1 / 11

Finalising the selection for Level 1 and Level 2 sorting at NSH /ICH Steps involved

Finalising the selection for Level 1 and Level 2 sorting at NSH /ICH Steps involved. Steps involved. Get the volume of SPAs dispatched Segregate the Volumes for TD and NTD Sort the TD Volume in Descending Order Sort the NTD Volume in Descending Order

Download Presentation

Finalising the selection for Level 1 and Level 2 sorting at NSH /ICH Steps involved

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Finalising the selection for Level 1 and Level 2 sorting at NSH /ICH Steps involved

  2. Steps involved Get the volume of SPAs dispatched Segregate the Volumes for TD and NTD Sort the TD Volume in Descending Order Sort the NTD Volume in Descending Order Top 50 Destinations of TD Volume will form Level 1 TD and next 50 Destinations of TD Volume will form Level 2 TD Top 50 Destinations of NTD Volume will form Level 1 NTD and next 38 Destinations will form Level 2 NTD

  3. Steps in-detail We have to get the volume of SPAs dispatched from our NSH to all the other destinations (TD and NTD) for a specified Period The period can be between 1 to 6 months The volume has to be extracted from the Speednet Database through a SQL Query This extract has to be exported to MS Excel Seggregated as TD and NTD Data has to be sorted in Descending Order of Volume Dispatched for TD and NTD separately Top 50 Destinations will form level 1 and subsequent destinations will form level 2 Finally Sorting Diagram can be designed

  4. Execute MS SQL Query

  5. Result of Query Query executed for NSH Bangalore for July 2013

  6. Export to MS Excel

  7. Add a column TDNTD

  8. Sorting Diagram / Selection for Level – 1 NTD Sorting at Jaipur LEVEL 1 TOTAL : 2,89,328 Based on Data for 10th June- 31st July 2014 Source : Mail Network Optimization Project India Post | 8

  9. Sorting Diagram / Selection for Level – 2 NTD Sorting at Jaipur LEVEL 2 TOTAL : 15,512 Based on Data for 10th June- 31st July 2014 Source : Mail Network Optimization Project India Post | 9

  10. Sorting Diagram / Selection for Level 1 TD Sorting at Jaipur LEVEL 1 TOTAL : 6,73,323 Based on Data for 10th June- 31st July 2014 Source : Mail Network Optimization Project India Post | 10

  11. Sorting Diagram / Selection for Level 2 TD Sorting at Jaipur LEVEL 2 TOTAL : 55,223 Based on Data for 10th June- 31st July 2014 Source : Mail Network Optimization Project India Post | 11