An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Forniture di beni e servizi nel campo dell'ingegneria elettrica al CERN ILO Industrial Opportunities Days, 6-7 June 2019 Davide Bozzini, CERN Electrical Group

  2. Agenda • Introduction to CERN electrical network • Equipment, activities and contracts • Future activities and contracts • Conclusions ILO Industrial Opportunities Days, 6-7 June 2019

  3. Agenda • Introduction to CERN electrical network • Equipment, activities and contracts • Future activities and contracts • Conclusions ILO Industrial Opportunities Days, 6-7 June 2019

  4. CERN accelerators complex https://cds.cern.ch/record/2225847 ILO Industrial Opportunities Days, 6-7 June 2019

  5. Electrical network: geographical extension • Voltage levels: • 400 kV main incomer • 66 kV transmission • 18 kV distribution • 3.3 kV motors • 0.4 kV users ILO Industrial Opportunities Days, 6-7 June 2019

  6. Type and quantity of equipment source EDMS 559013 v6.0 ILO Industrial Opportunities Days, 6-7 June 2019

  7. Electrical consumption: typical figure GWh MW (max active power) (annualconsumption) • 190 MW (dailyaverage) • 210 MW (10-min average) • 320 MW (instantaneous) • 1’200 GWh (normal operationyear) • 350 GWh (shutdownyear) (dailyaverage) Run 1 Run 2 Long shutdown 1 2011 2012 2013 2014 2015 2016 2017 2018 Courtesy B. Mouche / EN-EL ILO Industrial Opportunities Days, 6-7 June 2019

  8. Electrical consumption: 2018 figures MW GWh • 199 MW (dailyaverage) • 215 MW (10-min average) • 320 MW (instantaneous) • 1’251 GWh (dailyaverage) Courtesy B. Mouche / EN-EL ILO Industrial Opportunities Days, 6-7 June 2019

  9. Electrical consumption: Zoom on LHC Courtesy B. Mouche / EN-EL ILO Industrial Opportunities Days, 6-7 June 2019

  10. Agenda • Introduction to CERN electrical network • Equipment, activities and contracts • Future activities and contracts • Conclusions ILO Industrial Opportunities Days, 6-7 June 2019

  11. “Components” of the network Can be classified in 5 groups: • HIGH VOLTAGE • Transformers • MV Cables • Switchgear • Gensets • LOW VOLTAGE • 48 VDCsystems • UPS • Switchgear and switchboards • LV Cables • Gensets • CONTROL • SCADA • RTUs The activities related to the electrical network target companies with experience in these five sectors • CABLING • Signal cables • Coaxial cables • Water cooled cables • Optical fibers • Connectors • ENERGY • Supply of energy ILO Industrial Opportunities Days, 6-7 June 2019

  12. How activities are structured • In the next slides some examples • Renovation of electrical substations • Upgrade of electrical substations • Water cooled cables • Turnkey projects • In general: • Blanket contracts for the supply of equipment • Service contracts for installation • In some cases: • One contract for equipment supply + installation • For specific projects: • Turn-key contracts • Maintenance: • Service contracts • Consultancy services: • For design studies or work supervision ILO Industrial Opportunities Days, 6-7 June 2019

  13. Example 1: Renovation of substations Integration by CERN, equipment provided via blanket contracts, installation on site via existing service contracts ILO Industrial Opportunities Days, 6-7 June 2019

  14. Example 2: Upgrade of substations Integration by CERN, equipment provided via blanket contracts, installation on site via existing service contracts ILO Industrial Opportunities Days, 6-7 June 2019

  15. Example 3: Water-cooled cables Water-Cooled Cables Current leads Power converters These flexible water-cooled cables or “WCC” are used for transporting high DC current from power converters to superconducting current leads. 40 cables are currently replaced during the LS2. In the long term: • Maintenance activities on existing cables or replacement • New cables for HL-LHC • R&D required ILO Industrial Opportunities Days, 6-7 June 2019

  16. Example 4: Turn key contracts Diesel generator power station for the Meyrin site with three 2.5 MVA gensets ILO Industrial Opportunities Days, 6-7 June 2019

  17. Example 5: Turn key contracts Construction of a new 400 kV substation with a 220 MVA power transformer ILO Industrial Opportunities Days, 6-7 June 2019

  18. Blanket contracts ILO Industrial Opportunities Days, 6-7 June 2019

  19. Service contract for installation ILO Industrial Opportunities Days, 6-7 June 2019

  20. Agenda • Introduction to CERN electrical network • Equipment, activities and contracts • Future activities and contracts • Conclusions ILO Industrial Opportunities Days, 6-7 June 2019

  21. Future activities and projects Short term (2019 to 2020): • This period correspond to the CERN long shut down 2 (LS2) • Required contracts and external contributions are already set-up • Major consolidationare ongoing on the SPS and PS electrical network, through existing frame contract Mid term (2021-2025): • CERN wide consolidationactivities on existing infrastructure • Major works for HL-LHC project in surface and underground(estimated volume up to 30 MCHF) ILO Industrial Opportunities Days, 6-7 June 2019

  22. Contracts to be renewed ILO Industrial Opportunities Days, 6-7 June 2019

  23. Agenda • Introduction to CERN electrical network • Equipment, activities and contracts • Future activities and contracts • Conclusions ILO Industrial Opportunities Days, 6-7 June 2019

  24. Conclusions • The electrical network plays a central role in CERN accelerators complex • The electrical network is evolving permanently according to accelerators needs thus requiring continuous consolidations, extensions and upgrades • Maintenance is mandatory to keep availability and reliability high • Industrial partners are fundamental key players to grant a reliable state-of-the art electrical network ILO Industrial Opportunities Days, 6-7 June 2019

  25. Who to contact • Technical contact: Nicolas.Bellegarde@cern.ch Leader of CERN Electrical Group • Procurement contact: https://procurement.web.cern.ch/en/who-to-contact-at-cern • Related talk Today at 11:30, Procurement at CERN by Charles Carayon ILO Industrial Opportunities Days, 6-7 June 2019

  26. 14-15 September 2019 The Electrical Group will have a exhibition stand You are welcome to visit us Thank you for your attention ? Questions