NCAR Supercomputing ‘Data Center’ Project

NCAR Supercomputing ‘Data Center’ Project. An NCAR-led computing ‘facility’ for the study of the Earth system. Outline. A Problem An Opportunity NSF’s Petascale Roadmap A Solution Facility Proposal: Site and Cost Partners The Scientific Payoff Next Steps Schedule and Panels.

dale
Download Presentation

NCAR Supercomputing ‘Data Center’ Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NCAR Supercomputing ‘Data Center’ Project An NCAR-led computing ‘facility’ for the study of the Earth system

  2. Outline • A Problem • An Opportunity • NSF’s Petascale Roadmap • A Solution • Facility Proposal: Site and Cost • Partners • The Scientific Payoff • Next Steps • Schedule and Panels

  3. NCAR Leadership in Supercomputing… • One of the founding missions of NCAR was: “…to provide, or arrange for provision of facilities for the scientific community as a whole that whose initial cost and upkeep lie beyond the capability of individual universities or research groups.”–Preliminary Plans for a National Institute for Atmospheric Research. 1959 – NCAR Blue Book • Note: the wording does not imply physical collocation. • This mission does confer a responsibility that cannot be delegated - namely maintaining an complete integrated cyberinfrastructure (CI) system for modeling and data analysis that meets our scientific community’s needs.

  4. Examples of NCAR simulation science today • Global change climate ensembles • Weather Research Forecast • Geophysical Turbulence • Fire storm front modeling • Space weather • More…

  5. A problem • NCAR Mesa Lab computer facility is quickly becoming obsolete • Power, cooling and floor space will be inadequate beyond the next procurement • Science is being restricted by focusing on capacity ahead of capability

  6. CMOS Trends Continue …

  7. Chips: Faster, Cheaper but Hotter

  8. An OpportunityNSF’s Petascale Roadmap DRAFT “Overarching Recommendation: Establish a Petascale Collaboratory for the Geosciences with the mission to provide leadership-class computational resources that will make it possible to address, and minimize the time to solution of, the most challenging problems facing the geosciences.” www.joss.ucar.edu/joss_psg/meetings/petascale/

  9. Software Service Provider (SSP) S&E Community Portable, Scalable Applications Software & Services Science-Driven HPC Systems HPC Resource Providers Agency Partners SSP Local Storage Visualization Facilities Compute Engines SSP Private Sector Strategic Plan for High Performance Computing(2006-2010)

  10. NSF Conclusions • NSF is committed to developing and implementing a strategic plan for cyberinfrastructure • Broad based plan involving the university, Federal agencies, vendors, and International partners • ATM, OCE, and EAR take different approaches to the realization of CI for their discipline • Dependent on the readiness of the community • Petascale facility is an integrating theme for the Geosciences community • High potential for the generation of new knowledge and paradigm for the conduct of research • Building and sustaining a petascale facility will be a significant challenge to budgets and technology • Consistent with NSF strategic vision for CI

  11. A solution for NCAR • A new computing facility (not at the Mesa Lab) • Extensive investigations, working with consultants and internal needs resulted in a detailed set of options • Provides for 5-20 years of computing (capacity and capability) diversity based on current and predicted future trends in CMOS technology • Allows NCAR to reach beyond its current research scope

  12. The facility needed • Data Center Expansion Report from NCAR’s Computing and Information Systems Lab • 20,000 (initial to 60,000) sq. ft. • 4 (to 13) MW power + generators • Cooling, etc. • On 13 acres (20 year lifetime) • Accommodates computers, staff, open space, initial and future requirements

  13. Birds Eye View

  14. Phase 2 Addition Phase 3 Addition Architectural View

  15. (Water, Political Complications, Fiber Optics) (Electrical Capacity) Importance of Site Selection • Limited selection of sites that meet criteria • Size (10-15 acres) • Electrical capacity (up to 24 MW) • Fiber optic route (dark fiber) • Investigated • Marshall • Louisville • Longmont • Westminster • New partners and options are now being sought • IBM • Colorado School of Mines • Colorado State University • University of Colorado • University of Wyoming

  16. Cost Drivers • Primary Drivers • Tier III Reliability • Mechanical Systems • Electrical Systems • Engineering • Secondary Drivers • Building Size • Land Site • Facility - up to $75M (one time) • Operations - $15M/year? (2X) • Computing increments - $15M/year (2X) • Computing infrastructure - $5M/year

  17. The Scientific Payoff…

  18. A petascale computer will enable scientists to … • Do credible regional climate modeling for decision support. Requires resolving individual mountain ranges and ocean western boundary currents. • Model climate and weather in a fully coupled mode. • Better understand the marine biogeochemical cycles. Requires resolving ocean mesoscale eddies. • Accurately simulate the dynamical, microphysical and radiative cloud processes. • Improve seismic predictions and understand the structure of the inner core as well as the fine structure of the lower mantle.

  19. A petascale computer will enable scientists to • Perform new research in solid earth and environmental engineering • Assimilate thousands of earthquakes bringing the fine structure of the Earth’s mantle and inner core into focus. • Study the physical basis of land surface parameterizations by modeling soils, topography and vegetation at sub-meter scales. • More accurately predict the damaging effects of solar flares on satellites and power distribution systems by resolving the fine structure of the corona magnetic field. • Investigate energy management applications

  20. Science examples …

  21. 2005 Hurricane Katrina, Track Forecast 4 km, 62 h forecast Observed Track 12 km, 86 h forecast Official Forecast Landfall on 8/29 14Z, Louisiana/Mississippi Border

  22. Hurricane Katrina Reflectivity at Landfall 29 Aug 2005 14 Z 4 km WRF, 62 h forecast Mobile Radar

  23. WRF 4 km Hurricane Katrina 72 h Forecast Initialized 27 Aug 2005 00 Z Radar Composite Reflectivity WRF Max Reflectivity

  24. Coupled Climate System Model

  25. Integrated Space Weather Modeling

  26. Thus …

  27. Main Points • Huge scientific discoveries await geoscience modelers at 1 PFLOPS and beyond. • CMOS continues to get hotter and cheaper. The most recent acquisition tracks this trend. • Every center is (or will be) facing facility challenges in the race to these discoveries. This situation is NOT unique to NCAR. • NCAR now has a facility plan, that if successful, uniquely positions it as a world leader in geoscience simulation. • The new facility is not a crisis: it is an opportunity.

  28. The Opportunity • Understanding of fundamental physical processes in the Sun-Earth system • Environmental and Energy applications not yet possible • NCAR and partners will scope/define these options • Such a facility would be a computational equivalent of the Hubble Telescope for geoscience simulation.

  29. Next Steps

  30. The Schedule • Formed NCAR project committee • Forming Blue Ribbon Panel and hold teleconference - mid-Oct. 2005, meet mid-Nov. • Project plan development Oct-Dec • Community engagement - Nov-Jan • Formalize partnerships - Oct-Dec • Present initial plan to National Science Foundation, mid-October, 2005 • Forge international collaborations - Nov. 2005 • Complete project plan - Feb. 2005 • Initiate facility - June 2006? • First electrons - June 2008 - March 2009?

  31. Contacts at NCAR • Tim Killeen (killeen@ucar.edu) - NCAR Director • Lawrence Buja (southern@ucar.edu) and Peter Fox (pfox@ucar.edu) are co-chairs of the NCAR project team • Aaron Anderson (aaron@ucar.edu) is the computing facilities contact • Jeff Reaves (jreaves@ucar.edu) is the financial/ contracts contact

  32. Concluding remarks …