An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MI Report • MI operation • Shot to the Tev. • Proton coalesce eff. ~ 86-93% with 13BT • Pbar coalesce eff. ~ 92-95% • Shot to the RR • Efficiency ~ 100% (+/- 2%)in the MI • ~ 97% (+/- 2%) MI => RR • Stacking • Intensity @ TOR105B ~ 8.1E12 with 13BT • Numi • Intensity @ Target ~ 33.8E12 with 11BT Main Injector

  2. Beam to Pbar Main Injector

  3. Beam to Numi Main Injector

  4. Effect of MI8 collimators on $2B intensity SBD MI8 Collimators in MI8 collimators out Main Injector

  5. MI Operation • Issues • MIVAC front–end not responding • Experts Continue to investigate • Has not tripped for several days • MIRF • PA on ST#2 was replaced • MIRF15 modulator air flow was tripping filaments • Abort line vacuum pump is failing. • Needs to be addressed next shutdown Main Injector

  6. MI Operation • Beam intensity operating limits for MI. Measured at I:TOR852 • DOE limit is 9.9E16 protons / Hr. • If violated, DOE is notified and???? • Operating limit is 8.64E16 protons / Hr. • If violated Roger Dixon must agree to turn back on. • Mau Limit is 7.776E16 protons / Hr. • If violated Mau and Roger get an email. The crew chief will reduce intensity. • => 4.75E13 / pulse @ 2.2s rep rate. • => 4.3E12 / Booster batch for all 11 batches Main Injector

  7. MI operations Main Injector

  8. IPM at injection $23, as found Main Injector

  9. IPM at injection $23, after Q849 adjustment Main Injector

  10. NuMi Target Spot Sixe Change with Q849 Adjustment Main Injector

  11. Next week • Pending issues • Abort line vacuum • Beam studies • 12 batch slip stacking on $2E. • MI8 line matching and BPM calibration • MI8 line intensity and collimator losses? Main Injector