineering Paul Guenther - SECH2M Hill Bill Elkey- SEParsons Richard Patterson- SEAECOM Chester Werts- SEHDR Jake Menard- SEDEA 4 Consultant members rotated off the team ACEC Structures Team – 2010-2011 • Jerry Lenzi Team Sponsor – Engineering Programs Director • Dave PetersTeam Sponsor – HDR

  3. Who are we? • Team Purpose: • Address issues within bridge and structural engineering related to project delivery • Strengthen coordination and collaboration • Propose revisions and peer review of WSDOT design & construction standards • Propose revisions to bridge and structures aspects of D/B Delivery

  4. Who are we? (continued) • Team Vision: • Promote cost-effective, constructible, quality projects • Share best practices, lessons learned and new engineering • Establish design guidelines for all delivery methods • Enhance understanding of WSDOT and consultant business • Promote innovation

  5. 2010-2011 Highlights • Accelerated Bridge Construction (ABC): • Professor John Stanton, U of W & Grad Students • Peer Review of WSDOT Documentation: • Proposed BDM Chapter on Segmental Bridge Constr • Proposed BDM Chapter on ABC • WSF Terminal Structural Design Criteria • Load Distribution on 100” girders • Seismic Design • Write a policy statement on balanced stiffness for D/B

  6. 2010-2011 Highlights • Share Lessons Learned: • SW Line Bridge Nalley Valley: Seg Box Girder Presentation – Eric Schults • Transfer Spans at WSF Presnetation – Jeri Bernstein • Development of Spread Footing Abutments on MSE Walls Policy • Development of D/B Issues Matrix

  7. Quarterly Meetings w/ WSDOT Continues Focus on our Purpose and Vision Design / Build Issues Seismic Design Share Lessons Learned Provide Peer Reviews ACEC FUTURE

  8. ACEC ACEC Structures Sub-committee Website http://www.wsdot.wa.gov/bridge/acec/