170 likes | 542 Views
Reduction of manufacturing time of wagon-tippler. Tanmoy Das 08IM6020 Industrial Engg. And Mgmt. Company profile. TRF Limited, a TATA Enterprise, originally TATA-ROBINS-FRASER Limited was promoted in 1962.
E N D
Reduction of manufacturing time of wagon-tippler Tanmoy Das 08IM6020 Industrial Engg. And Mgmt.
Company profile • TRF Limited, a TATA Enterprise, originally TATA-ROBINS-FRASER Limited was promoted in 1962. • TRF, is a pioneer in India to provide solutions in bulk material handling/processing systems and equipments and Port and Yard equipments. • It provides engineering solutions in the processing plants for core industries like power, mines, ports, steel, cement and fertilizers, dam construction, chemicals/ processes etc.
PRODUCT RANGE OF TRF • Vibrating Equipment -Mechanical • Vibrating Equipment-Electromagnetic • Crushers • Underground Mining Vehicles • Wagon Tippers • Apron Feeders • Plough Feeders • Rotary Table Feeders etc.
Some of the noteworthy projects executed by TRF LTD. includes:- • Downhill regenerative conveyor system for an iron ore mine at Bailadilla. • Coal Handling Plant for India’s first super thermal power station at Singrauli. • High speed vibrating screen for iron ore concentrators of Kudremukh Iron Ore Company. • Automatic mobile wagon loader for coal and iron ore for Tata Steel. • Circular stock piling, blending and reclaiming system for cement factory. • Coal washery. • Coal dust injection system for blast furnace. • Stamping-charging-pushing machine for coke oven.
Some big customers of TRF LTD. • TATA POWER • TATA STEEL • N.T.P.C • B.H.E.L • JINDAL STEEL
Stages of Manufacturing: • Order from the customer: The customer requiring a certain number of certain types of products issues the order to TRF. • Issue of SODS (Sales Order Data-Sheet): The marketing department of the company releases SODS and sends it to the departments of Planning and Design. • Drawing of the product: The design department makes a detailed drawing of the product to be made and sends APL (Advanced Procurement List) along with it to the Planning department. • Purchase Requisition: The above is sent to MMD (Material Management Division) and a Purchase Requisition (PR) is prepared involving the details of the materials to be purchased keeping in view of the inventory already existing, and the capacity of it. • Instruction– Sheet: Planning department sends an IS (Instruction Sheet) to the work-shop, which involves the details of the various units to be assembled in the final product, and acts as a guide to the Shop Engineers to manufacture the required product. • Purchase Order: The MMD then releases a PO (Purchase Order) which is sent to the various raw-material making companies. After the procurement of the raw-goods, the manufacturing is started in the work-shop.
Main cause of high production time • To reduce high cycle time • To reduce high non-productive time • Identify and reduce the unnecessary work elements • Identify and standardize the items with high production volume and manufacture in a lot. • Increase the shop floor space
Main time consuming areas • Design of equipments • Production planning • Procurement of items from outside. • Manufacturing (non-productive time) • Assembly
Main parts of wagon tippler • Cradle • End ring • Side beam • Top clamping arrangement • Drive assembly
TOP CLAMP SIDE BEAM END RING WAGON MOTOR CRADLE WAGON TIPPLER
TOP CLAMP SIDE BEAM END RING WAGON CRADLE MOTOR PARTS OF WAGON TIPPLER