Risk Management

Risk Management. Risk is the product of Probability that something will go wrong And Severity of its consequences How to reduce risk? Reduce probability that something will go wrong Reduce severity of consequences. Risk Management. Failure mode and effects analysis

curtisjones
Download Presentation

Risk Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Risk Management • Risk is the product of • Probability that something will go wrong And • Severity of its consequences • How to reduce risk? • Reduce probability that something will go wrong • Reduce severity of consequences

  2. Risk Management • Failure mode and effects analysis • FMEA involves reviewing as many components, assemblies, and subsystems as possible to identify failure modes, and their causes and effects. For each component, the failure modes and their resulting effects on the rest of the system are recorded in a specific FMEA worksheet. From Wiki

  3. Risks are Everywhere • Think of some task you like to get done today • Does it have a clear, specific, and desired outcome? • Exercise for an hour • Get a bearing for the mini project • Get some lab report done • Endure this class • Endure this class without screaming (desired outcome) • Think of an overseas travel • Think of your capstone project • What are the desired outcomes?

  4. Technical Risk ManagementTRM • TRM 4-step Methodology • Risk Identification • Risk Assessment • Risk Mitigation • Risk Monitoring

  5. Risk Identification • Risk Identification is best done as a group • Identify the desired outcomes • Use brainstorming methods to identify risks • Only include meaningful risks • Continue until no more risks are identified • Keep track of risks as a part of the project plan

  6. Risk Assessment • Risk Assessment • What are the odds of the risk event occurring • Rare • Unlikely • Possible • Likely • Frequent

  7. Risk Assessment • Risk Assessment • What are the consequences of the risk event • Catastrophic • Severe • Marginal (not severe but significant enough) • Negligible • In design projects, the consequences are usually in terms of time, budget, and product meeting PDS targets.

  8. Risk Scoring Matrix

  9. Risk Assessment • Levels of Risk • Extreme – Do not accept level of risk • High – Do not accept level of risk • Medium – Mitigate if resources allow • Low - Accept

  10. Risk Mitigation Plan • Reducing the probability of failure • More knowledge  Less Risk • More accurate assessment • Research + Analysis • Simulation • Experimentation • Published studies, statistical data • Design changes

  11. Risk Mitigation Plan • Reducing consequences of events • More accurate assessment of consequences • Research + Analysis • Simulation • Experimentation • Published studies • Design Changes

  12. Example • Assessment: • Bolt failure for a fuel tank is initially a probable event and its consequences are catastrophic. • Mitigation • Detailed analysis shows it is extremely unlikely. • Further investigation shows consequences are not as severe as initially perceived. OR • Select higher strength or larger bolts • Add features to contain damage in case of failure

  13. Example • Risk • Magnets stuck to the disk may fly off • Probability: High • Consequences: Severe injury or death • Risk Assessment: Extreme

  14. Example • Mitigation (Reducing odds of the event) • More accurate assessment of forces and probability of magnets flying off at maximum 1000 rpm • Conclusions: Very unlikely • Design Changes • Add screws or other retaining parts • Use epoxy • Add speed sensors and automatic cut off

  15. Example • Mitigation (Reducing consequences) • More accurate assessment of consequences • Remains catastrophic • Reducing consequences of the event • Add an enclosure • Operate remotely