An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. e+ソースの現状 シカゴGDE meeting に向けて 大森 GDE 活動報告会 2008年10月6日 大森 GDE 活動報告会 2008年6月23日 かなりの数のスライドが、栗木さんが先ごろ大邱 "2nd Asia ILC R&D Seminar, Sep 29-30, 2008" で行った公演のスライドからの、借用です

  2. Working Groups and Conveners ILC08 - Accelerator 1. Sources Axel Brachmann, Jim Clarke

  3. ILC and Positron Source • Undulator is the baseline design. • Two alternatives: • Conventional (electron driven) is a fall back. • Laser Compton is an advanced alternative. • Any schemes are not fully established. Need a certain amount of R&D for ILC positron source. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  4. Baseline Design • It relies upon gamma rays generated by passing 150 GeV electron through 168m undulator. • Undulator is “inserted” to part way of ML (150GeV). • A positron source driven by 0.5 GeV electron is a back up for high availability and machine commissioning. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  5. Undulator Parameters M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  6. Matching Device • The generated positrons is a point like with a large transverse momentum spread. • That should be converted to a parallel beam for further acceleration; The matching device does it. • Depending on the matching device, it increases capture efficiency from 10% to 40%. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  7. DC Solenoid • High field (6T) and high capture efficiency(30%). • Similar to other DC SC magnets; It is technically matured. • It is not feasible for ILC since 100's of kW of eddy current in a fast rotating metal target. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  8. Shielded Flux Concentrator • Ramping from 0T to 7 T in 2cm (no field on target). • Capture Efficiency ~21% • Difficult technically to sustain 1ms pulse train length. • Further study needed to prove feasibility (prototype). M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  9. Quarter Wave Transformer • Ramping from 0T to 1 T in 5cm (no field on target). • Capture efficiency ~ 15%. • Technically matured and realizable (actual baseline). M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  10. Summary for baseline • R&D efforts for critical devices are in progress (undulator, target, etc). • Although Matching device is one of the most important, the R&D is stopped. • QWT is the only realistic solution at this moment and it should be actual baseline as long as there is no big progress on R&D for MD. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  11. Alternative Design • e- driven scheme (conventional) and Laser Compton scheme are considered to be alternative schemes. • e- driven scheme is a back-up alternative. • Laser Compton is an advanced alternative. • Because the baseline design is a totally new approach, a conservative alternative is very important as a technical backup. • Laser Compton is attractive, but it is technically immature; It is advanced alternative. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  12. e- driven scheme • e- drive beam impinges on a conversion target. • 6 GeV 2E+10 e- bunch. • Amorphous W (W-Re alloy), crystalline W, diamond, liquid Pb-Sn,etc. • Capture devices. • E+ booster up to 5 GeV: The technology depends on the pulse structure; SC for long pulse case (~1ms) and NC for short pulse case (<50μs). • The most important and difficult issue is conversion target. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  13. CHANNELING FOR ILC & CLIC e+ sourceR. Chehab • A single target works for CLIC, but multi-target is needed for ILC limited by PEDD. • A single target might work for ILC in Low P parameter. “x” meters e+ Only the photons are impinging on the converter: that limits the energy deposition in the amorphous target. γ e- e+, e-,  e- Crystal Amorphous Radiator Converter M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  14. Liquid lead target Driving motor • A prototype in BINP has been operated 20000h without any troubles. • Pb 90% Sn 10%, 300˚C, Cog-wheel pump. • Brazing technique for BN window has been established. Cog-wheel pump Vacuum pump Target head Liquid Pb-Sn jet in vacuum transport tubes M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  15. Liquid Pb-Sn Target • Liquid Pb target + BN window is very strong against high peak power, but less average power. • Pulsed operation (e.g. 100 bunches with 6.2ns spacing, 0.6μs, 150Hz) moderates thermal effects. • In the pulse operation, capture efficiency is higher and incident electron can be fewer. Average power (kW) Operation point Energy/100ps GeV/mm21012 • P. Logachov et al. in APAC2007 M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  16. Laser Compton Scheme • A few GeV (1.8GeV for example) electron bunch collides with 1μm laser photon stored in optical cavity. • Several 10s MeV gamma impinges in a conversion target. • A dedicated electron driver is reasonable. • Obtaining enough positron, is a technical challenge. • High intensity electron beam: Linac, Storage ring, ERL • High intensity photon beam: High power laser, optical cavity. • Stacking scheme: DR stacking, Pre-DR, etc. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  17. Compton Ring • A storage ring for electron driver:5.3nC, 6.2ns, 1ps, 1.8GeV, 0.6Jx5CP. • Positron bunch(Ne+:2.0E+8) is generated. • 10 bunches are stacked on a same bucket. This process is repeated 10 times with 10ms interval for beam cooling. • Finally, Ne+:2E+10 is obtained. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  18. ERL • ERL(Energy Recovery Linac) is employed as the dedicated electron driver. • 0.48nC, 18.5ns (54MHz) ~ 26mA, E=1.8GeV • Nγ=2.3E+9 by 0.6 Jx5 CP, Ne+=2.0E+7 • By a semi-CW operation (50ms), 1000 times stacking in DR is performed and Ne+=2.0E+10 is obtained. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  19. Stacking Simulation F. Zimmermann • # of positron by a single collision is not sufficient -> need stacking. • Stacking simulation in DR (multi-turn injection) shows 10.6% of injected e+ are lost! stacking efficiency ~90%. • The tolerance of the injection loss would be qualified. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  20. CLIC Compton Scheme • Collaboration on Positron Generationstrongly supported by CLIC and ILC managements (J.P. Delahaye@PosiPol08) by F. Zimmermann & L. Rinolfi M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  21. ILC Positron Source:MM • Undulator is moved to the end of ML (250GeV). • Energy scan <100GeV is difficult. • Dedicated pulse for e+ generation with ½L. • QWT instead of AMD, which has lower capture efficiency; The undulator length is 350m. • KAS share the common target with gamma1 source; yield is only 1% of the nominal intensity. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  22. Further Considerations on MM • Improved Low P parameter : half # of bunches in a pulse. • It is a big fair wind for the electron driven. • Potential target damage, which is the most serious issue on electron driven scheme, is relaxed. • There are active R&D on noble ideas. • No doubts that Conventional is really “conventional”. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  23. TDP Summary • Basic R&D is very important in TDP1. • Re-baseline at the end of TDP-1 is the mile-stone. • According to the investigation based on the latest technology, the status is: • The conventional method is important as a fall-back. Low P parameter and noble target technologies make it feasible and reliable. • Technical difficulty forces the undulator system bigger and bigger and it does not seem “mimimal machine”. • From the pure technical point of view, the baseline is the electron driven and undulator and laser compton are upgrade alternatives. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008

  24. Summary • R&D status of ILC positron source is reviewed. • Undulator scheme is the baseline design. • SC helical Undulator, rotating rim target prototype. • Need study for matching device. • e- driven scheme is important as a backup. • There are several active R&Ds based on noble ideas. It is the best scheme for MM. • Laser Compton is an advanced alternative. • Aggressive R&D efforts. • Still need more technical maturity. • ILC-CLIC collaboration. M. Kuriki, 2nd Asia ILC R&D Seminar, Sep 29-30, 2008