An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wed Dec 7 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Beam Stopped at 18:00 TX54 CP SL martin.gastal@cern.ch

  2. Thu Dec 8 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Magnet ramp down initiated at 06:00 Request to take data at 0B EE 1h 4. EN-HE: Restart Crane Eric + 2Altead 1h WP: 3. Open PX56 Plug JP 20’ WP: 6. CV Switch ventilation to shutdown mode G DucretWP: 2. Open VAC shielding 8:00 Maf + 3 FSU 1h WP: 7’. Lower 2 CPs + 1SL E Dugue 3h WP: 7. Install collar switchboards Silverio 20’ WP: 0. Full RP sweep Heinz + 3RPEs 10:30am 2h WP: 8. Check HF jacks Hubert /Silverio2h WP: 5. Prepare GIS 14:00Gerhard 8h WP: 1. Take RP water/C6F14 samples Heinz + CV/DC 2h WP: Install SU brackets Antje 5h WP: TX54 CP SL martin.gastal@cern.ch

  3. Fri Dec 9 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Start of Water cooling maintenance: 08:00 Disconnect –Z fibre optical sensors Salvatore 1h WP: 2. Remove shims between collar and RS+Z Dmitry + 2 Russian Tecs 1h WP: 3. Open RS+Z Pascal /Sandro 30’ WP: A. Remove shims between collar and RS-Z Dmitry + 2 Russian Tecs 1h WP: 3’. RP sweep inside RS+Z Area Angelito 1h WP: 1. Inject Ne 8:00 Gerhard 8h WP: B. Open RS-Z Pascal /Sandro 30’ WP: 014 4. Remove CCTRXP & CCHFPP position sensors Joao + Alex 15’ WP: C. Remove 4 X-Stops and Open Collar-Z Dmitry/Alex 2h WP: 5. Remove 4 X-Stops and Open +Z Collar Dmitry/Alex/Maf2h WP: C’. RP sweep inside RS-Z Wolfram1h WP: 6. Remove HF+Z X stop (with CP) Maf + 2 Russian tecs1.5h WP: D. Remove HF X stop (with CP) Maf + 2 Russian tecs1.5h WP: 017 Survey Cavern floor Antje 3h WP: TX54 CP SL martin.gastal@cern.ch

  4. Mon Dec 12 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept AUG tests – CMS underground Facility OFF LIMITS TX54 CP SL martin.gastal@cern.ch

  5. Tue Dec 13 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Diesel Test A. Move HF-Z away from IP Maf/Sandro + 1 VSC + 2 Rtecs10’ WP: 1. Move HF+Z away from IP Maf/Sandro + 1 VSC + 2 Rtecs10’ WP: B. Disconnect T1 services Nicola 2h WP: 2. Disconnect T1 services Nicola 2h WP: C. Open HF- + flooring Maf/Sandro/Alex + 1VSC1h WP: 3. Open HF + flooring Maf/Sandro/Alex + 1VSC 1h WP: D. Release CASTOR services Dmitry 1h WP: 020 4. RP sweep inside HF+ 2 RPE 20’ WP: D’. RP sweep inside HF- 2 RPE 20’ WP: 001 5. Open T2 & BSC Dmitry /Alex 30’ WP: E. Remove CRP proximity sensors Joao 10’ WP: A5 6. Survey BP @ 15m Antje + 1VSC 3h WP: F. Open CASTOR Dmitry /Alx30’ WP: 021 6’. RemoveCTZPproximity sensors Joao 10’ WP: G. Open T2 & BSC Nicola /Alex 30’ WP: 025 H. Remove HF X stop (with CP) Maf + 2 Russian tecs1.5h WP: TX54 CP SL martin.gastal@cern.ch

  6. Wed Dec 14 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept 1. Release BP support @ 13.5m 2VSC + Sandro 2h WP: A. Survey BP @ 15m Antje + 1VSC 3h WP:022 2. Block BP support @ 13.5m in parking position 2VSC + Sandro 30’ WP: A’. RemoveCTZPproximity sensors Joao 10’ WP: # 3. Remove proximity sensors 30’ WP: # B. Perform CASTOR removal Dmitry 7h WP: 4. Remove access gangway to HF+Z Eric + 2Altead 1h WP: 026 C. Perform ½ CASTOR Installation-removal Exercise at BP level Dmitry 1h WP: 5. EN-HE – Remove HF+ I beams Eric + 3 Altead 2h WP:027 6. Remove HF+Z towers reinforcement Marc /Herve + 2RTecs 3h WP: 028 7. Lower HF on 3 risers Marc/Herve + 2 Rtecs 4h WP: 029 8. EN-HE – lift up 1 riser Eric + 2Altead 2h WP:030 TX54 CP SL martin.gastal@cern.ch

