190 likes | 364 Views
CASTOR at CMS Enhancing Forward Physics. Diffractive & Forward Physics Workshop Antwerp 25-26/10, 2007. Apostolos D. Panagiotou University of Athens http://cmsdoc.cern.ch/castor/. CMS Coverage in p T - ï¨. CMS fwd calorimetry up to | ï¨ | ï‚» 5 + Castor + ZDC.
E N D
CASTOR at CMS Enhancing Forward Physics Diffractive & Forward Physics Workshop Antwerp 25-26/10, 2007 Apostolos D. Panagiotou University of Athens http://cmsdoc.cern.ch/castor/
CMS Coverage in pT - CMS fwd calorimetry up to || 5 + Castor + ZDC figure adapted from Risto Orava (Diffraction 2006) CMS pTmax~s exp(-η) 1000 100 HF HF 10 pT (GeV) CASTOR CASTOR 1 ZDC ZDC T2 T1 T1 T2 0.1 RP -12 -10 -8 -6 -4 -2 0 +2 +4 +6 +8 +10 +12 h Unprecedented coverage at hadron colliders !
Physics with CMS Forward Calorimeters Hadronic Forward (HF) CASTOR IP ZDC • Low-x dynamics: • Parton saturation, BFKL/CCFM dynamics, proton structure, multi-parton scattering • Diffraction • Measurements for cosmic ray data analysis: • Forward energy and particle flows, minimum bias event structure • Two-photon interactions and peripheral collisions • QED processes to determine luminosity to O(1%), via pp pp ee and pp pp • Forward physics in pA and AA collisions • New forward physics phenomena: • Disoriented Chiral Condensates, incoherent pion emission, Centauros, Strangelets….
Recent Developments • CASTOR approved by CMS-MB as CMS baseline detector on 21-05-07 • One calorimeter will be built by end of 2008 (224 channels) • FEA calculations completed • Prototype construction & assembly study completed • Skeleton construction studies completed • Full length octant prototype constructed and beam-tested in August, 2007 • EDR to be completed by end of October 2007 • CASTOR sim-digi software in HCAL CMSSW-1_7 release • 10. Resources approaching required level for completion. Missing ~ 150 k€ • New Institutes are Welcome ! • Currently working on: • - test beam data analysis, • - electronics, construction • - software ( implementation in simulation of digi & reco…) • - physics simulations, …..
Collaborating Institutes & Tasks • Antwerp PMTs, FE, trigger, DAQ, funding; Electronics coordination • Athens Design, Q-plates, SW, MC, funding; Project coordination • CERN Beam test/EDR reports; SW-Physics coordination • Cukurova PMT testing, assembly • DESY FEA, construction, electronics, funding; Project coordination • JINR Dubna Mechanical design; Technical coordination • INR, Moscow Light guides & 2mm Q-plates • ITEP, Moscow Laser/LED calibration system • Northeastern Readout devices, MC, SW, construction
CASTOR Calorimeter Design Calorimeter (10λI): (2)EM + (12)HD sections, 224 channels
CASTOR Calorimeter on Support 2 (½) calorimeter sections
CASTOR Calorimeter Installation ½ CASTOR Collar HF
CASTOR in beam line: Collar platform with HF, Collar and Rotating shielding Rotating Collar HF CASTOR T1 T2
CASTOR Prototype Construction/Assembly Study Construction of 32cm long, (½) calorimeter: 4 octants; (2) EM + (2) HD sections Instrumenting one octant: (4) EM + (4) HD RUs Design: DUBNA Construction: DESY, Northeastern Rear Front
Prototype for BT 2007 Full length Octant EM section 4 channels HAD section full length 24 chan. 1 3 1 3 Octant container Al plate
Construction of Prototype Q-plate W-plate
CASTOR beam test 2007 Full-length octant prototype
PRELIMINARY day 2 day 14
μ-Βeam 50 GeV μ- EM1 HD1 μ- μ- EM3 PRELIMINARY
e- Beam Channel σ/E PRELIMINARY
π- Beam Channel PRELIMINARY σ/E
Summary • Forward Physics spans a broad range of pp and HI high energy physics topics, from fundamental properties of QCD to new physics phenomena. • Large cross sections ensure early publications on various topics. • Discovery potential: • - Beyond Standard Model (BSM): Large amount of missing transverse energy (MET) • - Higgs: Vector-Boson-Fusion (VBF): Two jets at forward/backward rapidities (pp→jj H X). Lower background than the dominant gluon-gluon fusion channel (see David’s talk). • - Exotics in HI Interactions: “Strangelets”, Disoriented-Chiral-Condensates (DCC) • CASTOR calorimeter project is progressing fast: • - Lots of data taken in test beam; Analysis under way. • Engineering design review scheduled for the 31st October. Document in final stage. • Construction of calorimeter to start in November 2007. • Aim & need to be in beam line as soon as LHC starts, to take advantage of low lumi runs. • New Institutes are welcome !