1 / 3

25 l/s

Deniz. H1990=?. 25 l/s. 10 l/s. (1990). (1985). HRIV=2 1 RBOT=20 KRIV=0. 5 m/g WRIV=5 m M=1 m K 1 =1 m/g VK 1 =0.1 m/g K 2 =0.7 m/g Ss=1e-5 1/m Sy=0.2 3 kuyu alt akifer 2 kuyu üst akifer. Sulama Alanı – 2 %40 süzülme. Sulama Alanı – 1 %40 süzülme. (1990). 5 km. (1988).

danil
Download Presentation

25 l/s

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Deniz H1990=? 25 l/s 10 l/s (1990) (1985) HRIV=21 RBOT=20 KRIV=0.5 m/g WRIV=5 m M=1 m K1=1 m/g VK1=0.1 m/g K2=0.7 m/g Ss=1e-5 1/m Sy=0.2 3 kuyu alt akifer 2 kuyu üst akifer Sulama Alanı – 2 %40 süzülme Sulama Alanı – 1 %40 süzülme (1990) 5 km (1988) (1988) (1988) Nehir 5 km 0 K2 Serbest Akifer -50 -60 175m 100m Basınçlı Akifer Kuyu: 4-9 ay Nehir: 11-5 ay K1 -160

  2. Deniz 0.025 m3/s 0.6 + 0.010 m3/s (1985) HRIV=22 RBOT=20 KRIV=0.3 m/g K1=1 m/g VK1=0.1 m/g K2=0.7 m/g Ss=1e-5 1/m Sy=0.2 0.5 + (1990) (1990) 5 km (1988) (1988) (1988) Nehir 5 km 0 H1990=? Serbest Akifer - 1 -50 -60 Kuyu: 4-9 ay Nehir: 11-5 ay 175m 100m Basınçlı Akifer - 2 -160

  3. XYZ Dosyası X Y K(m/g) 639 352 0.4 1754 745 0.6 3713 1155 0.8 2647 2852 1.2 540 3860 0.9 2836 4524 0.3 4262 4540 0.5 4245 3245 0.6 540 2237 1.5 229 4852 0.2 4745 114 0.6

More Related