  7. Thu Dec 15 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Survey link Cavern-Su galleries Antje Andreas 8h WP: A. Release BP support @ 13.5m 2VSC + Sandro 2h WP: B. Block BP support @ 13.5m in parking position 2VSC + Sandro 30’ WP: C. Remove proximity sensors 30’ WP: # D. Remove access gangway to HF-Z Eric + 2Altead 1h WP: 026 0. Lower HF on 2 risers Marc/Herve + 2 Rtecs 4h WP: 029 1. EN-HE – lift up 1 riser Eric + 2Altead 2h WP:030 E. EN-HE – Remove HF- I beams Eric + 3 Altead 2h WP:027 2. Install tooling for extension beam Sandro + 2Vac 5h WP: 031 F. Remove HF- towers reinforcement Marc /Herve + 2RTecs 3h WP: 028 3. Install extension beam on FIN 3VSC + Sandro + 2 Altead 3h WP:032 G. Lower HF on 2 risers Marc/Herve + 2 Rtecs 4h WP: 029 H. EN-HE – lift up risers Eric + 2Altead 2h WP:030 TX54 CP SL martin.gastal@cern.ch

  8. Fri Dec 16 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept A. Install supports for COLLAR table Maf : 30’ WP: B. Move collar table out by 60cm Dmitry+ 2FSU 2h WP: C. Install tooling for extension beam Sandro + 2Vac 5h WP: 031 0. Survey TAS + Fwd BP 4h D. Install extension beam on FIN 3VSC + Sandro + 2 Altead 3h WP:032 Perform load transfer on Ext beam 3VSC + Sandro + 1Altead 5h WP: 1’. Survey BP Andre + 1VSC 5h WP: 2. Remove HF handrail on IP side Maf + 2FSU 1h WP: Remove green support beams TX54 CP SL martin.gastal@cern.ch

  9. Mon Dec 19 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Start of crane installation in CV room a Survey TAS + Fwd BP 4h 1. Lower HF+Z on floor Marc/Herve + 2 Rtecs 4h WP: b. Perform load transfer on Ext beam 3VSC + Sandro + 1Altead 5h WP:034 2. EN-HE – lift up risers Eric + 2Altead 2h WP: b’. Survey BP Andre + 1VSC 5h WP:035 3. Move HF+Z in garage Pascal + 2 Rtecs 4h WP: c. Remove HF handrail on IP side Maf + 2FSU 1h WP: 216 d. Move collar table in by 60cm + remove supports Maf + 2FSU 2h WP: 216 TX54 CP SL martin.gastal@cern.ch

  10. Tue Dec 20 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept 1. Lower HF-Z on floor Marc/Herve + 2 Rtecs 4h WP: 2. EN-HE – lift up risers Eric + 2Altead 2h WP: 3. Move HF-Z in garage Pascal + 2 Rtecs 4h WP: Remove 1/2 BSC A Bell 4h WP: TX54 CP SL martin.gastal@cern.ch

  11. Wed Dec 21 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Erect scaffolding for BP bake-out Erect scaffolding for BP bake-out Remove 1/2 BSC + install new one A Bell 4h WP: TX54 CP SL martin.gastal@cern.ch

  12. Thu Dec 22 Availability of Services: CERN Closed ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Erect scaffolding for BP bakeout Erect scaffolding for BP bakeout TX54 CP SL martin.gastal@cern.ch

  13. Fri Dec 23 Availability of Services: CERN Closed ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept TX54 CP SL martin.gastal@cern.ch

  14. Mon Dec 26 Availability of Services: CERN Closed ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept TX54 CP SL martin.gastal@cern.ch

  15. Tue Dec 27 Availability of Services: CERN Closed ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept TX54 CP SL martin.gastal@cern.ch

  16. Wed Dec 28 Availability of Services: CERN Closed ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept TX54 CP SL martin.gastal@cern.ch

