1 / 11

Spiral 2 Process Flow List

Spiral 2 Process Flow List. 1.0 = Material Master 1.1a = MMR-NSN/LSN (Query) Request for Material Master creation & Record Establishment 1.1b = MMR – NSN Query and Record Establishment (NSY primary) 1.2 = MMR- Tailored Change Notice 2.0 = Forecast/Gross Demand

cricket
Download Presentation

Spiral 2 Process Flow List

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spiral 2 Process Flow List 1.0 = Material Master 1.1a = MMR-NSN/LSN (Query) Request for Material Master creation & Record Establishment 1.1b = MMR – NSN Query and Record Establishment (NSY primary) 1.2 = MMR- Tailored Change Notice 2.0 = Forecast/Gross Demand 2.1 = FRC Gross Demand Plan (GDP) Signal 2.2 = DLA GDP Filtering 3.0 = Demand Signal 3.1 = FRC Net Demand Signal 3.2 = Demand Signal Initiation (NSY) 3.3 = Demand Signal – NSY – Call-In Process Overnights – Non-DLA Managed 3.4 = Off Station / Tiger Team Support 4.0 = Level Setting 4.1 = Level Setting 5.0 = Protection 5.1 = Protection 5.2 = FRC Breaching (Auto) 5.3 = Breaching (Manual) 6.0 = Fulfillment 6.1 = Fulfillment Demand Signal / Issue Order 6.2 = EMALL Ordering with MILSTRIP 6.3 = DLA Government Purchase Card 6.4 = Local Purchase Auto Solicitation & Manual Solicitation 6.5 = Local Manufacturing 7.0 = Receiving 7.1 = Navy Funded Receiving 7.2 = DWCF Funded Receiving 7.3 = Staging (NSY) 7.4 = Material Returns 7.5 = Picklist and Staging Update for DSS 8.0 = Quality 8.1 = Inspection 8.2 = DLA and Navy Owned PQDR 8.3 = SDR at Receiving 8.4 = SDR Discovery after Issue 9.0 = Issue Order 9.1 = DLA Owned On Hand Issue Order at DSS IA Worksite 9.2 = DLA Managed On Hand Issue Network Site (DSS) 9.3 = NSY Nuclear (DTO) 9.4 = Post-Post / Walk Ups & Walk -Thru DSS IA Worksite 10.0 = Requisition Maintenance 10.1 = Material Obligation Validation 10.2 = Change of JON/KO or WO 10.3 = Requisition Maintenance 10.4 = Status Process 11.0 = End-to-End Processes 11.1 = Less Than Unit of Issue 11.2 = Government/Customer Furnished Material Process 11.3 = Rip out & Custody Storage 11.4 = Navy Funded DLR End to End Process 12.0 = Special Processes 12.1 = DLA Owned Reconciliation Process 12.2 = Navy Owned Reconciliation Process 12.3 = Inventory On Hand Update 12.4 = HAZMAT – Receiving Process for DSS IA Worksite 12.5 = HAZMAT – Order Process for DSS IA Worksite

  2. 1.1a: MMR-NSN/LSN (Query) Request for Material Master creation & Record Establishment – Master IN OUT PS I/O F EBS Request for MM creation 1a1 1a MRP II EBS NSN/LSN Create/Query Screen Response 1a2 Accept 2a 1a3 DAASC DLIS (FLIS) Automated FLIS Query 1c 4a • 832N • 832N IF 1a 3a 2b 832N IF 1b 3b • 832N DSS 3c 4c 3c1 4b MAT Accept • DLA System 2a EBS NSN/LSN Create/Query Screen 1b3 Response 1b2 • Navy System Request for MM creation 1b MRQT 1b1 20090730_MMR_NSN/LSN Query_Record Establishment_Master

  3. 1.1b: MMR – NSN Query and Record Establishment (NSY primary) – Master v2 DAASC SYMMR TABLE EBS JML Established in SYMMR? MRQT 1 9 Pull IN NSY Q 832N 832N 832N FLIS 832N OUT 7a 8 PS I/O F 832N 832N 832N MAT 10 5 6 7b 4 3 No 832N JML Suspense File 2 8a DSS Yes Demand Signal Issue Order 3 20090730_NSY_MMR_Record_Establishment_MASTER_v2

