630 likes | 801 Views
Congregational Informational Meeting May 23, 2011. Statesboro First United Methodist Church. Vision Statement. “To glorify God and to love others through worship, study and service.”. Decision Making for Church Membership – 3 Step Process. Repair Existing Building
E N D
Congregational Informational MeetingMay 23, 2011 Statesboro First United Methodist Church
Vision Statement “To glorify God and to love others through worship, study and service.”
Decision Making for Church Membership – 3 Step Process Repair Existing Building Future of Trellis Garden Inn Future of New Building Plans
STEP 1: Repair and MaintainPast, Present and Future Committee Committee History Committee Membership Role of Finance and Building Committees Role of Trustees Direction from Church Council
R&M-PPF Committee • John Barton - Chairman, Trustees • Jim Campbell – Past Chairman, Finance • Tommy David – Current Chairman, Finance • Earl Dabbs, Jr. - Chairman, Building • Jimmy High - Chairman, Church Council • Tim Durden - Member at Large • Roxella Ball - Member at Large • Susan Cox - Member at Large • Jimmy Cason - Senior Pastor • Lynda Williamson - Committee Chairman
R&M-PPF CommitteeMission Statement (1) To come up with a best estimate of the cost to repair the existing building and correct any deficiencies the committee deems necessary.
R&M-PPF CommitteeMission Statement (2) To arrive at a best estimate for the annualized cost of maintaining the present facility in “good repair” so that this cost can be included in the budget.
R&M-PPF CommitteeMission Statement (3) To attempt to arrive at an estimate of maintaining the proposed new buildings in “good repair” so that this cost can be annualized and included in our budget.
R&M-PPF CommitteeMission Statement (1) To come up with a best estimate of the cost to repair the existing building and correct any deficiencies the committee deems necessary.
R&M-PPF CommitteeProposal Request Roof Assessment Interior Building Assessment Building Systems Assessment Facility Maintenance Schedule
Introduction Images Exterior Roof HVAC Electrical Interior Recommendations Cost Projections
Orientation • Sanctuary • Class room & Fellowship hall wings Class room wing Sanctuary Fellowship hall wing
Exterior Photos • Stone work 1
Exterior Photos • Stone work
Exterior Photos • Stone work
Exterior Photos • Stone work
Exterior Photos • Stone work
Exterior Photos • Stone work
ExteriorPhotos 1 2
Many roofs • Water stains & damages the stone • Penetrates construction 2 Exterior Photos 1
ExteriorPhotos • Troublesome Area • Wall construction • Roof leaks • HVAC Units on roof • Downspouts dump on to roof
Exterior Photos • Many roofs • Water stains & damages the stone • Penetrates construction
Roof Plan 1. Asphalt Shingle 1. 1. 1.
Roof Plan 1. Asphalt Shingle 2. EPDM (Rubber or single ply) 1. 2. 2. 2. 1. 2. 1. 2. 2.
Roof Plan 1. Asphalt Shingle 2. EPDM (Rubber or single ply) 3. Slate 1. 2. 2. 3. 3. 2. 1. 2. 1. 2. 2.
Roof Photos (shingles) • Class room wing, 20 year shingle about 17 years old • Fellowship hall, 25-30 year shingle about 14 years old Class room wing Fellowship hall
Roof Photos (shingles) • Asphalt shingles • Class room wing • 20 year shingle • Damaged • Missing tabs Class room wing Class room wing
Roof Photos (EPDM) • Roofs are 8-15 years old • All white roofs need to be replaced
Roof Photos (EPDM) • Roofs are 8-15 years old • All white roofs need to be replaced
Roof Photos (slate) • Sanctuary roofs • Slate and EPDM • Solid masonry
Roof Photos (slate) • Most slates in good condition • Broken slate tiles • Missing pieces
Roof Photos (slate) • Most slates in good condition • Broken slate tiles • Missing pieces
Roof Photos (slate) • Most slates in good condition • Broken slate tiles • Missing pieces
Roof Photos • Gutter & Downspouts • Flashing
Roof Photos • Gutter & Downspouts • Flashing
Roof Photos More than just a roof problem Walls and transitions Balcony ceiling
Roof Photos • More than just a roof problem • Walls and transitions
Roof Photos • Flashing problems • Leak on to electric service
Roof Photos • Flashing problems • Leak on to electric service 2
2 1 Roof Photos • Eave gutter transition • Stone coping 1 2
HVAC Photos 2 1
Old units • Disconnected equipment HVAC Photos 1 2
HVAC Photos • Old units • Disconnected equipment
Wall penetrations are opportunities for leaks HVAC Photos
Electrical Photos • Stain glass lights • No conduit cover 1
Electrical Photos • Exposed conduit
HVAC & Electrical Issues • Interior conduit on exterior units • Line sets not secured to building Electrical Photos
Interior Photos • Insulation package 3 1 2
Interior Photos 2 Third Floor • Insulation 1 First Floor 3 Third Floor
Interior Photos • Plaster Work Roof structure 1 Chancel walls