  17. Thu Dec 29 Availability of Services: CERN Closed ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept TX54 CP SL martin.gastal@cern.ch

  18. Fri Dec 30 Availability of Services: CERN Closed ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept TX54 CP SL martin.gastal@cern.ch

  19. Mon Jan 2 Availability of Services: CERN Closed ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept TX54 CP SL martin.gastal@cern.ch

  20. Tue Jan 3 Availability of Services: CERN Closed ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept TX54 CP SL martin.gastal@cern.ch

  21. Wed Jan 4 Availability of Services: CERN Closed ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept TX54 CP SL martin.gastal@cern.ch

  22. Thu Jan 5 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept CSC Posts a. Open FIN Doors 1h 1. Open FIN Doors 1h b. Remove FIN plug 1h 2. Remove FIN plug 1h Install PLT Martin d1/4 WP: Remove 1/2 BSC A Bell 4h WP: c. Prepare for radioscopy 6h 3. Prepare for radioscopy 6h TX54 CP SL martin.gastal@cern.ch

  23. Fri Jan 6 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept CSC Posts Carry out radioscopy 8h Carry out radioscopy 8h Install PLT Martin d2/4 WP: Install BLM Dmitry 1d WP: TX54 CP SL martin.gastal@cern.ch

  24. Mon Jan 9 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept CSC Posts CSC Posts Prepare for bake-out 8h Prepare for bake-out 8h Install PLT Martin d3/4 WP: TX54 CP SL martin.gastal@cern.ch

  25. Tue Jan 10 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept CSC Posts CSC Posts Prepare for bake-out 8h Prepare for bake-out 8h Install PLT Martin d4/4 WP: TX54 CP SL martin.gastal@cern.ch

  26. Wed Jan 11 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept CSC Posts Prepare for bake-out 8h Prepare for bake-out 8h TX54 CP SL martin.gastal@cern.ch

  27. Thu Jan 12 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Bake-out -Z 8h TX54 CP SL martin.gastal@cern.ch

  28. Fri Jan 13 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Bake-out -Z 8h TX54 CP SL martin.gastal@cern.ch

  29. Mon Jan 16 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Bake-out -Z 8h TX54 CP SL martin.gastal@cern.ch

  30. Tue Jan 17 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Bake-out +Z 8h TX54 CP SL martin.gastal@cern.ch

  31. Wed Jan 18 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Bake-out +Z 8h TX54 CP SL martin.gastal@cern.ch f Close Collar 1h WP:

  32. Thu Jan 19 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Bake-out +Z 8h Prepare GIS 8h TX54 CP SL martin.gastal@cern.ch

  33. Fri Jan 20 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Inject Ne in BP 8h TX54 CP SL martin.gastal@cern.ch

  34. Mon Jan 23 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept 1. Install FIN plug + close FIN doors Patrick + HE 2h WP: 2. Install FIN plug + close FIN doors Patrick + HE 2h WP: 3. Remove scaffolding 3. Remove scaffolding TX54 CP SL martin.gastal@cern.ch

  35. Tue Jan 24 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Restart Cryo Remove scaffolding Remove scaffolding TX54 CP SL martin.gastal@cern.ch

  36. Wed Jan 25 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept A. EN-HE – bring down risers Eric + 2Altead 2h WP: C’. EN-HE – bring down risers Eric + 2Altead 2h WP: B. Move HF-Z out of garage Maf + 2 Rtecs 4h WP: D’. Move HF+Z out of garage Maf + 2 Rtecs 4h WP: C. Move HF-Z on 2 risers Marc/Herve + 2 Rtecs 4h WP: TX54 CP SL martin.gastal@cern.ch

  37. Thu Jan 26 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept 1. Move HF+Z on 2 risers Marc/Herve + 2 Rtecs 4h WP: a. Install torsion prevention support 3VSC + Sandro + 1Altead 2h WP:034 a’. Survey BP Andre + 1VSC 5h WP:035 b. Remove HF handrail on IP side Maf + 2FSU 1h WP: 216 c. Move collar table in by 60cm + remove supports Maf + 2FSU 2h WP: 216 TX54 CP SL martin.gastal@cern.ch

