NKU Stream Restoration Program Scott Fennell , PE Director / Principal Engineer Northern Kentucky University Center f

NKU Stream Restoration Program Scott Fennell , PE Director / Principal Engineer Northern Kentucky University Center for Environmental Restoration. Agricultural Land and Stream Restoration Livestock Management and Stream Exclusion. Before. After. Wright Farm, Kenton County.

crevan
Download Presentation

NKU Stream Restoration Program Scott Fennell , PE Director / Principal Engineer Northern Kentucky University Center f

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NKUStream Restoration ProgramScott Fennell, PEDirector / Principal Engineer Northern Kentucky UniversityCenter for Environmental Restoration

  2. Agricultural Land and Stream Restoration Livestock Management and Stream Exclusion Before After Wright Farm, Kenton County

  3. Agricultural Land and Stream Restoration Breached Dam & Sediment Removal with Stream Restoration Before After During Wright Farm, Kenton County

  4. Bank StabilizationBank Sloping, Rock Toe, and Re-vegetation After Before After Bentwood Hills Condos

  5. Bank StabilizationRock Deflectors, Bank Sloping, and Re-vegetation Before After During Bentwood Hills – Three Mile Creek

  6. Bank StabilizationStone Wall Bank Protection & Salamander Condos After During Adair WMA

  7. Channel StabilizationStone Grade Control Structures at Headcut Locations After Before During Adair WMA

  8. Stream RehabilitationChannel Restoration through Abandoned Development Site Fill Before After After During Split Rock Conservation Park

  9. Stream Re-establishmentMeander and Riffle / Pool Restoration After Before During Adair WMA

  10. Stream Re-establishmentChannel Restoration through Demolition Debris Landfill After Before During During Joe’s Creek

  11. Stream Re-establishment Lake Removal and Meandering Channel Restoration After Before After During Florence Golf Course

  12. Stream Re-establishment Sinuosity and Floodplain Restoration on Channelized Stream After Before After During Boone Woods Park

  13. Wetlands EstablishmentStormwater Wetlands Bentwood Boone Woods Burlington Elementary