120 likes | 229 Views
EXPERIMENTAL BEAM TRANSPORT: g2P / geP Experiment. HALL A g2P/ geP EXPERIMENTAL BEAM TRANSPORT TEAM. DESIGNERS FABRICATION Stephanie Worthington -Lead Larry Munk Danovic Spell SUPPORT GROUPS
E N D
HALL A g2P/ geP EXPERIMENTAL BEAM TRANSPORT TEAM DESIGNERSFABRICATION • Stephanie Worthington -Lead Larry Munk • Danovic Spell SUPPORT GROUPS • Bruce Reinhart HALL A coordinator’s Team ENGINEERS Accelerator: Installation • L. A. Dillon-Townes Alignment • Marie Ivanco Vacuum • Shirley Yang Electrical Groups
CURRENT BEAMLINE CONFIGURATION EP PIVOT Superharp Girder g2P/geP BEAMLINE CONFIGURATION 87.693 cm Target Calorimeter Pivot Slow Raster FZ1 & FZ2 REGION 5 REGION 3 REGION 2 REGION 1 REGION 4
CURRENT STATUS • Preparing FZ2 Telescoping Stand for procurement • Finalizing FZ2 movement mechanism • Refurbish existing Slow Raster Power Supply Shielding Box • Finalize Harp Flag design and wiring fixture • Resolve Support for AI magnet