540 likes | 713 Views
Conceptual Learning Objectives. C1: Distinguish between the plantwide overhead rate method, the departmental overhead rate method, and activity-based costing method.C2: Explain cost flows for the plant wide overhead rate method.C3: Explain cost flows for the departmental overhead rate method.C4:
E N D
1. Chapter 17 Activity-Based Costing and Analysis