  4. 3.2: Demand Signal Initiation (NSY) – Pre-Master v2 IN OUT PS I/O F Cost (Reservation) 5b2 Non-DLA SOS Status Process (for EBS) D A A S C 5b1 SL4701 511R EBS 3 NSY Queue 7c2 947I (DAD) 5b Non DLA Managed PULL 7c1 9 511R 511R 5 4 2 846A JML Demand MAT RRAM Query 6 5a 5a1 1 PMRD 527D (DUS/DWK) Status Process 6a 7a 7 RRAM Query MRQT Status Process (Demand Signal) 846A 947I (DAD) 8 RRAM Fulfillment Demand Signal/ Issue Order process 7b 6a1 DSS IA Worksite 7c 5c 5a2 Status Process 5a3 • DLA System • Navy System 4 20090721_NSY_Demand_Signal_Initiation_Pre-Master_v1

  5. 3.2: Demand Signal Initiation (NSY) – Master IN OUT PS I/O F Cost (Reservation) 5a2 Non-DLA SOS includes RRAM Status Process (for EBS) D A A S C 5a1 SL4701 511R EBS 3 NSY Queue 7c2 947I (DAD) 5a Non DLA Managed PULL 7c1 8 511R 511R 5 4 2 846A JML Demand MAT 6 1 PMRD 527D (DUS/DWK) 6a 7a 7 MRQT Status Process (Demand Signal) 846A 947I (DAD) Fulfillment Demand Signal/ Issue Order process 7b 6a1 DSS IA Worksite 7c 5b Status Process 5a3 • DLA System • Navy System 5 20090922_NSY_Demand_Signal_Initiation_Master

  6. 9.1: DLA Owned On Hand Issue Order at DSS IA Worksite MASTER Picklst & Staging EBS • MAT/COST • Update DAASC • 511R (A0_A3_) 2 1a1 • 511R (A0_/A3_) • 511R (A0_) Out 1a Process 511R (A0_) 2 3 527R (DRA) 9 527R (DRA) In • 940R (A5_) 8b1 • Pull 945A (AR_) • Copy Create 940R (A5_) 4 5 • 945A (AR_) 7 MAT 8b Status Process 1b1 Inventory On Hand Update MRPII • 511R (A0_) 2 IF 5 1b 945A (AR_) Processing 7 7a • 511R ($Ob) to DIFMS • 945A (AR_) 9 • Customer Bill 527R (DRA) • 527R (DRA) Picklist & Staging 527R (DRA) Processing 7 9a 9 • 945A (AR_) - Copy 8a 5 7 • Process Virtual Issue IF 13 Status Process 10 • 940R (A5_) IF 14 • Process Virtual Receipt 8a1 NSY UDF Pick list • 945A (AR_) DLA System Artisan • Material Delivery by JO/KO or Picklist DSS IA Worksite 6 6d Navy System 6c • FRC Fin Trans to DIFMS Process Completed Pick Ticket Navy FI System 6a Collate/ Process 940R By Pick list or JO/KO Retrieve Pick List or JO/KO from DSS Table Picklist and Staging Update Process 6b 6a 6 20091005

