1 / 12

The Navy Yard The Campus. The Energy. The Opportunity.

The Navy Yard The Campus. The Energy. The Opportunity. 2013 master plan updated Districts. 2004 Master Plan. Navy Expansion. Port. Buffer. The unregulated Navy Yard Grid. 19MW. 15MW. The navy yard grid - Today. 13.3 kV/2300 V Primary 29 MW Peak Demand 34 MW Capacity

dafydd
Download Presentation

The Navy Yard The Campus. The Energy. The Opportunity.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Navy Yard The Campus. The Energy. The Opportunity.

  2. 2013 master plan updated Districts 2004 Master Plan Navy Expansion Port Buffer

  3. The unregulated Navy Yard Grid 19MW 15MW

  4. The navy yard grid - Today • 13.3 kV/2300 V Primary • 29 MW Peak Demand • 34 MW Capacity • Two primary substations - 15 MW & 19 MW • 100 miles of Distribution Feeders – Subsurface • 164 Transformers • No NOC or SCADA • 65 Customers (8 Customers - 88% Usage) • 182 Revenue Meters – 3 Tier Tariff • 96% External Sourced Supply • On-site Generation – 600 kW Fuel Cell

  5. Energy Master Plan TEAM Technical Advisor:

  6. Scenario b: Demand mitigation Business as Usual – 100% Utility Fed • All PECO supply • No On-site generation (DG) • No proactive EE or DR effort Utility Demand - 82 MW On-Site DG Grid Programs: • Natural gas DG • 6 MW Peak Reduction • 3 MW CHP (data center) • 1 MW Solar PV • 600 KW Fuel Cell Utility Demand - 72 MW Demand Response & Energy Efficiency Customer programs: • 20% EE goal by 2022 • Navy DOD mandates • B-T-M Demand Reduction Utility Demand - 60 MW Cumulative usage decrease – over 61,000 MWh

  7. Energy Master Plan – scenario b

  8. Capital investment summary

  9. TNYEMP Implementation 2013 - 2014 Burns/Alstom/PECO • 10 MW New Capacity for LDC (PECO) • New 15 MW West Entrance Substation Design (Burns) • Functional Definition – Business Requirement Analysis (Alstom) • AMI Design, Specification, Vendor Identification (Alstom) • Meters • Communications • Field network • Backbone • Infrastructure • NOC • Operations/Business Data Model • Time Series Data Base/Historian • MDM 3 Lines 15 MW 3 Lines 15 MW 3 Lines 15 MW

  10. GridSTAR - Plug & Play Microgrid PIDC Building – BEMS/DR EVC - (V2G) Net Zero Bldg–ES/SPV/B2G SPV Training Center AMI Solar PV installation Grid-interactive ES 1 2 7 3 5 6 4

  11. Energy Master Plan – Analysis of Viable Scenario Alternatives 12/12 12/13 12/14 12/15 12/16 12/17 12/18 12/19 12/20 12/21 12/22

  12. Will Agate, SVP, The Navy Yard PIDC www.navyyard.org /TheNavyYard @NavyYardPhila