1 / 15

BR/TSD

RRC-04/05 Information meeting. BR/TSD. GE89 Plan. The Plan for VHF/UHF television broadcasting in the African Broadcasting Area and neighbouring countries, Geneva, 1989. Geneva 2003. RRC-04/05 Information meeting. GE89 Plan ning Area. BR/TSD. 5.10 “ African Broadcasting Area ” means:

damien
Download Presentation

BR/TSD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RRC-04/05 Information meeting BR/TSD GE89 Plan The Plan for VHF/UHF television broadcasting in the African Broadcasting Area and neighbouring countries, Geneva, 1989 Geneva 2003

  2. RRC-04/05 Information meeting GE89 Planning Area BR/TSD 5.10 “African Broadcasting Area”means: 5.11 a) African countries, … between the parallels 40° South and 30° North; 5.12 b) islands in the Indian Ocean west of meridian 60° East of Greenwich, situatedbetween the parallel 40° South and the great circle arc joining the points 45E00, 11N30 and 60E00, 15N00; 5.13 c) islands in the Atlantic Ocean east of line B defined in No. 5.8 of theseRegulations, situated between the parallels 40° South and 30° North. Geneva 2003

  3. RRC-04/05 Information meeting GE89 Planning Area BR/TSD neighbouring countries : Bahrain, the Islamic Republic of Iran, Iraq, Kuwait, Oman, Qatar, Saudi Arabia, United Arab Emirates, Republic of Yemen (including those parts of its territory which is not situated in the African Broadcasting Area). Geneva 2003

  4. RRC-04/05 Information meeting GE89 Planning Area BR/TSD African B. Area + neighbours Geneva 2003

  5. RRC-04/05 Information meeting GE89 Bands BR/TSD • 47-68MHz ,(54-68MHz for countries listed in No. 5.169 of RR, not concerned by RRC04-05); • 174-230 MHz; • 230-238 MHz and 246-254 MHz for the countries listed in No. 5.252 of RR; not concerned by RRC04-05; • 470-862 MHz. Geneva 2003

  6. RRC-04/05 Information meeting GE89 Plan stations BR/TSD Originally: 10 313 stations Today: 11 023 stations Digital: 10 stations RRC04-05: 10 801 stations Geneva 2003

  7. RRC-04/05 Information meeting GE89 Plan BR/TSD Geneva 2003

  8. RRC-04/05 Information meeting Modifications to the GE89 Plan BR/TSD No of modifications processed per year Geneva 2003

  9. No. type Limit Limits found in RRC-04/05 Information meeting 4.2.2 TV->TV Distance Ch.1 of Annex 4 4.2.3 TV->FX Field at site Ch.2 of Annex 4 4.2.4 TV->M Field at site Ch.3 of Annex 4 Modifications to the GE89 Plan BR/TSD Coordination is required if certain limits exceeded Geneva 2003

  10. RRC-04/05 Information meeting Modifications to the GE89 Plan BR/TSD • 4.3.7.1 modifications normally accepted if nuisance • field at site of affected station does not exceed: • 47 dB (µV/m) in band I • 53 dB (µV/m) in band III • 62 dB (µV/m) in band IV • 67 dB (µV/m) in band V Geneva 2003

  11. RRC-04/05 Information meeting GE89 Plan Publication of Modifications BR/TSD • Publication in Part A of a SS • Comment period (100 days) • Publication in Part B and entry in GE89 Plan Geneva 2003

  12. GE89 RRC-04/05 Information meeting Action by administrations or BR No. of days Paragraph of Agreement Administrations notify BR of their modifications 4.2.6 BR identifies affected admins. 4.2.8a BR telex to affected admins 0 days 4.2.8b BR publishes a SS 0 days 4.28c - maximum of 90 days from receipt of notification BR sends telex to administrations that have not given a decision 70 days 4.3.11 End of normal period for comments 100 days 4.3.10 and 4.3.3 End of extended period for comments 114 days 4.3.11 - only if requested If there is still disagreement, BR makes studies and informs the administrations concerned 4.3.12 Administrations request publication in Part B <465 days 4.6.1 GE89 Plan BR/TSD Time-limits for notification and comments Geneva 2003

  13. RRC-04/05 Information meeting GE89 Plan BR/TSD BRIFIC SS SUMMARY ON WEB Geneva 2003

  14. RRC-04/05 Information meeting GE89 Plan BR/TSD BRIFIC SS SUMMARY ON WEB Geneva 2003

  15. RRC-04/05 Information meeting GE89 Plan BR/TSD BRIFIC SS SUMMARY ON WEB Geneva 2003

More Related