1 / 17

RIJEKA GATEWAY PROJECT PORT/CITY INTERFACE COMPONENT

RIJEKA GATEWAY PROJECT PORT/CITY INTERFACE COMPONENT. Rijeka Gateway Project Components. Port restructuring and Modernization $75 million By Rijeka Port Authority RPA) International Road Improvements $145 million Construction of Eastern by-pass of Rijeka (by HC)

damon-haney
Download Presentation

RIJEKA GATEWAY PROJECT PORT/CITY INTERFACE COMPONENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RIJEKA GATEWAY PROJECTPORT/CITY INTERFACE COMPONENT

  2. Rijeka Gateway Project Components • Port restructuring and Modernization • $75 million • By Rijeka Port Authority RPA) • International Road Improvements • $145 million • Construction of Eastern by-pass of Rijeka (by HC) • Rehabilitation of Krk Bridge (by HAC) • Port/City Interface Redevelopment • $43 million • Construction of Port Connector Road • $ 37 million • By by HC • Redevelopment of Port for Urban Use • $6 million • by RPA

  3. Redevelopment of Port for Urban Use

  4. Proposed Land Uses(17 Hectares) • Public Promenade Along Waterfront • Passenger Terminal • Marina • Aquarium/Museum • Concert Hall • Hotel(s) • Eateries • Shops • Offices • Residential • Public Parking

  5. Role of Bank • Provides finance for passenger terminal • Finances land clearance • Finances technical assistance in design / build competition

  6. Public / Private Partnership(PPP) • Port Authority • Provides land • Wants compensation • City of Rijeka • Wants waterfront access • Wants civic amenities • Wants economic development • Private Developer • Wants to minimize risk • Wants to maximize return on investment

  7. Design / Build Concept • Competitive Process • Prequalification based on qualifications • Technical proposals • Evaluation of technical proposals • Final technical and financial proposals • Evaluation based on weighted score (design, economic benefit to city, payments to RPA)

  8. City Interface

  9. Capitalizing onRich History

  10. Linking with Pedestrian Precinct

  11. Addressing Traffic Impact

  12. Design of Solution

  13. Parking Problems

  14. On-Site Treatment

  15. Treatment of Waterside Edge

  16. Comments & Questions?

More Related