Kickoff meeting IDDLS GARR contribution

Kickoff meeting IDDLS GARR contribution. P.Bolletta , M.Carboni , G.Vuagnin. Roma, 24-01-2019. Kickoff meeting IDDLS. Outline. Motivazioni La rete oggi (Ottica e Pacchetto) Evoluzione del modello di rete al fine di adattare diverse necessità

csimmons
Download Presentation

Kickoff meeting IDDLS GARR contribution

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kickoff meeting IDDLSGARR contribution P.Bolletta, M.Carboni, G.Vuagnin Roma, 24-01-2019 Kickoff meeting IDDLS

  2. Outline Motivazioni La rete oggi (Ottica e Pacchetto) Evoluzione del modello di rete al fine di adattare diverse necessità Casi d’uso e possibile modello su larga scala Casi d’uso (arch. di rete) Evoluzione internazionale (via GEANT) DCI – trasponder / pacchetto Schema di base Requisiti DCI Risultati preliminari Piano di lavoro WP2 Concordare su obiettivi e tempi Attività congiunta MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  3. GARR: fibre footprint & optical Network IRU fiber footprint 16000 km ~9.000 Km of backbone ~7.000 Km of access links About 1000 user sites interconnected > 1.5 Tbps aggregated access capacity ~ 3 TbpsBackbone Capacity DWDM/OTN/ROADM Network • (2011) Huawei 1/10 G • (2015) Infinera 10/40/100 G • (2018) Alien Waves 200G between Core PoPs Core IP/MPLS network • Juniper MX960/480/80 Metro/Aggregation • Cisco ME3600/3400 • CPE Cisco 2900 series • ISR-43xx, ISR-4451 MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  4. IP/MPLS Production Network TS1 TN MI3 MI3 PV MI2 MI1 MI2 MI1 Geant TO1 Research Network PD1 GE Peering 200Gbps @MI1 Peering PI1 Upstream Provider Upstream Provider 200Gbps @MI2 PD2 VE-2 Content Delivery SS CA1 Upstream Provider Internet eXchange Point BO3 RM1 FE RM4 10Gbps @RM2 30Gbps @MI2 RM2 BO1 UR BO1 20Gbps @MI2 FRA 20Gbps @RM2 AN FI1 AQ Peering diretti PG LE RM2 FG 10Gbps @TO1 20Gbps @MI2 BR NA2 Cache NA6 2Gbps @FI1 BA1 100 Gbps 20Gbps @BO1 40 Gbps NA1 BA1 SA 1Gbps @PD2 40Gbps @BO1 n*10 Gbps RC NA1 n*1 Gbps CZ CS ME CT1 PA1 MC // Kickoff Meeting IDDLS // Roma, 24/01/2019 CT1 PA1