  38. Fri Jan 27 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept a. Install torsion prevention support 3VSC + Sandro + 1Altead 2h WP:034 A. Survey and align BP Patrick + SU2h WP: a’. Survey BP Andre + 1VSC 5h WP:035 B. Install tooling for removal of ext beam 2h WP: b. Remove HF handrail on IP side Maf + 2FSU 1h WP: 216 C. Perform load transfer 4h WP: c. Move collar table in by 60cm + remove supports Maf + 2FSU 2h WP: 216 C’. Support for load transfer 4h WP: D. Survey TAS and Fwd pipe Antje 4h WP: TX54 CP SL martin.gastal@cern.ch

  39. Mon Jan 30 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept 0. EN-HE – lower 2 risers through PX56 2h WP: A. Survey and align BP Patrick + SU2h WP: 1. Remove extension beam 2h WP: B. Install tooling for removal of ext beam 2h WP: C. Perform load transfer 4h WP: C’. Support for load transfer 4h WP: 2. Open HF & T2 30’ WP: Check position of 13.7 BP support: P Lepeule 3. Move HF-Z on 4 risers 4h WP: D. Survey TAS and Fwd pipe Antje 4h WP: TX54 CP SL martin.gastal@cern.ch

  40. Tue Jan 31 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept 0. EN-HE – lower 2 risers through PX56 2h WP: 1. Remove extension beam 2h WP: 1. Install HF- access gangway 2h WP: 2. Open HF & T2 30’ WP: 1’. Install HF- tower reinforcement 3h WP: Check position of 13.7 BP support: P Lepeule 3. Move HF on 4 risers 4h WP: 2. Move HF- towards IP Pascal 15’ WP: 3. Engage and survey 13.7m support 2h WP: TX54 CP SL martin.gastal@cern.ch

  41. Wed Feb 1 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept 1. Install HF+ access gangway 2h WP: a. Check position sensors 2h WP: 1’. Install HF+ tower reinforcement 3h WP: a’. Survey BP 13.7m 3h WP: 2. Move HF+ towards IP Pascal 15’ WP: b. Close T2, BSC, HF- & check VSC cables at 13.7 meter 1h WP: 3. Engage and survey 13.7m support 2h WP: c. Install brackets between CASTOR table and Plug 1h WP: c’. Survey HF- 2h WP: d. Engage HF X stops 1h WP: e. shim Collar 1h WP: TX54 CP SL martin.gastal@cern.ch

  42. Thu Feb 2 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept a. Close RS+Z (cheese wedges) Pascal 3h WP: a. Check position sensors 2h WP: b. Install wooden shims Dmitry 1h WP: a’. Survey BP 13.7m 3h WP: 052 TX54 CP SL martin.gastal@cern.ch

  43. Fri Feb 3 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Install PLT temporary cables Martin d1/2 WP: TX54 CP SL martin.gastal@cern.ch

  44. Mon Feb 6 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Install PLT temporary cables Martin d2/2 WP: TX54 CP SL martin.gastal@cern.ch

  45. Tue Feb 7 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Commission PLT at beam level 8h WP: Survey and Align PLT 4h WP: TX54 CP SL martin.gastal@cern.ch

  46. Wed Feb 8 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Commission PLT at beam level 8h WP: TX54 CP SL martin.gastal@cern.ch

  47. Thu Feb 9 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Commission PLT at beam level 8h WP: TX54 CP SL martin.gastal@cern.ch

  48. Fri Feb 10 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept a. Close T2, BSC, HF+ & check VSC cables at 13.7 meter 1h WP: b. Install brackets between CASTOR table and Plug 1h WP: b’. Survey HF- 2h WP: c. Engage HF X stops 1h WP: d. shim Collar 1h WP: e Close Collar 1h WP: TX54 CP SL martin.gastal@cern.ch

  49. Mon Feb 13 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept a. Close RS+Z (cheese wedges) Pascal 3h WP: b. Install wooden shims Dmitry 1h WP: c. Start Pump down BP: Gerhard 1d WP: TX54 CP SL martin.gastal@cern.ch

  50. Tue Feb 14 Availability of Services: ECAL CMX ZEC CSC RE DT+ RB TK FPIX Survey HCAL TE-VSC EN Dept GS Dept Pump down BP: Gerhard 1d WP: TX54 CP SL martin.gastal@cern.ch