Building Public-Private Partnership for Health System Strengthening Contracting out PHC – A case study from Rahim Yar Khan, Pakistan Neelofar Sami Aga Khan University Bali Hyatt Hotel, Sanur , Bali 21-25 June 2010. Session Objectives.

Download Presentation

Building Public-Private Partnership for Health System Strengthening

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building Public-Private Partnership for Health System Strengthening Contracting out PHC – A case study from RahimYar Khan, Pakistan Neelofar Sami Aga Khan University Bali Hyatt Hotel, Sanur, Bali 21-25 June 2010

  2. Session Objectives • To present participants with the RYK case study as an example of PHC contracting • To explain the details of the Rahim Yar Khan contracting case

  3. Country Profile • 6th most populous country in the world, with a population of over 160 millions. • 50 million people are resident of urban areas • Population growth of 1.9% per annum adds 3 million people every year • One third of the population lives below the poverty line • Gross Domestic Product is worth $168 billion • GoP spends 0.5-0.8% of its GDP on health • per-capita health expenditure is Rs. 750 to 800 ($10). 25% is contributed by the public sector and 75% through private out-of-pocket fee-based funding • emphasis to continue and strengthen the shift from curative services to preventive, promotive and PHC.

  4. Public Health Sector Services • MoH is --- policy development/ strategic directions /M&E/technical support/ research /training • Provincial & district departments responsible for delivery/management of health services Through 3-tiered system • Primary---BHUs and RHCs form the core of PHC model • Secondary --- first and second referral facilities providing acute, ambulatory and inpatient care through THQs and DHQs • Tertiary care ---- comprising teaching hospitals

  5. Private Health Sector • Majority of healthcare is financed out-of-pocket. • The private sector has developed considerably by capitalizing on demand. • people prefer private services for quality reasons but prefer public hospitals for inpatient care • Health care is provided by stand-alone clinics operated by individual providers with highest profits for investment

  6. Distribution of Health Workforce/facilities by Public and Private Sector • Annual output of 5,000 medical graduates • 1 doctor/1400 persons (1:1000 WHO recom) Proportion of Workforce in Public : Pvt • Physicians----35:65 • Nurses--------70:30 • Midwives----35:65 No of Facilities • Hospitals---1000 &700 • Beds---------100,00 & 20,000 • Clinics------75000---all Pvt • Trust hospitals---580

  7. RYK Case Study • Enormous amount of funds spent on BHUs, most of the BHUs are not operational • RYK has 4 tehsils. Population 3.68 million • Most BHUs in RYK not functioning properly • District government of RYK decided to work with Punjab Rural Support Program (PRSP) to manage 104 BHUs through contracting out • PRSP was given the government budget to run the RYK BHUs since mid-2003.

  8. Process of Contracting Out The main provisions included: • district government to transfer control, management and use of buildings, furniture and equipment of BHUs to the PRSP • budgetary provisions relating to unfilled posts, medicines, maintenance and repair of buildings, equipment, utilities, stores, and office . • The financial provisions enable the RPSP to undertake financial redesign and make the BHUs run more effectively.

  9. Process Continuted • PRSP to render accounts of management operations to the district government • district government was meant to relocate staff as requested by the PRSP. • All physical assets of BHUs were thus transferred to PRSP, to be returned at the conclusion of the contract.

  10. Methodology • PRSP divided 104 BHUs into 3 clusters • One doctor/cluster appointed as team leader • 12 MOs already living at BHUs +23 new hiring • MOs were offered an interest-free car loan • Government of Punjab guaranteed their contracts remain secure if the PRSP pilot project did not work out. • salaries enhanced from Rs.12000 to 30,000 but private practice was strictly forbidden • Paramedics to be supported by Health Department

  11. Methodology Continued • MOs in charge of entire clusters and they spend alternate days at the three BHUs • MOs to reside in a focal BHU within their cluster and look after emergencies after office hours. • paramedical staff not allowed to charge extra fees on the BHU premises. Just Rs.1 as fee • The MO is responsible for discipline of the cluster BHUs. • The BHU OPD to be conducted by the senior paramedic when the MO is visiting the other two cluster BHUs.

  12. Methodology • Expedited delivery of medicines to BHUs • Physical Infrastructure of BHUs --PRPS made the actual clinics more functional but unable to manage paramedical residences

  13. Results • 100 percent availability of doctors and medicines at each BHU and improvement in staff discipline • greater staff presence at the facilities has translated into a three-fold increase in uptake of services • no changes in the drug procurement system • increase the remuneration of the doctors managing BHUs and assured their residence in 33 BHUs, and they supervising PHC team

  14. Difficulties • No control over quality of medicines • No control over paramedics who practice in private dispensaries • lack of motivation of BHU paramedics--- unfilled vacancies • Management issues