1 / 8

EDMS:

BIM FORUM #2 Ongoing BIM activities. SMB-SE-DOP. EDMS:. Ongoing Activities SMB-SE-DOP. Some elements in development: Folder BIM for the collaborative projects 3D scan for buildings Connection with the calculation software Integration with the GIS. Ongoing Activities SMB-SE-DOP.

crystalm
Download Presentation

EDMS:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BIM FORUM #2 Ongoing BIM activities. SMB-SE-DOP EDMS:

  2. Ongoing Activities SMB-SE-DOP • Some elements in development: • Folder BIM for the collaborative projects • 3D scan for buildings • Connection with the calculation software • Integration with the GIS

  3. Ongoing Activities SMB-SE-DOP • Folder BIM for the collaborative projects

  4. Ongoing Activities SMB-SE-DOP • 3D scan for buildings Images 360° and scan connected • Possible se in Revit and Catia • Implantation – Coordinates

  5. Ongoing Activities SMB-SE-DOP

  6. Ongoing Activities SMB-SE-DOP • Integration with the • Calculation software

  7. Ongoing Activities SMB-SE-DOP • Integration with the GIS

More Related