  5. Cosa serve MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  6. Complete separation of user and GARR control and management planes [MAIN GOAL] Dinamically establish high capacity interconnections between user premises (DC) Provide interconnections self-management tools to the users DC/Transport Network integreted load and failure mangement GARR (transport) network controller/orchestrator provisioning/monitoring/accounting performance/fault management tools User (DC) controller provisioning/monitoring/accounting performance/fault management tools Vendor controller USE CASE GARR - ELISA: High Capacity on demand Actors Problem Statement Solution Architecture/Diagram (e.g.) • A: DC operators manually (?) ask for resources through a transport network interface (web/transport nms access) • B:DC controller interacts with transport network through a network controller/orchestrator NBI • C: DC App interacts with transport network through a network controller/orchestrator NBI MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  7. USE CASE: DCI over R&E European Infrastructure AW - GEANTDWDM network domain • Description: interconnection between 2 DC over multi-domain DWDM Networks (NREN + GEANT) • Prerequisites: • - GEANT community is discussing feasibility of Spectrum Connection Service over the pan-European network • - AW capable NREN dwdm network • - DCI boxes • CNAF CERN seems to be a perfect candidate • Develop this USE Case according to the IDDLS platform should be an added value. DC Z AW - GARR DWDM network domain DC A MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  8. GOAL • GARR is investigating Data Center Interconnection Technologies to match the following use cases: • Data Center Stretching on a Wide Area Network • DCI based link over a 50GHz fixed grid network in Alien Wave mode • Reconfigurable and Programmable High Bandwidth on demand • DWDM Packet Layer integration DC oriented (e.g. Ethernet, VXLAN, spine-leaf architecture optimization) • DWDM Packet Layer integration Transport oriented (e.g. IP/MPLS, Segment Routing, Label Switched Router) MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  9. Topology Day1: Data Center Interconnection • Topological requirements: • DWDM network interfaces • Alien Wave signals over DWDM network • Single or multiple devices • Client traffico protection over a Ring Topology • 10GEth/100GEth client support Core Node2 1200km 300km 200Gbps 400Gbps 200Gbps Core Node1 Core Node3 600km MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  10. Main Requirements • PKT integration (L2-L3) • IP/MPLS feature support • DWDM Long Haul reach • Tunable optics • Flex-Modulation • Alien Wave over legacy DWDM (50GHz) • Optical Performance monitoring • API • Programmable • NBI for performance retrieval • 3rd party NMS integration • Low footprint • Low power consumption • Scalable MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  11. RFI - outcome JUNIPER: ACX6360 (pizza-box Transport Oriented) https://www.juniper.net/assets/us/en/local/pdf/datasheets/1000397-en.pdf ADVA: TIP Vojager (pizza-box L2/L3 oriented) https://www.advaoptical.com/-/media/adva-main-site/resources/data-sheets/pdfs/voyager.ashx?la=en&hash=AA54E396D597804A10525D58BB8F890802A9117D ARISTA: 7500R o 7200R (DC oriented) https://www.arista.com/assets/data/pdf/Datasheets/7280SRAM_DWWMdatasheet.pdf https://www.arista.com/assets/data/pdf/Datasheets/7500RDWDM-Datasheet.pdf INFINERA: Vibe X90 (white box router)– DTN-X XC-3300 (L1 DCI) https://cdn.extranet.coriant.com/resources/Data-Sheets/DS_Vibe_X90_74C0217.pdf https://www.infinera.com/wp-content/uploads/2016/11/Infinera-BR-DTN-X-XT-Series-Meshponders.pdf MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  12. TASK: (revisione dei titoli) • Scoutingtecnologico delle soluzioni Data Centre Interconnect (DCI) disponibili • Identificazione dei requisiti di rete del DataLake • non degli esperimenti INFN • Architettura • Rete/Nodi/Storage/Software • Definizione delle interfacce di comunicazione HW e SW tra le diverse componenti • Test delle soluzioni HW e SW più promettenti in laboratorio • a supporto dell’acquisizione • Integrazioni delle componenti HW e SW delle tecnologie DCI; • Attività che deve essere «calata» all’interno del disegno di architettura (che non è IP) • Sviluppo di competenze per la gestione delle risorse DCI; • Sperimentazione mista laboratorio e infrastruttura di rete geografica • Condivisione dello spettro in ambiente protetto; • modelli di provisioning e di gestione e controllo; • Sperimentazione su infrastruttura geografica su 3 siti. MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  13. Sperimentazione Networking Fase 1: Analisi e studio Scouting tecnologico delle soluzioni Data Centre Interconnect (DCI) disponibili; Identificazione dei requisiti INFN Fase 2: Creazione di un ambiente di laboratorio Test delle soluzioni HW e SW più promettenti; Integrazioni delle componenti HW e SW; Sviluppo di competenze per la gestione delle risorse; Fase 3: Sperimentazione mista laboratorio e infrastruttura di rete geografica Condivisione dello spettro in ambiente protetto; Modelli di provisioning; Modelli di gestione e controllo; Fase 4: Sperimentazione su infrastruttura geografica su 3 siti Condivisione sicura dello spettro ottico Definizione del modello gestionale. MC // Kickoff Meeting IDDLS // Roma, 24/01/2019

  14. IDDLS WP2: Milestones PM6: primi risultati dello scouting tecnologico in laboratorio e indicazioni alle sedi sugli apparati necessari all’interconnessione per iniziare ad effettuare i test [FASE1+FASE2] PM12: inizio sperimentazione mista locale/geografico [FASE3] PM18: analisi dei pattern di utilizzo da parte delle testsuite del WP4 PM24: inizio sperimentazione su rete solo geografica [FASE4] PM36:analisi dei risultati finali completata Non solo GARR MC // Kickoff Meeting IDDLS // Roma, 24/01/2019