1 / 22

Seneca Meadows: The First Landfill Gas-to-Vehicle Fuel Project in New York State Richard M. DiGia

Seneca Meadows: The First Landfill Gas-to-Vehicle Fuel Project in New York State Richard M. DiGia President EIF Renewable Energy Holdings Novi, MI - Oakfield, NY The Power of Waste: Renewable Natural Gas for Long Island October 14, 2014. Landfill Gas to Energy.

cyrus-ray
Download Presentation

Seneca Meadows: The First Landfill Gas-to-Vehicle Fuel Project in New York State Richard M. DiGia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Seneca Meadows: The First Landfill Gas-to-Vehicle Fuel Project in New York State Richard M. DiGia President EIF Renewable Energy Holdings Novi, MI - Oakfield, NY The Power of Waste: Renewable Natural Gas for Long Island October 14, 2014

  2. LandfillGas to Energy • EIF Renewable Energy Holdings • Types of Recovery Projects • Facilities in US • Re-Emergence of Pipeline Quality Gas or Renewable Natural Gas (RNG) Projects

  3. EIF Renewable Energy Holdings • Own and/or operate one of the largest LFG portfolios in the US • 265 MWe of base load renewable energy • 38 Renewable Power Projects • 6 Renewable Natural Gas Projects • 13 projects in New York • 4 facilities qualified to produce RNG

  4. Project Locations Clinton Coventry DANC Fulton Model City & Modern Seneca Colonie Winnebago Ontario Ocean Energy & MRPC Keifer II Hyland Steuben Auburn Millersville Butler Salt Lake County Line I-95 Sonoma Erie Chautauqua KCLFG SWACO Sunshine New York Assets Winston-Salem OKC Trail Ridge Brevard Hernando Electric Pine Tree Acres Seminole Ann Arbor Electric O&M Riverview Sarasota Carleton Farms Adrian High/Medium BTU New Development Michigan Assets ____________________ Note: Size reflects illustrative facility capacity. .

  5. LFG Energy Recovery Projects • LFG generation/collection • The three primary methods for utilizing landfill gas • electric power generation • direct use medium-BTU industrial fuels • production of RNG

  6. Type of Projects in US Source: 2013 Update of U.S. Landfill Gas-to-Energy Projects published by the U.S. EPA

  7. Types of Projects in New York Source: 2013 Update of U.S. Landfill Gas-to-Energy Projects published by the U.S. EPA

  8. Electric Generation • Internal Combustion Engine • Gas Turbine • Steam Turbine • Micro Turbine

  9. Electric Generation

  10. Direct Use • Industrial FuelBurning Equipment • Steam Boilers • Aggregate Dryers –Asphalt Production • Brick Kiln • Leachate Evaporation

  11. Direct Use

  12. Renewable Natural Gas • Organic Solvents • Membranes • Adsorption

  13. Renewable Natural Gas Seneca KCLFG SWACO KCLFG SWACO OKC OKC

  14. US Natural Gas Pipelines Transportation of gas opens markets across the US

  15. RNG Math • Four Facilities – NY, OH, KS, OK • Combined Production Capacity • 11,000 MMBtu/Day • MMBtu to GGE of CNG = 12.98* • 142,780 GGE per day • Annually displaces 52 million gallons of gasoline • Annual reduction of 124 million tons of CO2 emissions* from gasoline * Based on USEPA conversion factors

  16. RNG Math • Seneca New York Facility • Production Capacity • 2,000 MMBtu/Day • 25,960 GGE per day • The average convenience store sells 4,000 gallons of gasoline per day * • 6 ½ average stations to sell output from Seneca based on gasoline sales • Access to national pipeline network mandatory to move production to markets * Based on NACS bulletin

  17. RNG – Technical Considerations

  18. RNG – Environmental/Regulatory Considerations

  19. RNG – Economic Considerations

  20. RNG – Legislative and Policy Considerations • Federal • Encourage all renewable uses • Long term certainty • Realistic and timely rule making • States • Adopt low carbon fuel standard • Encourage pipeline access • Qualify broad range of resources

More Related