Water DepartmentFY 2008/09Budget Summary Expenditures • Total Recommended Operating Budget - $7,298,905 • Major factors influencing recommended operations costs: • The combined Personal Services and Employee Benefits objects provide a $113,891 increase (4.5%) • Electricity costs up $77K due to increased unit cost and higher consumption • Other energy costs (fuel oil & propane) up by $10K due to increased unit costs • Chemicals costs up by $7.4K due to increased unit costs • Repair pipe & fittings for field services down by $12K as we will work off of in-stock inventory • Highway supplies up by $4K due to the unit price of asphalt • Gasoline & diesel up by approximately $9K due to increased unit costs • Natural gas increased by $8.8K due to increased unit cost
Water DepartmentFY 2008/09Budget Summary Expenditures(Continued) • General Plant Equipment up by $16K for critical operations & safety items • Transfer to MSIP increased by $17,795 • Total Water Fund Budget decrease of $3,081,279 • FY07/08: $3.8M of retained earnings was budgeted as a draw down from cash reserves to pay for capital projects including upgrades to the WTP. Given the shortfall in revenue, uncertainty in revenues going forward, and the policy of maintaining a working capital balance equal to 180-days of operating expenses, it is recommended that the current year Transfer to Capital Reserve be reduced by $2M, with the balance of the WTP project financed through temporary note issuance. • Interfund Transfers in FY08/09 total $1.4M which includes an increase in contributions to MSIP and a Transfer to Capital Reserve to support cash-funded capital projects
Water DepartmentFY2008/09Budget SummaryRevenue • Total Recommended FY 2008/09 Revenue - $7,298,905 • Major factors influencing revenues: • Revenue from the sale of water is estimated to be $5,732,193 • This reflects a 5% rate increase and is based on a 5-year history of average consumption • Note: Economic downturn & weather-related effects have resulted in revenue shortfalls when compared to MFS Model predictions; to reduce variables associated with these factors, a 5-year average was used • Revenues of $532,969 reflect the second year of the six-year phased increase in fire service charges • Combined public & private fire charges will generate an additional $33,000 during this fiscal year • This is less than the original MFS model projected as it was decided to phase in these charges over six years instead of four years • Recommended connection fees of $100,800 reflect a decrease of approximately $226,600 in budgeted revenue from the FY2007/08 budget • MFS Cost Model anticipated 119 new connections; actual number will be about 36 • Use of Retained Earnings decreased to $493,841 • The proposed use of net assets in FY07/08 and recommended use in FY08/09 is consistent with the goal to maintain working capital at a level equal to 180 days operating expense • Remainder of revenue, $439,102 is derived from the following: • Interest & lien fees, meter installation fees, repairs, inspections, interest, rent, timber sales and miscellaneous
Water DepartmentPerspective • Our current water rate is the lowest of six suppliers serving the Greater Hartford Area • A 5% rate adjustment would increase the average water bill by $2.68/quarter or $10.72/year • A typical ½ liter of bottled water costs approximately $1.39 • For that same $1.39 you could purchase 458 gallons of Manchester water and have it delivered to the tap in your house, based on our present rate of $0.003/gallon • If our rates were to increase by 5% that same $1.39 would purchase 436 gallons of water or $0.0032/gallon delivered to the tap - OR -
Water DepartmentFY 2008/09Recommended Transfer to Reserve Summary Recommended Cash-Funded Capital Improvement Projects 1. Tank Painting $ 65,000 2. Public Works Projects $ 7,500 3. Source of Supply Vehicle Replacement $ 35,000 4. T&D Vehicle Replacement $ 35,000 5. Construction Vehicle Replacement $ 40,000 6. Lydall Dam Rehabilitation $ 35,700 7. Annual purchase of Water Meters $ 50,000 8. Causeway Fence Replacement $ 10,000 9. Data Concentrator Upgrade $ 56,500 10. Leak Detection Survey $ 50,000 Total $ 384,700 Note: Original FY08/09 Request totaled $898,100; reduced by >$500K based on water priority list due to FY07/08 revenue shortfalls
