1 / 20

KuPol: A New Ku-Band Polarimeter for the OVRO 40-Meter Telescope

KuPol: A New Ku-Band Polarimeter for the OVRO 40-Meter Telescope. Kirit Karkare Caltech Radio Astronomy Laboratory CASPER Workshop – August 17, 2010. In Collaboration With. Tony Readhead Timothy Pearson Kieran Cleary Glenn Jones Oliver King. Rodrigo Reeves Vasiliki Pavlidou

cyma
Download Presentation

KuPol: A New Ku-Band Polarimeter for the OVRO 40-Meter Telescope

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KuPol:A New Ku-Band Polarimeter for the OVRO 40-Meter Telescope Kirit Karkare Caltech Radio Astronomy Laboratory CASPER Workshop – August 17, 2010

  2. In Collaboration With • Tony Readhead • Timothy Pearson • Kieran Cleary • Glenn Jones • Oliver King • Rodrigo Reeves • Vasiliki Pavlidou • Martin Shepherd • Walter Max-Moerbeck • Joey Richards • Matthew Stevenson

  3. The OVRO 40-Meter Telescope • Located near Big Pine, CA, 4 hours north of Los Angeles • Built in 1966 • Alt-azimuth, f = 0.4 • Previously used for VLBI with Parkes and CMB experiments

  4. The OVRO 40-Meter Telescope

  5. Current Activity (Healey et al, 2008) • Monitoring 1158 candidate gamma-ray blazars • CGRaBS objects with δ > -20° • In collaboration with Fermi Gamma-ray Space Telescope

  6. Blazars • Active galactic nuclei driven by matter accreting into supermassive black holes at the centers of galaxies • Blazars have jets oriented down line of sight • No accepted model for jet acceleration, emission, composition

  7. Science Goals • Correlate radio and gamma-ray light curves • Choose between different models of jet composition, distance from central engine • Delay between radio and gamma-ray peaks can tell us where they are created in the blazar

  8. First Results – Light Curves

  9. Radio lags Radio precedes First Results Gamma-ray flux density Radio flux density • Radio/gamma-ray time lags need longer duration light curves • Radio/gamma-ray flux density correlation is significant

  10. Current System • Dual-beam Dicke-switch radiometer • Single band from 13-16 GHz, 30 K system temp • Lose a factor of sqrt(2) in sensitivity from ideal receiver • What would we like? • Increased sensitivity • Wider bandwidth • Spectral capabilities (not so important for blazars) • Polarization – variability is related to magnetic field structure in jet emission region

  11. Current System

  12. New Receiver Plans

  13. New Receiver Plans • Analog front end: • Combined correlation polarimeter and balanced dual-beam radiometer • Intensity difference between two beams, polarization through correlation • 12-18 GHz • 12 * 500 MHz bands • 20 K system temperature • RF over Optical link down the feed legs to the back end in the control room

  14. Front End Plans

  15. New Receiver Plans • Digital back end: • One ROACH, two iADCs for each of the twelve 500 MHz bands • ROACH at 250 MHz, iADCs at 1 GHz • MHz spectral resolution • Identical programming for each ROACH • Inputs: (A_LCP – B_LCP), (A_LCP + B_LCP), (A_RCP – B_RCP), (A_RCP + B_RCP) • FFT, Demodulate → A_LCP, A_RCP, B_LCP, B_RCP • Stokes → For each horn we get LCP_pow, RCP_pow, real and imaginary components of Q and U

  16. Flexibility • Each of the 12 * 500 MHz bands is independent – can add identical modules to increase bandwidth • Different instruments on same receiver • High resolution spectrometer • RFI excision

  17. Status • Horn design complete • Entire front-end RF chain purchased or being fabricated • OMTs, waveguide phase shifters in fab queue at NRAO • ROACH design almost complete • Commissioning in early 2011

  18. Acknowledgements • CASPER Group • CfA travel funding • Caltech Summer Undergraduate Research Fellowship (SURF program) • Rose Hills Foundation SURF Fellowship

More Related