  7. 9.4: Post-Post / Walk Ups / Walk-Thru DSS IA Worksite – Pre-MASTER V1 OUT IN PS I/O F Navy customer 1 Post-Post For DLA IA Material DSS IA Worksite 1a 2 Post-post (system down) Post-Post Manual action Post-Post For Navy IA Material 1b Customer leaves with material 2a Emergent Walk ups & Walk-thru MRP II MAT 4 3 5a2a 511R (C0_ Post-post Transaction Shp.conf 945A(AR_) IF 13 EBS Status Process 6a Update DIFMS • 511R (C0_ • Post-post action • 945A (AR_) 527R (DRA) Post Post Sales Order created 3b 3a 5 5a2 Shipment Confirmation 945A (AR_) is posted against the Sales Order 527R (DRA) • 945A (AR_) 5a1a DAASC 5a1 6b 527R (DRA) • 945A (AR_) 5a3b Customer Bill 7 Customer Bill 8 527R (DRA) • NSY Hold Queue • 945A (AR_) 527R (DRA) Processing Update Cost 5a3a 5a3 DLA System *Customer Document Paperwork must have the following: 14 position Document Number-NSN-Qty-UI-Fund Code-IPD. NSY DMI must contain the JO/KO, DMD SIG DOCU NUM and SUFX if applicable Navy System Navy FI System 20091008_Issue_Order_Postpost_Walk Ups_Walk_Thru_Pre_MASTER_V1

  8. 10.2: Change/cancellation of JON/KO after receipt – Master Out PS I/O F In DLA System Navy System EBS DAASC • 846A MAT 1 • 846A • 846A 2 3 • NSY • pull queue • 947I (DAD) • 947I (DAD) 10 • 947I (DAD) 8 9 • 947I (DAD) 7 • 846A 4 5 11 • 846A • 947I (DAD) DSS IA Worksite 6 Cost (Reservation) 8 20090922_Issue_Order_Open Requisition_Change_JO/KO_Master

  9. IN OUT PS I/O F 10.3: Navy IA Requisition Maintenance - Master Last Holding Activity (Other Service Managed) MRPII User AM_511M/ AC_AK_869C/ AT_869F/ AF_869A Manual AM_511M/ AC_AK_869C/ AT_869F/ AF_869A Manual AM_511M/ AC_AK_869C/ AT_869F/ AF_869A 1e DAASC 1a1 MRPII MAT 1c1 IF11 1b1 Modify/Cancel/Follow up Status Process 1d Manual AM_511M/ AC_AK_869C/ AT_869F/ AF_869A Manual AM_511M/ AC_AK_869C/ AT_869F/ AF_869A 2 EBS Status Response 1a2 1c2 AM_511M/ AC_AK_869C/ AT_869F/ AF_869A 1b2 1f MAT User DLA System Navy System 20090916_Navy IA Requisition_Maintenance_MASTER

  10. IN OUT PS I/O F DLA System Navy System Navy FI System 10.4: Status Process – Master Document Identifier Codes AB_870S AE_870S AS_856S AU_856S DAASC Last Holding Activity or Service ICP 1a Picklist and Staging Update for DSS Navy IA Reqn Maint. 1b1 MAT MRPII 2a 1b1a Update Status 1b Fulfillment Demand Signal / Issue Order DLA Automated Follow-Up Process Navy IA Reqn Maint. Status Response IF 6 Financial Update Off Station / Tiger Team Support FRC Net Demand Signal 1b2 2b EBS 3b 3a Demand Signal Initiation (NSY) Picklist and Staging Update for DSS FI Demand Signal NSY – Call in Process Overnights – Non-DLA Managed 10 20090916_Status_Process_Master

  11. 11.1: Less Than Unit of Issue – Master IN OUT PS I/O F Navy System • DLA’s BRAC SS&D IT solution must be capable of moving material to the Navy Industrial Sites at its wholesale unit of issue but subsequently, issue and bill on a non-standard unit of issue (unit of use) to reflect actual Job/Work Order requirements 846A U13456789 UI :EA 10 EA : 1 BX OHB: 10 EA MRPII MAT EBS DAASC 511R (A0_) 511R (A0_) 1a 4 IF5 3 2 940R U13456789 UI :EA 10 EA : 1 BX Issue Qty: 2 EA 846A 4a 511R (A0_) 1b 947ID8K/D9K 4f 4e 1b1 Status Process 013456789 UI :BX 1 BX : 10 EA OHB: 4 BX Order : 2 ea 4b 5 Inventory Record 013456789 OHB: 3 BX U13456789 OHB: 8 EA 846A 6 947I,D8K/D9K DSS IA Worksite 4d 4c Issue Order process DLA System 11 20090916_Less_Than_Unit_of_Issue_Master

More Related