An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EnergiarbeteipraktikenPICASSO Agneta Ring Environmental Manager BT Products AB Bild från Klas Klas Gustafsson VD Mjölby Svartådalen Energi AB

  2. Verksamheten i Mjölby BT Flygfoto 2003

  3. PROJECT PICASSO Target Tact time: 1,8 min Capacity 70.000 forklifts/ year, 2-shift Specification New automated powder paint line. For forklift parts from Riders sortiment. Total process time: ~3,5 h Max weight: 1200 kg Max mess.: LxWxH 3200x1600x2300 mm Colors: Black 2 automated booths (robots) Orange 1 automated booth (robots) Special 1 booth (manual)