An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Optical & Vacuum EquipmentLayouts Dennis Coyne Mike Smith Luke Williams 20 Nov 2008 Adv. LIGO Team Meeting, Caltech, Pasadena, CA G0810007-v2

  2. SUBSYSTEM ASSEMBLIES OPTICAL LAYOUT CONSTRAINTS & REQUIREMENTS ZEMAX OPTICAL LAYOUT SOLIDWORKS OPTOMECHANICAL ENVELOPE LAYOUT SOLIDWORKS OPTOMECHANICAL DETAIL LAYOUT Methodology • ZEMAX and SolidWorks are key tools • SolidWorks models are stored in the Adv. LIGO Project PDMWorks vault • Import/export : manual or automated G0810007-v2

  3. Known • All cavity lengths • All COC and IO cavity optic positions • For each individual interferometer, H1, H2, L1 • All COC and IO wedge angles, orientations and tolerances • Beam dump & baffle locations G0810007-v2

  4. References/Sources • Zemax models • SolidWorks Assemblies in the PDM Works vault: • D08xxxx_aligo_io_aos_nonfolded_layout.SLDASM • D08xxxx_aligo_io_aos_folded_layout.SLDASM • References (available from the Systems wiki): • Optical Layout for Advanced LIGO, T010076-02 • Defines constraints, payload element properties and rationale • Will be revised for the Systems FDR (before Apr-2009) • Optic Coordinates and Cavity Lengths (for Stable Recycling Cavities), T080078-05 • The definitive source – has tables with parameters & images of table layouts • Recycling Cavity Mirror Normal Vectors for H1, H2, and L1 (for Stable Recycling Cavities), T080258-00 • BS, CP, and ITM Wedge Angle Tolerance, T080277-02 • COC Polishing Specifications Spreadsheet • To be a Table in the COC Final Design Report, E080494 • The most convenient reference for COC & RC optic parameters G0810007-v2

  5. Unknown or TBD • Optical lever beam layouts • TCS CO2 beam paths are preliminary • TCS Hartmann paths are preliminary • ISC Table layouts are preliminary (HAM1/7 & HAM6/12) • … and not yet integrated into the overall layout • PSL/IO Table layouts are preliminary? • … and not yet integrated into the overall layout (not necessary?) • H2 • Layout in HAM8 is preliminary & tight – may require a move of the chamber • Independent check of Zemax • The PDMWorks vault is a mess! • Needs a lot of clean up for rational layout completion • Need a systematic and practical approach for layout at the full interferometer scale and at the local chamber detail scale • Revised Payload Mass Properties (E040136-00) G0810007-v2

  6. Vacuum Equipment (VE)Rearrangement for LHO POSSIBLY LONGER H2 INPUTMANIFOLD TUBE TO RELEIVEHAM8 PAYLOAD CONJESTION NEW INPUT/OUTPUT MANIFOLD TUBES(4 PLACES) MOVE THE MID STATION H2 BSC CHAMBERS TO THE END STATIONS(2 PLACES) G0810007-v2

  7. Zemax layout examples (from T080078-05) HAM1 HAM3 G0810007-v2

  8. Vertex Layout BSC3 • ITMy (BSC1) and BS (BSC2) chambers not shown HAM4 BS ITMy HAM3 N.B.: Outriggers for the BS will be skewed from positions shown to fit to optics table. G0810007-v2

  9. Input Optics Section New Larger DiameterInput Manifold HAM3 HAM2 HAM1(ISC Readout Chamber) Vacuum Septum Plate G0810007-v2

  10. MC1 MC2 PR3 FI PRM HAM2 G0810007-v2

  11. HAM3 MC2 TOPR3 FROM BS PR2 N.B.: Baffles are not shown. G0810007-v2

  12. BSC-ISI Seismic Assembly, Stage-0 “ring” Arm Cavity BaffleEnvelope Support Tubes ITMx, H2Envelope ETM TransmissionTelescope Envelope New Vacuum Spools H1/H2 End Station G0810007-v2