WATER DEPARTMENTFY 2008/09 Transfer to Reserve Request SummaryMoved, Deleted, Reduced or Deferred Items Project NameAmountStatus Oversized Pipe $15,000 Deleted Water Meters $29,500 Reduced Vehicle Replacement - Meters $30,000 Deferred Dump Truck – T&D $150,000 Deferred Abandoned Building Demos $170,000 Deleted Heavy Equipment Replacement $100,000 Deferred Vehicle Replacement – Engineering $25,000 Deleted Total request reduction $519,500
Water DepartmentFY 2008/09Recommended Transfer to Reserve Justification Details Tank Painting - $65,000 • The provides for an annual contribution to the 15-year cycle of tank painting and 5-year inspection cycle; a DPH requirement Public Works Projects - $7,500 • This is the Water Department’s share of the costs of projects that originate from the Public Works Department and/or the State of Connecticut Vehicle Replacement Source of Supply - $35,000 • In-kind replacement of Vehicle #314; 1997 4X4 Pickup Truck with plow Vehicle Replacement T&D - $35,000 • In-kind replacement of Vehicle #367; 1997 4X4 Utility Truck with plow Vehicle Replacement Construction - $40,000 • In-kind replacement of Vehicle #370; 1997 Utility Van
Water DepartmentFY 2008/09 Recommended Transfer to Reserve Justification Details(Continued) Lydall #1 Dam Tree Removal - $35,700 • Work necessary to maintain the integrity of the earthen dam embankment Water Meters Annual Purchase - $50,000 • This is for replenishing the stock of water meters needed for replacement and new customers Causeway Fencing - $10,000 • Replacement of the fence on the East Side of South Main Street as it crosses the Globe Hollow Reservoir as it is in poor condition Data Concentrator Upgrade - $56,500 • This project supplies a new Central Processing Unit for monitoring and control of the Water Treatment Plant & Distribution System Leak Detection Survey - $50,000 • Perform a comprehensive leak detection program of the entire distribution system; reduce the amount of unaccounted for water and preserve supply
WATER DEPARTMENTFY2008/09 BUDGET NOTE-FUNDED PROJECTS
Water DepartmentFY 2008/09Note-Funded Capital Projects SummaryRecommendations Water Quality Improvement ProgramTotal Cost • Infrastructure Improvements $1,500,000 • This is the annual recommended allocation of funds to implement distribution pipe replacement and rehabilitation (R/R) based on the results of the Water Distribution System Evaluation • The study identified areas of undersized or deteriorated water mains and developed a prioritized list of R/R projects • In general, it targets mains that are unlined, 4 inches or smaller, older than 60 years and that require upgrading for hydraulic purposes • These mains can cause water quality problems, increase pumping and maintenance costs, restrict flow rates and limit fire protection capabilities • Long-term finance plan is to authorize $5M on a three year cycle (1.5M/1.5M/2.0M) through the sale of notes
Water DepartmentFY 2008/09Note-Funded Capital Projects SummaryStatus of GHWTP Upgrade Globe Hollow Water Treatment Plant Upgrade • Currently in the 90% design phase • Groundbreaking expected late-summer or early fall 2008 • Project cost estimate is $12,483,000; includes the following: • Installation of an ozonation system for taste and odor control; also provides a barrier against viruses and other pathogens • Will also help reduce & eliminate Pharmaceuticals & Personal Care Products (PPCP’s) • Eliminates gaseous chlorine and replaces it with safer liquid form • Provides renovations to the existing processes and equipment • Reconditions the existing filters and changes media to GAC • Structural repairs and HVAC upgrade • Replaces equipment and the type of lime used for handling safety • Replaces emergency generator • Rehabilitates the flocculation process equipment and chemical tanks • Security upgrades based on EPA Vulnerability Assessment • Improvements and rearrangement of Administrative offices recommended by town-wide efficiency study by Management Partners • Also includes energy efficiency measures, structural deficiencies and brings the facility into compliance with ADA and Building codes • Miscellaneous site work to parking area, driveways & grounds
Water DepartmentFY 2008/09Working Capital Projections • By using $1.8M in cash reserves in FY07/08 instead of $3.8M; and, • By adopting rate adjustments of 5% per year for FY08/09 and FY09/10, • The Water Fund will be positioned to meet the 180-day working capital target for another two years